0% found this document useful (0 votes)
109 views

Project Phoenix (PM) - Daily Status

This document contains a log of success messages for checking and creating various records and master data for deleted, new, and existing plants in an ERP system. It logs the successful deletion of records like notifications, work orders, functional locations, equipment, and BOMs for deleted plants. It also logs the successful creation and checking of these same record types for new and existing plants. The document provides a comprehensive list of data objects and the status of how they were handled during a plant data migration or archival process.

Uploaded by

Santrupta Panda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
109 views

Project Phoenix (PM) - Daily Status

This document contains a log of success messages for checking and creating various records and master data for deleted, new, and existing plants in an ERP system. It logs the successful deletion of records like notifications, work orders, functional locations, equipment, and BOMs for deleted plants. It also logs the successful creation and checking of these same record types for new and existing plants. The document provides a comprehensive list of data objects and the status of how they were handled during a plant data migration or archival process.

Uploaded by

Santrupta Panda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 65

Particulars/Plants 1100 1111

Notification creation checking for deleted plant


AC-Accidental Info.
BD-Breakdown
CB-Calibration Request
CM-Corrective Maint
CV-Civil Maint.Request
GN-General
MF-Modification & Expa.
PD-Predictive/CBM
PM-Preventive
SC-Statutory Compliance
ST-Shutdown Request
Work Order Creation Checking for deleted Plants
BD01-Breakdown Maintenance Order
CB01-Calibration Order
CV01-Civil Maintenance Order
GN01-General Maintenance Order
MF01-Modification & Expansion Order
PD01-Predictive/CB Maintenance Order
PM01-Preventive Maintenance order
SC01-Statutory & Compliance Maintenance Order
ST01-Shutdown Maintenance Order
Functional Location Creation for deleted Plants
M-Technical system - standard
S-Structure
Equipment Creation for Deleted Plants
H-Heavy Vehicle
L-Light Vehicle
M-Machines
P-Production resources/tools
Q-Test/measurement equipment
S-Customer equipment
T-Transporter Vehicle
Work Center Creation for Deleted Plants (Plant Maintenance
type-0005)
Task List Creation for Deleted Plants
Equipment Tasklist
General task List
Functional Location Tasklist
Maintenance Plan creation for Deleted Plants
Quantitaive Measuring Point Creation for deleted Plants
A-Audit and Statutory(EQ Status)
C-Equipment Status
M-MeasPoint (Counters)
O-Observation
V-General usage.
Counters Measuring Point Creation for deleted Plants
A-Audit and Statutory(EQ Status)
C-Equipment Status
M-MeasPoint (Counters)
O-Observation
V-General usage.
Qualitative Measuring Point Creation for deleted Plants
A-Audit and Statutory(EQ Status)
C-Equipment Status
M-MeasPoint (Counters)
O-Observation
V-General usage.
Material BOM Creation checking for Deleted Plants
Equipment BOM Creation for Deleted Plants
Functional Location BOM Creation for Deleted Plants
Notification creation checking for New & Existing Plants
AC-Accidental Info.
BD-Breakdown
CB-Calibration Request
CM-Corrective Maint
CV-Civil Maint.Request
GN-General
MF-Modification & Expa.
PD-Predictive/CBM
PM-Preventive
SC-Statutory Compliance
ST-Shutdown Request
Work Order Creation Checking for New & Existing Plants
BD01-Breakdown Maintenance Order
CB01-Calibration Order
CV01-Civil Maintenance Order
GN01-General Maintenance Order
MF01-Modification & Expansion Order
PD01-Predictive/CB Maintenance Order
PM01-Preventive Maintenance order
PM05-Calibration order
SC01-Statutory & Compliance Maintenance Order
ST01-Shutdown Maintenance Order
Functional Location Creation for New & Existing Plants
M-Technical system - standard
S-Structure
Equipment Creation for New & Existing Plants
H-Heavy Vehicle
L-Light Vehicle
M-Machines
P-Production resources/tools
Q-Test/measurement equipment
S-Customer equipment
T-Transporter Vehicle
Work Center Creation for New & Existing Plants s (Plant
Maintenance type-0005)
Task List Creation for New & Existing Plants
Equipment Tasklist
General task List
Functional Location Tasklist
Maintenance Plan creation for New & Existing Plants

Quantitaive Measuring Point Creation for New & Existing Plants


A-Audit and Statutory(EQ Status)
C-Equipment Status
M-MeasPoint (Counters)
O-Observation
V-General usage.
Counters Measuring Point Creation for New & Existing Plants
A-Audit and Statutory(EQ Status)
C-Equipment Status
M-MeasPoint (Counters)
O-Observation
V-General usage.

Qualitative Measuring Point Creation for New & Existing Plants


A-Audit and Statutory(EQ Status)
C-Equipment Status
M-MeasPoint (Counters)
O-Observation
V-General usage.
Material BOM Creation checking for New & Existing Plants
Equipment BOM Creation for New & Existing Plants
Functional Location BOM Creation for New & Existing Plants
1112 1113 1114 1131 1300 1301
1302 1303 1707 1792 1798 2100
2200 2201 2203 2204 2300 2301
2302 2304 2305 2306 2350 4100
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success

Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
Success
4200 4300 5300 3300 3301 3100
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success

Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
3305 3306 3101 3304 3303 3302
6300 7100 7300 1132 1200 1201
1202 2307 1351 1353 1115 1120
1220 1221 1223 1224 1320 1321
1322 1324 1325 1326 1720 1140
1240 1340 1323 1116 1327 1700
1701
Particulars/Plants 1100 1111
BOM Creation for Material of deleted plants
FG type
SFG type
Workcenter Center creation for deleted plants
Rate routing for deleted plants
Production version for deleted plants
Product cost collector creation for deleted plants
BOM Creation for Material of new & Existing plants
FG type
SFG type
Workcenter Center creation for new & Existing plants
Rate routing for new & Existing plants
Production version for new & Existing plants
Product cost collector creation for new & Existing plants
1112 1113 1114 1131 1300 1301
1302 1303 1707 1792 1798 2100
2200 2201 2203 2204 2300 2301
2302 2304 2305 2306 2350 4100
Success
Success
Success
Success
Success
Success
Success
4200 4300 5300 3300 3301 3100
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
Success Success
3305 3306 3101 3304 3303 3302
6300 7100 7300 1132 1200 1201
1202 2307 1351 1353 1115 1120
1220 1221 1223 1224 1320 1321
1322 1324 1325 1326 1720 1140
1240 1340 1323 1116 1327 1700
1701
Particulars/Plants 1100 1111
Create Material Master Quality Parameter for deleted plants
Create MIC for deleted Plants
Create Inspection Plan for deleted Plants
Create Inspection lot for deleted plants
Create Material Master Quality Parameter for new & Existing plants
Create MIC for new & Existing plants
Create Inspection Plan for new & Existing plants
Create Inspection lot for new & Existing plants
1112 1113 1114 1131 1300 1301
1302 1303 1707 1792 1798 2100
2200 2201 2203 2204 2300 2301
2302 2304 2305 2306 2350 4100
Success
Success
Success
Success
4200 4300 5300 3300 3301 3100
Success Success
Success Success
Success Success
Success Success
3305 3306 3101 3304 3303 3302
6300 7100 7300 1132 1200 1201
1202 2307 1351 1353 1115 1120
1220 1221 1223 1224 1320 1321
1322 1324 1325 1326 1720 1140
1240 1340 1323 1116 1327 1700
1701

You might also like