The document is a bill for exploratory boring work for bridge construction under a government program. It details 4 bore holes at 2 bridge locations, with depths ranging from 1 to 5 meters below bed level. The total cost for the boring work is Rs. 104,252, with an additional 18% GST of Rs. 18,765, bringing the total amount to Rs. 123,017.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
81 views1 page
Boring Bill
The document is a bill for exploratory boring work for bridge construction under a government program. It details 4 bore holes at 2 bridge locations, with depths ranging from 1 to 5 meters below bed level. The total cost for the boring work is Rs. 104,252, with an additional 18% GST of Rs. 18,765, bringing the total amount to Rs. 123,017.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Bill Exploratory Boring
Kindly find enclosed herewith for Exploratory Boring work at Bridge Location Under PMGSY-III DPR Year 2019-2020. Summary of Bore Work as mentioned below:
No of Depth of Rate per Amount
S. no DISTRICT BLOCK ROAD NAME Bore Bore metre (Rs) CHABI TO MANDLA GUGHRI SUREHALI 1 Ch- 0+125 Mtr Length of Bridge 60 Mtr Location - A1, P1 , A2
Ch- 8+475 Mtr Length of Bridge 70 Mtr
Location - A1 a) Upto 1.0 m below bed level 4 1 2450 9800 b) Beyond 1.0 m depth upto 5.0 m 4 4 2562 40992 c) Beyond 5.0 m depth 4 5 2673 53460 40 104252 Total 104252 Add GST 18 % 18765 Total Amount i/e GST 123017