PSR Addendum - Part2 - Pon
PSR Addendum - Part2 - Pon
A. Labour
B. Material
3.2.2A Earth work excavation in soil unsuitable for road cum 23.48
construction such as marshy soil including
pumping out water, removal of the same and
disposal within a lead of 15 metres - extra for
additional lead for ordinary soil - when over all
lead is more than 60 metres by animal driven
cart capacity 0.5 cum. as per clause no 302 of
MOST specification.
3.2.3A Earth work excavation in soil unsuitable for road cum 76.44
construction such as marshy soil including
pumping out water, removal of the same and
disposal within a lead of 15 metres - extra for
additional lead for ordinary soil - when lead of
earth work is more than 495 metres - loading
and unloading by manual means and carriage
by tipper 5 tonnes capacity. - lead above 495
metres but upto 1 km. As per clause no 302 of
MOST specification.
3.2.3B Earth work excavation in soil unsuitable for road cum 81.04
construction such as marshy soil including
pumping out water, removal of the same and
disposal within a lead of 15 metres - extra for
additional lead for ordinary soil - when lead of
earth work is more than 495 metres - loading
and unloading by manual means and carriage
by tipper 5 tonnes capacity lead for 2 km. As per
clause no 302 of MOST specification.
3.2.3C Earth work excavation in soil unsuitable for road cum 84.73
construction such as marshy soil including
pumping out water, removal of the same and
disposal within a lead of 15 metres - extra for
additional lead for ordinary soil - when lead of
earth work is more than 495 metres - loading
and unloading by manual means and carriage
by tipper 5 tonnes capacity lead for 3 km. As
per clause no 302 of MOST specification.
3.2.3D Earth work excavation in soil unsuitable for road cum/km 3.45
construction such as marshy soil including
pumping out water, removal of the same and
disposal within a lead of 15 metres - extra for
additional lead for ordinary soil - when lead of
earth work is more than 495 metres - loading
and unloading by manual means and carriage
by tipper 5 tonnes capacity lead for 4 km. to 10
km. As per clause no 302 of MOST
3.2.3E Earth work excavation in soil unsuitable for road cum/km 3.22
construction such as marshy soil including
pumping out water, removal of the same and
disposal within a lead of 15 metres - extra for
additional lead for ordinary soil - when lead of
earth work is more than 495 metres - loading
and unloading by manual means and carriage
by tipper 5 tonnes capacity lead beyond 10 km.
As per clause no 302 of MOST specification.
3.2.4A Earth work excavation in soil unsuitable for road cum 24.68
construction such as marshy soil including
pumping out water, removal of the same and
disposal within a lead of 15 metres - extra for
additional lead for ordinary soil - when lead of
earth work is more than 495 metres - loading
and unloading by mechanical means. As per
clause no 302 of MOST specification.
3.2.4B Earth work excavation in soil unsuitable for road cum 29.28
construction such as marshy soil including
pumping out water, removal of the same and
disposal within a lead of 15 metres - extra for
additional lead for ordinary soil - when lead of
earth work is more than 495 metres - loading
and unloading by mechanical means lead for 2
km. As per clause no 302 of MOST
3.2.4C Earth work excavation in soil unsuitable for road cum 32.97
construction such as marshy soil including
pumping out water, removal of the same and
disposal within a lead of 15 metres - extra for
additional lead for ordinary soil - when lead of
earth work is more than 495 metres - loading
and unloading by mechanical means lead for 3
km. As per clause no 302 of MOST
3.2.4D Earth work excavation in soil unsuitable for road cum/km 3.45
construction such as marshy soil including
pumping out water, removal of the same and
disposal within a lead of 15 metres - extra for
additional lead for ordinary soil - when lead of
earth work is more than 495 metres - loading
and unloading by mechanical means lead for 4
km. to 10 km. As per clause no 302 of MOST
specification.
3.2.4E Earth work excavation in soil unsuitable for road cum/km 3.22
construction such as marshy soil including
pumping out water, removal of the same and
disposal within a lead of 15 metres - extra for
additional lead for ordinary soil - when lead of
earth work is more than 495 metres - loading
and unloading by mechanical means lead
above 10 km. As per clause no 302 of MOST
specification.
3.2.4F Earth work excavation in soil unsuitable for road cum 22.70
construction such as marshy soil including
pumping out water, removal of the same and
disposal within a lead of 15 metres - extra for
additional lead for hard soil. As per clause no
302 of MOST specification.
3.7.1 Extra for laying earth as per specification for cum 3.89
compaction in 250mm thick loose layers and
dressing but excluding rolling and watering by
manual means when laying of earth in layers is
done simultaneously with excavation of earth
work. As per clause no 305.3.5 of MOST
specification.
3.7.3 Extra for laying earth as per specification for cum 15.63
compaction in 250mm thick loose layers and
dressing but excluding rolling and watering by
mechanical means from earth in stockpiles. As
per clause no 305.3.5 of MOST specification.
3.7.4 Extra for watering the earth to bring the earth cum 4.06
upto required optimum moisture content by
mechanical means - compacted earth. As per
clause no 305.3.5 of MOST specification.
3.7.5 Extra for rolling to specification with the use of cum 10.98
vibratory roller when earth is at suitable
moisture contents with desired field density not
less than 95% of maximum dry density
(modified heavy proctor test). As per clause no
305.3.5 of MOST specification.
3.7.6 Extra for rolling to specification with the use of cum 13.73
vibratory roller when earth is at suitable
moisture contents with desired field density not
less than 100% of maximum dry density
(modified heavy proctor test). As per clause no
305.3.5 of MOST specification.
5.2 Providing and applying tack coat with bitumen sqm 4.03
emulsion using emulsion pressure distributor at
the rate of 0.20 kg. per sqm. on the prepared
bituminous / granular surface cleaned with
mechanical broom. (As per MoRTH
specification, 4th Revision)
5.12A Providing and laying seal coat sealing the voids Sqm 20.08
in a bituminous surface laid to the specified
levels, grades and cross fall using Type A seal
coat. (As per MoRTH specification, 4th Revision)
5.12B Providing and laying of premix sand seal coat Sqm 15.21
with HMP of appropriate capacity not less than
40 to 60 tonne/hour using crushed stone
chipping 6.7 mm size and penetration bitumen
of suitable grade - Type B (As per MoRTH
specification, 4th Revision)
7 . Culverts
Code Description Unit Rate
7.2 Plain cement concrete m-15 mix with stone cum 2246.51
aggregates 20mm nominal size mechanically
mixed and vibrated in foundation upto a depth
of 1.50 metres below ground level and/or 1.50
metres above ground/bed level.
7.3 Plain cement concrete m-15 mix with stone cum 2283.32
aggregates 20mm nominal size mechanically
mixed and vibrated in superstructure upto 4.00
metre above, 1.50 metre from ground/bed level.
7.7 First class brick in cement mortar 1:3 upto a cum 1579.71
depth of 1.50 metres below ground and above
1.50 from bed/ground level.
7.9 Brick or edge flooring with 1st class bricks sqm 169.51
including cement slurry in cement sand mortar 1:4
7.16 Cement plaster 12mm thick in cement mortar 1:3 sqm 55.92
1.21 Back filling behind abutment, wing wall and Cum 337.64
return wall complete - gravelly material.
1.22 Back filling behind abutment, wing wall and Cum 490.76
return wall complete - sandy material.
2 . Foundation
Code Description Unit Rate
2.4 Providing and laying cutting edge of mild steel Tonne 45589.50
for well foundation complete.
3.1 Brick masonry work in cement mortar 1:3 for Cum 1741.00
substructure complete excluding pointing and
plastering.
2. FOUNDATION
2. SUBSTRUCTURE
4. SUPERSTRUCTURE