SprinkCALC III Report - Bld7.Riser1
SprinkCALC III Report - Bld7.Riser1
Design Areas
Design Area Calc. Mode Occupancy Area of Total Water Pressure @ Min. Min. Min. Calculated Hose Margin To
Name (Model) Application Source Density Pressure Flow Heads Streams Source
Required
1 Demand (HW) extra hazard 231.8 7514.05 24 1.51 198.72 28 1900 1.58
7.39
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 1
HYDRAULIC CALCULATIONS
for
Job Information
Project Name : FAS Building7
Contractor Information
Name of Contractor:
Address: City:
Name of Designer:
Design
Remote Area Name 1
Density (l/min/m²) 24
Special Heads
Source W1
Notes
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 2
Job : FAS Building7 Node Labels: Node Reference
Pipe Labels: Off
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 3
Job : FAS Building7
Hoses
Inside Hose Flow / Standpipe Demand (l/min) 0
Sprinklers
Ovehead Sprinkler Flow (l/min) 5614.05
Other
Required Margin of Safety (bar) 0
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 4
Job : FAS Building7
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 5
Job : FAS Building7
Graph Labels
Values
Label Description
Flow (l/min) Pressure (bar)
S1 Supply point #1 - Static 0 9.75
S2 Supply point #2 7571 8.95
S3 Supply point #3 11356 7.64
D1 Elevation Pressure 0 1.25
D2 System Demand 7514.05 7.39
Open Heads
Required Calculated
Head Ref. Head Type Coverage K-Factor
Density Flow Pressure Density Flow Pressure
Overhead
P1 8.3 161.4 24 198.72 1.51 24.7 204.71 1.61
Sprinkler
Overhead
P10 8.3 161.4 24 198.72 1.51 24 198.76 1.52
Sprinkler
Overhead
P11 8.3 161.4 24 198.72 1.51 24 198.74 1.52
Sprinkler
Overhead
P12 8.3 161.4 24 198.72 1.51 24 198.78 1.52
Sprinkler
Overhead
P13 8.3 161.4 24 198.72 1.51 24 199.12 1.52
Sprinkler
Overhead
P14 8.3 161.4 24 198.72 1.51 24.1 199.16 1.52
Sprinkler
Overhead
P15 8.3 161.4 24 198.72 1.51 24.1 199.66 1.53
Sprinkler
Overhead
P16 8.3 161.4 24 198.72 1.51 24.1 199.26 1.52
Sprinkler
Overhead
P17 8.3 161.4 24 198.72 1.51 24.1 199.41 1.53
Sprinkler
Overhead
P18 8.3 161.4 24 198.72 1.51 24.2 200.19 1.54
Sprinkler
Overhead
P19 8.3 161.4 24 198.72 1.51 24.4 201.97 1.56
Sprinkler
Overhead
P2 8.3 161.4 24 198.72 1.51 24.7 204.62 1.61
Sprinkler
Overhead
P20 8.3 161.4 24 198.72 1.51 24.8 205.1 1.61
Sprinkler
Overhead
P21 8.3 161.4 24 198.72 1.51 24.1 199.24 1.52
Sprinkler
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 6
Overhead
P22 8.3 161.4 24 198.72 1.51 24.8 205.44 1.62
Sprinkler
Overhead
P23 8.3 161.4 24 198.72 1.51 24.4 202.24 1.57
Sprinkler
Overhead
P24 8.3 161.4 24 198.72 1.51 24.2 200.41 1.54
Sprinkler
Overhead
P25 8.3 161.4 24 198.72 1.51 24.1 199.6 1.53
Sprinkler
Overhead
P26 8.3 161.4 24 198.72 1.51 24.1 199.41 1.53
Sprinkler
Overhead
P27 8.3 161.4 24 198.72 1.51 24.1 199.43 1.53
Sprinkler
Overhead
P28 8.3 161.4 24 198.72 1.51 24.1 199.8 1.53
Sprinkler
Overhead
P3 8.3 161.4 24 198.72 1.51 24.3 201.55 1.56
Sprinkler
Overhead
P4 8.3 161.4 24 198.72 1.51 24.3 201.47 1.56
Sprinkler
Overhead
P5 8.3 161.4 24 198.72 1.51 24.1 199.74 1.53
Sprinkler
Overhead
P6 8.3 161.4 24 198.72 1.51 24.1 199.68 1.53
Sprinkler
Overhead
P7 8.3 161.4 24 198.72 1.51 24 198.89 1.52
Sprinkler
Overhead
P8 8.3 161.4 24 198.72 1.51 24 198.94 1.52
Sprinkler
Overhead
P9 8.3 161.4 24 198.72 1.51 24 198.72 1.51
Sprinkler
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 7
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis
Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
l/min m² bar bar
lpm/bar½
m l/min l/min/m² bar l/min
P9 Overhead Sprinkler 161.4 198.72 8.3 1.51 1.51
11.5 HEAD Open 0 24 -1.25 198.72
P11 Overhead Sprinkler 161.4 198.74 8.3 1.52 1.51
11.5 HEAD Open 0.02 24 -1.25 198.72
P10 Overhead Sprinkler 161.4 198.76 8.3 1.52 1.51
11.5 HEAD Open 0.04 24 -1.25 198.72
P12 Overhead Sprinkler 161.4 198.78 8.3 1.52 1.51
11.5 HEAD Open 0.06 24 -1.25 198.72
P7 Overhead Sprinkler 161.4 198.89 8.3 1.52 1.51
11.5 HEAD Open 0.17 24 -1.25 198.72
P8 Overhead Sprinkler 161.4 198.94 8.3 1.52 1.51
11.5 HEAD Open 0.22 24 -1.25 198.72
P13 Overhead Sprinkler 161.4 199.12 8.3 1.52 1.51
11.5 HEAD Open 0.41 24 -1.25 198.72
P14 Overhead Sprinkler 161.4 199.16 8.3 1.52 1.51
11.5 HEAD Open 0.44 24.1 -1.25 198.72
P21 Overhead Sprinkler 161.4 199.24 8.3 1.52 1.51
11.4 HEAD Open 0.53 24.1 -1.24 198.72
P16 Overhead Sprinkler 161.4 199.26 8.3 1.52 1.51
11.4 HEAD Open 0.54 24.1 -1.24 198.72
P17 Overhead Sprinkler 161.4 199.41 8.3 1.53 1.51
11.4 HEAD Open 0.69 24.1 -1.24 198.72
P26 Overhead Sprinkler 161.4 199.41 8.3 1.53 1.51
11.4 HEAD Open 0.69 24.1 -1.24 198.72
P27 Overhead Sprinkler 161.4 199.43 8.3 1.53 1.51
11.4 HEAD Open 0.71 24.1 -1.24 198.72
P25 Overhead Sprinkler 161.4 199.6 8.3 1.53 1.51
11.4 HEAD Open 0.88 24.1 -1.24 198.72
P15 Overhead Sprinkler 161.4 199.66 8.3 1.53 1.51
11.4 HEAD Open 0.94 24.1 -1.24 198.72
P6 Overhead Sprinkler 161.4 199.68 8.3 1.53 1.51
11.5 HEAD Open 0.96 24.1 -1.25 198.72
P5 Overhead Sprinkler 161.4 199.74 8.3 1.53 1.51
11.5 HEAD Open 1.02 24.1 -1.25 198.72
P28 Overhead Sprinkler 161.4 199.8 8.3 1.53 1.51
11.4 HEAD Open 1.08 24.1 -1.24 198.72
P18 Overhead Sprinkler 161.4 200.19 8.3 1.54 1.51
11.4 HEAD Open 1.47 24.2 -1.24 198.72
P24 Overhead Sprinkler 161.4 200.41 8.3 1.54 1.51
11.4 HEAD Open 1.69 24.2 -1.24 198.72
P4 Overhead Sprinkler 161.4 201.47 8.3 1.56 1.51
11.5 HEAD Open 2.75 24.3 -1.25 198.72
P3 Overhead Sprinkler 161.4 201.55 8.3 1.56 1.51
11.5 HEAD Open 2.83 24.3 -1.25 198.72
P19 Overhead Sprinkler 161.4 201.97 8.3 1.56 1.51
11.4 HEAD Open 3.25 24.4 -1.24 198.72
P23 Overhead Sprinkler 161.4 202.24 8.3 1.57 1.51
11.4 HEAD Open 3.52 24.4 -1.24 198.72
P2 Overhead Sprinkler 161.4 204.62 8.3 1.61 1.51
11.5 HEAD Open 5.9 24.7 -1.25 198.72
P1 Overhead Sprinkler 161.4 204.71 8.3 1.61 1.51
11.5 HEAD Open 5.99 24.7 -1.25 198.72
P20 Overhead Sprinkler 161.4 205.1 8.3 1.61 1.51
11.4 HEAD Open 6.38 24.8 -1.24 198.72
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 8
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis
Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
l/min m² bar bar
lpm/bar½
m l/min l/min/m² bar l/min
P22 Overhead Sprinkler 161.4 205.44 8.3 1.62 1.51
11.4 HEAD Open 6.72 24.8 -1.24 198.72
584 Node 1.86
11.2 NODE -1.23
583 Node 1.86
11.2 NODE -1.23
552 Node 1.86
11.2 NODE -1.23
551 Node 1.86
11.2 NODE -1.23
585 Node 1.87
11.2 NODE -1.23
553 Node 1.87
11.2 NODE -1.23
582 Node 1.87
11.2 NODE -1.23
550 Node 1.87
11.2 NODE -1.23
616 Node 1.87
11.1 NODE -1.22
615 Node 1.87
11.1 NODE -1.22
617 Node 1.88
11.1 NODE -1.22
674 Node 1.88
11.1 NODE -1.22
675 Node 1.88
11.1 NODE -1.22
673 Node 1.88
11.1 NODE -1.22
614 Node 1.88
11.1 NODE -1.22
586 Node 1.88
11.2 NODE -1.23
554 Node 1.88
11.2 NODE -1.23
006 Node 1.88
11.1 NODE -1.22
618 Node 1.89
11.1 NODE -1.22
672 Node 1.89
11.1 NODE -1.22
587 Node 1.91
11.2 NODE -1.23
555 Node 1.92
11.2 NODE -1.23
619 Node 1.92
11.1 NODE -1.22
671 Node 1.93
11.1 NODE -1.22
588 Node 1.97
11.2 NODE -1.23
556 Node 1.97
11.2 NODE -1.23
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 9
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis
Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
l/min m² bar bar
lpm/bar½
m l/min l/min/m² bar l/min
547 Node 1.98
10.9 NODE -1.2
548 Node 1.98
10.9 NODE -1.2
546 Node 1.98
10.9 NODE -1.2
008 Node 1.98
10.9 NODE -1.2
620 Node 1.98
11.1 NODE -1.22
545 Node 1.98
10.9 NODE -1.2
009 Node 1.98
10.9 NODE -1.2
670 Node 1.99
11.1 NODE -1.22
513 Node 4.39
10.9 NODE -1.2
512 Node 4.39
10.9 NODE -1.2
511 Node 4.4
10.9 NODE -1.2
510 Node 4.41
10.9 NODE -1.2
509 Node 4.44
10.9 NODE -1.2
042 Node 4.49
10.9 NODE -1.2
051 Node 5.72
5.5 NODE -0.67
052-O Node 5.85
4.41 NODE -0.56
052-I Node 6
4.105 NODE -0.53
055-O Node 6.01
4.067 NODE -0.53
055-I Node 6.04
3.8 NODE -0.5
H1 Outside Hose 6.15
1900
1.7 HOSE -0.29 1900
057 Node 6.23
3.5 NODE -0.47
053 Node 6.52
1.7 NODE -0.29
054 Node 6.54
1.7 NODE -0.29
056 Node 6.78
1.7 NODE -0.29
072 Node 7.32
-1.3 NODE 0
071 Node 7.32
-1.3 NODE 0
078 Node 7.32
-1.3 NODE 0
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 10
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis
Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
l/min m² bar bar
lpm/bar½
m l/min l/min/m² bar l/min
065 Node 7.32
-1.3 NODE 0
075 Node 7.32
-1.3 NODE 0
061 Node 7.32
-1.3 NODE 0
059 Node 7.32
-1.3 NODE 0
074 Node 7.32
-1.3 NODE 0
073 Node 7.32
-1.3 NODE 0
W1 Supply 7.39
-7514.05
-1.3 SUPPLY 0
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 11
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis
Pipe Data
Path # Type Schedule HWC Fittings Length Flow Fr.Resist. Vel.Pres. Start
Pipe Ref. Hgroup Size Rough. Eq.Len. Total Len. Velocity Loss Frict. Loss Elev. End
m l/min bar/m bar
mm m m m/s bar bar
1 Sprig 40 120 1(us.Tee-Br); 0.3 198.72 0.1752 0.18 584
1151 PIPE 1 0.1016 1.524 1.824 5.94 0.32 0.03 P9
1 Brline 10 120 155.61 0.0013 0.00 585
1(us.Tee-Run); 2.5
604 PIPE 2.5 0.1016 0.74 0.00 0 584
1 Brline 10 120 354.5 0.0058 0.01 586
1(us.Tee-Run); 2.5
605 PIPE 2.5 0.1016 1.68 0.01 0 585
1 Brline 10 120 554.18 0.0132 0.03 587
1(us.Tee-Run); 2.5
606 PIPE 2.5 0.1016 2.63 0.03 0 586
1 Brline 10 120 755.65 0.0234 0.06 588
1(us.Tee-Run); 2.5
607 PIPE 2.5 0.1016 3.58 0.06 0 587
1(us.Tee-Br);23(us.Tee-Run);1(us.
1 Brline 10 120 58.158 960.28 0.0365 0.1 511
90);
632 PIPE 2.5 0.1016 65.69 4.55 2.4 0.03 588
7.532
1 Brline 40 120 2791.99 0.0045 0.03 510
1(us.Tee-Run); 2.9
528 PIPE 6 0.1016 2.5 0.01 0 511
1 Brline 40 120 3754.75 0.0079 0.06 509
1(us.Tee-Run); 3.7
527 PIPE 6 0.1016 3.36 0.03 0 510
1 Brline 40 120 4723.75 0.012 0.09 042
1(us.Tee-Run); 3.5
526 PIPE 6 0.1016 4.22 0.04 0 509
1 Brline 40 120 5(us.90); 21.292 5614.05 0.0166 0.13 051
040 PIPE 6 0.1016 21.336 42.628 5.02 0.71 0.53 042
1 Brline 10 120 1(coupling); 1.09 5614.05 0.0132 0.1 052-O
041 PIPE 6 0.1016 0.383 1.473 4.57 0.02 0.11 051
1 VALVE AV-1 Check 0 5614.05 0.401 0 052-I
0.305
1239 VALVE 6 0 0 0.12 0.03 052-O
1 Cmain 10 120 1(coupling); 0.038 5614.05 0.0132 0.1 055-O
042 PIPE 6 0.1016 0.383 0.421 4.57 0.01 0.00 052-I
1 VALVE Gate A2360 0 5614.05 0.0193 0 055-I
0.267
1238 VALVE 6 0 0 0.01 0.03 055-O
1 Cmain 10 120 1(us.Tee-Br); 0.3 5614.05 0.0132 0.1 057
043 PIPE 6 0.1016 11.497 11.797 4.57 0.16 0.03 055-I
1(us.Tee-Br);6(us.90);2(us.Tee-Ru
1 Cmain 40 120 34.275 5614.05 0.0014 0.02 053
n);
053 PIPE 10 0.1016 89.748 1.8 0.12 0.18 057
55.473
1 Cmain 40 120 1(us.Tee-Run);2(us.45);2(us.90); 578.896 3015.31 0.0004 0.00 056
089 PIPE 10 0.1016 20.117 599.013 0.96 0.26 0 053
1 Cmain 40 120 2(us.90); 90.069 7514.05 0.0023 0.03 059
059 PIPE 10 0.1016 13.411 103.48 2.4 0.24 0.29 056
1 Cmain 40 120 1(us.90); 23.208 7514.05 0.0023 0.03 W1
061 PIPE 10 0.1016 6.706 29.914 2.4 0.07 0 059
2 Sprig 40 120 1(us.Tee-Br); 0.3 198.74 0.1752 0.18 583
1150 PIPE 1 0.1016 1.524 1.824 5.94 0.32 0.03 P11
2 Brline 10 120 241.85 0.0028 0.01 582
1(us.Tee-Run); 2.5
602 PIPE 2.5 0.1016 1.15 0.01 0 583
2 Brline 10 120 1(us.Tee-Br);1(us.90); 1.235 440.97 0.0086 0.02 547
600 PIPE 2.5 0.1016 7.532 8.767 2.09 0.08 0.03 582
2 Brline 40 120 426.88 0.0001 0 546
1(us.Tee-Run); 3.7
564 PIPE 6 0.1016 0.38 0 0 547
2 Brline 40 120 1(us.Tee-Br); 3.5 872.13 0.0005 0.00 545
563 PIPE 6 0.1016 9.144 12.644 0.78 0.01 0 546
2 Brline 10 120 30(us.Tee-Run);1(us.Tee-Br); 73.793 872.13 0.0306 0.09 513
532 PIPE 2.5 0.1016 5.021 78.814 4.13 2.41 0 545
2 Brline 40 120 872.13 0.0005 0.00 512
1(us.Tee-Run); 3.501
530 PIPE 6 0.1016 0.78 0.00 0 513
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 12
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis
Pipe Data
Start Disch. Start Tot.Pres.
End Disch. End Tot.Pres.
l/min bar
l/min bar
1.86
198.72 1.51
1.87
1.86
1.88
1.87
1.91
1.88
1.97
1.91
4.4
1.97
4.41
4.4
4.44
4.41
4.49
4.44
5.72
4.49
5.85
5.72
6
5.85
6.01
6
6.04
6.01
6.23
6.04
6.52
6.23
6.78
6.52
7.32
6.78
7.39
-7514.05
7.32
1.86
198.74 1.52
1.87
1.86
1.98
1.87
1.98
1.98
1.98
1.98
4.39
1.98
4.39
4.39
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 13
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis
Pipe Data
Path # Type Schedule HWC Fittings Length Flow Fr.Resist. Vel.Pres. Start
Pipe Ref. Hgroup Size Rough. Eq.Len. Total Len. Velocity Loss Frict. Loss Elev. End
m l/min bar/m bar
mm m m m/s bar bar
2 Brline 40 120 1831.71 0.0021 0.01 511
1(us.Tee-Run); 3.7
529 PIPE 6 0.1016 1.64 0.01 0 512
3 Sprig 40 120 1(us.Tee-Br); 0.3 198.76 0.1753 0.18 552
1121 PIPE 1 0.1016 1.524 1.824 5.94 0.32 0.03 P10
3 Brline 10 120 157.83 0.0013 0.00 553
1(us.Tee-Run); 2.5
571 PIPE 2.5 0.1016 0.75 0.00 0 552
3 Brline 10 120 356.77 0.0058 0.01 554
1(us.Tee-Run); 2.5
572 PIPE 2.5 0.1016 1.69 0.01 0 553
3 Brline 10 120 556.51 0.0133 0.03 555
1(us.Tee-Run); 2.5
573 PIPE 2.5 0.1016 2.64 0.03 0 554
3 Brline 10 120 758.05 0.0236 0.06 556
1(us.Tee-Run); 2.5
574 PIPE 2.5 0.1016 3.59 0.06 0 555
1(us.Tee-Br);23(us.Tee-Run);1(us.
3 Brline 10 120 58.158 962.76 0.0367 0.1 510
90);
599 PIPE 2.5 0.1016 65.69 4.56 2.41 0.03 556
7.532
4 Sprig 40 120 1(us.Tee-Br); 0.3 198.78 0.1753 0.18 551
1120 PIPE 1 0.1016 1.524 1.824 5.94 0.32 0.03 P12
4 Brline 10 120 239.71 0.0028 0.01 550
1(us.Tee-Run); 2.5
569 PIPE 2.5 0.1016 1.14 0.01 0 551
4 Brline 10 120 1(us.Tee-Br);1(us.90); 1.235 438.87 0.0086 0.02 548
567 PIPE 2.5 0.1016 7.532 8.767 2.08 0.08 0.03 550
4 Brline 40 120 452.97 0.0002 0 008
1(us.Tee-Run); 3.7
566 PIPE 6 0.1016 0.41 0 0 548
4 Brline 40 120 1(us.Tee-Br); 3.5 890.3 0.0005 0.00 009
003 PIPE 6 0.1016 9.144 12.644 0.8 0.01 0 008
4 Brline 10 120 30(us.Tee-Run);1(us.Tee-Br); 73.793 890.3 0.0317 0.09 042
005 PIPE 2.5 0.1016 5.021 78.814 4.22 2.5 0 009
5 Sprig 40 120 1(us.Tee-Br); 0.3 198.89 0.1755 0.18 585
1152 PIPE 1 0.1016 1.524 1.824 5.95 0.32 0.03 P7
6 Sprig 40 120 1(us.Tee-Br); 0.3 198.94 0.1755 0.18 553
1122 PIPE 1 0.1016 1.524 1.824 5.95 0.32 0.03 P8
7 Sprig 40 120 1(us.Tee-Br); 0.3 199.12 0.1758 0.18 582
1149 PIPE 1 0.1016 1.524 1.824 5.95 0.32 0.03 P13
8 Sprig 40 120 1(us.Tee-Br); 0.3 199.16 0.1759 0.18 550
1119 PIPE 1 0.1016 1.524 1.824 5.95 0.32 0.03 P14
9 Sprig 40 120 1(us.Tee-Br); 0.3 199.24 0.176 0.18 616
1181 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 P21
9 Brline 10 120 152.91 0.0012 0.00 617
1(us.Tee-Run); 2.5
637 PIPE 2.5 0.1016 0.72 0.00 0 616
9 Brline 10 120 352.32 0.0057 0.01 618
1(us.Tee-Run); 2.5
638 PIPE 2.5 0.1016 1.67 0.01 0 617
9 Brline 10 120 552.51 0.0131 0.03 619
1(us.Tee-Run); 2.5
639 PIPE 2.5 0.1016 2.62 0.03 0 618
9 Brline 10 120 754.48 0.0234 0.06 620
1(us.Tee-Run); 2.5
640 PIPE 2.5 0.1016 3.57 0.06 0 619
1(us.Tee-Br);23(us.Tee-Run);1(us.
9 Brline 10 120 58.058 959.58 0.0365 0.1 512
90);
665 PIPE 2.5 0.1016 65.59 4.55 2.39 0.02 620
7.532
10 Sprig 40 120 1(us.Tee-Br); 0.3 199.26 0.1761 0.18 615
1180 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 P16
10 Brline 10 120 245.6 0.0029 0.01 614
1(us.Tee-Run); 2.5
635 PIPE 2.5 0.1016 1.16 0.01 0 615
10 Brline 10 120 1(us.Tee-Br);1(us.90); 1.135 445.26 0.0088 0.02 546
633 PIPE 2.5 0.1016 7.532 8.667 2.11 0.08 0.02 614
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 14
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis
Pipe Data
Start Disch. Start Tot.Pres.
End Disch. End Tot.Pres.
l/min bar
l/min bar
4.4
4.39
1.86
198.76 1.52
1.87
1.86
1.88
1.87
1.92
1.88
1.97
1.92
4.41
1.97
1.86
198.78 1.52
1.87
1.86
1.98
1.87
1.98
1.98
1.98
1.98
4.49
1.98
1.87
198.89 1.52
1.87
198.94 1.52
1.87
199.12 1.52
1.87
199.16 1.52
1.87
199.24 1.52
1.88
1.87
1.89
1.88
1.92
1.89
1.98
1.92
4.39
1.98
1.87
199.26 1.52
1.88
1.87
1.98
1.88
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 15
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis
Pipe Data
Path # Type Schedule HWC Fittings Length Flow Fr.Resist. Vel.Pres. Start
Pipe Ref. Hgroup Size Rough. Eq.Len. Total Len. Velocity Loss Frict. Loss Elev. End
m l/min bar/m bar
mm m m m/s bar bar
11 Sprig 40 120 1(us.Tee-Br); 0.3 199.41 0.1763 0.18 617
1182 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 P17
12 Sprig 40 120 1(us.Tee-Br); 0.3 199.41 0.1763 0.18 674
1236 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 P26
12 Brline 10 120 161.31 0.0013 0.00 673
1(us.Tee-Run); 2.5
695 PIPE 2.5 0.1016 0.76 0.00 0 674
12 Brline 10 120 360.91 0.006 0.01 672
1(us.Tee-Run); 2.5
694 PIPE 2.5 0.1016 1.71 0.01 0 673
12 Brline 10 120 561.32 0.0135 0.04 671
1(us.Tee-Run); 2.5
693 PIPE 2.5 0.1016 2.66 0.03 0 672
12 Brline 10 120 763.56 0.0239 0.07 670
1(us.Tee-Run); 2.5
692 PIPE 2.5 0.1016 3.62 0.06 0 671
1(us.Tee-Br);23(us.Tee-Run);1(us.
12 Brline 10 120 58.058 969 0.0371 0.11 509
90);
667 PIPE 2.5 0.1016 65.59 4.59 2.44 0.02 670
7.532
13 Sprig 40 120 1(us.Tee-Br); 0.3 199.43 0.1763 0.18 675
1237 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 P27
13 Brline 10 120 237.53 0.0027 0.01 006
1(us.Tee-Run); 2.5
697 PIPE 2.5 0.1016 1.13 0.01 0 675
13 Brline 10 120 1(us.Tee-Br);1(us.90); 1.135 437.33 0.0085 0.02 008
002 PIPE 2.5 0.1016 7.532 8.667 2.07 0.07 0.02 006
14 Sprig 40 120 1(us.Tee-Br); 0.3 199.6 0.1766 0.18 673
1235 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 P25
15 Sprig 40 120 1(us.Tee-Br); 0.3 199.66 0.1767 0.18 614
1179 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 P15
16 Sprig 40 120 1(us.Tee-Br); 0.3 199.68 0.1768 0.18 586
1153 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 P6
17 Sprig 40 120 1(us.Tee-Br); 0.3 199.74 0.1769 0.18 554
1123 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 P5
18 Sprig 40 120 1(us.Tee-Br); 0.3 199.8 0.177 0.18 006
698 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 P28
19 Sprig 40 120 1(us.Tee-Br); 0.3 200.19 0.1776 0.18 618
1183 PIPE 1 0.1016 1.524 1.824 5.98 0.32 0.03 P18
20 Sprig 40 120 1(us.Tee-Br); 0.3 200.41 0.178 0.18 672
1234 PIPE 1 0.1016 1.524 1.824 5.99 0.32 0.03 P24
21 Sprig 40 120 1(us.Tee-Br); 0.3 201.47 0.1797 0.18 587
1154 PIPE 1 0.1016 1.524 1.824 6.02 0.33 0.03 P4
22 Sprig 40 120 1(us.Tee-Br); 0.3 201.55 0.1798 0.18 555
1124 PIPE 1 0.1016 1.524 1.824 6.02 0.33 0.03 P3
23 Sprig 40 120 1(us.Tee-Br); 0.3 201.97 0.1805 0.18 619
1184 PIPE 1 0.1016 1.524 1.824 6.04 0.33 0.03 P19
24 Sprig 40 120 1(us.Tee-Br); 0.3 202.24 0.181 0.18 671
1233 PIPE 1 0.1016 1.524 1.824 6.05 0.33 0.03 P23
25 Sprig 40 120 1(us.Tee-Br); 0.3 204.62 0.1849 0.19 588
1155 PIPE 1 0.1016 1.524 1.824 6.12 0.34 0.03 P2
26 Sprig 40 120 1(us.Tee-Br); 0.3 204.71 0.1851 0.19 556
1125 PIPE 1 0.1016 1.524 1.824 6.12 0.34 0.03 P1
27 Sprig 40 120 1(us.Tee-Br); 0.3 205.1 0.1857 0.19 620
1185 PIPE 1 0.1016 1.524 1.824 6.13 0.34 0.03 P20
28 Sprig 40 120 1(us.Tee-Br); 0.3 205.44 0.1863 0.19 670
1232 PIPE 1 0.1016 1.524 1.824 6.14 0.34 0.03 P22
29 Cmain 10 120 1(us.Tee-Br); 2.348 1900 0.0458 0.17 054
095 PIPE 3 0.1016 6.145 8.492 5.88 0.39 0 H1
29 Cmain 40 120 1(us.Tee-Br);1(us.90); 241.857 4498.74 0.0009 0.01 056
056 PIPE 10 0.1016 21.946 263.803 1.44 0.24 0 054
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 16
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis
Pipe Data
Start Disch. Start Tot.Pres.
End Disch. End Tot.Pres.
l/min bar
l/min bar
1.88
199.41 1.53
1.88
199.41 1.53
1.88
1.88
1.89
1.88
1.93
1.89
1.99
1.93
4.44
1.99
1.88
199.43 1.53
1.88
1.88
1.98
1.88
1.88
199.6 1.53
1.88
199.66 1.53
1.88
199.68 1.53
1.88
199.74 1.53
1.88
199.8 1.53
1.89
200.19 1.54
1.89
200.41 1.54
1.91
201.47 1.56
1.92
201.55 1.56
1.92
201.97 1.56
1.93
202.24 1.57
1.97
204.62 1.61
1.97
204.71 1.61
1.98
205.1 1.61
1.99
205.44 1.62
6.54
1900 6.15
6.78
6.54
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 17
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis
Pipe Data
Path # Type Schedule HWC Fittings Length Flow Fr.Resist. Vel.Pres. Start
Pipe Ref. Hgroup Size Rough. Eq.Len. Total Len. Velocity Loss Frict. Loss Elev. End
m l/min bar/m bar
mm m m m/s bar bar
30 Brline 10 120 43.11 0.0001 0 583
1(us.Tee-Run); 2.5
603 PIPE 2.5 0.1016 0.2 0 0 584
31 Cmain 40 120 2598.74 0.0003 0.00 054
1(us.Tee-Run); 60
054 PIPE 10 0.1016 0.83 0.02 0 053
32 Cmain 40 120 1(us.Tee-Br); 232.617 1.9 0 0 074
077 PIPE 10 0.1016 15.24 247.857 0 0 0 059
32 Cmain 40 120 1(us.Tee-Br); 105.403 4.33 0 0 073
076 PIPE 10 0.1016 15.24 120.643 0.00 0 0 074
32 Cmain 40 120 5.11 0 0 072
1(us.Tee-Run); 226.39
074 PIPE 10 0.1016 0.00 0 0 073
32 Cmain 40 120 8.11 0 0 071
1(us.Tee-Run); 8.796
073 PIPE 10 0.1016 0.00 0 0 072
1(us.Tee-Run);4(us.90);1(us.45);1
32 Cmain 40 120 541.579 5.58 0 0 065
(us.Tee-Br);
067 PIPE 10 0.1016 586.994 0.00 0 0 071
45.415
32 Cmain 40 120 1(us.Tee-Br);4(us.90); 1136.821 2.9 0 0 078
084 PIPE 10 0.1016 42.062 1178.883 0 0 0 065
32 Cmain 40 120 1(us.Tee-Run);2(us.90); 472.836 5.42 0 0 075
080 PIPE 10 0.1016 13.411 486.247 0.00 0 0 078
32 Cmain 40 120 2(us.Tee-Br); 101.371 2.99 0 0 072
079 PIPE 10 0.1016 30.48 131.851 0 0 0 075
33 Brline 40 120 14.09 0 0 548
1(us.Tee-Run); 2.9
565 PIPE 6 0.1016 0.01 0 0 547
34 Brline 10 120 40.93 0.0001 0 551
1(us.Tee-Run); 2.5
570 PIPE 2.5 0.1016 0.19 0 0 552
35 Brline 10 120 46.33 0.0001 0 615
1(us.Tee-Run); 2.5
636 PIPE 2.5 0.1016 0.22 0 0 616
36 Brline 10 120 38.1 0.0001 0 675
1(us.Tee-Run); 2.5
696 PIPE 2.5 0.1016 0.18 0 0 674
37 Cmain 40 120 2.52 0 0 078
1(us.Tee-Run); 341.032
083 PIPE 10 0.1016 0 0 0 071
1(us.Tee-Run);2(elbow.22.5);1(us.
38 Cmain 40 120 225.559 2.68 0 0 061
Tee-Br);1(us.90);
063 PIPE 10 0.1016 250.858 0 0 0 065
25.298
38 Cmain 40 120 1(us.Tee-Br); 106.306 1.9 0 0 059
062 PIPE 10 0.1016 15.24 121.546 0 0 0 061
39 Cmain 40 120 1(us.Tee-Br); 227.981 2.43 0 0 074
078 PIPE 10 0.1016 15.24 243.221 0 0 0 075
40 Cmain 40 120 0.79 0 0 073
1(us.Tee-Run); 237.006
075 PIPE 10 0.1016 0 0 0 061
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 18
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis
Pipe Data
Start Disch. Start Tot.Pres.
End Disch. End Tot.Pres.
l/min bar
l/min bar
1.86
1.86
6.54
6.52
7.32
7.32
7.32
7.32
7.32
7.32
7.32
7.32
7.32
7.32
7.32
7.32
7.32
7.32
7.32
7.32
1.98
1.98
1.86
1.86
1.87
1.87
1.88
1.88
7.32
7.32
7.32
7.32
7.32
7.32
7.32
7.32
7.32
7.32
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 19
Job : FAS Building7 Hydraulic Calculations
PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)
Path No: 1
P9 11.5 161.4 198.72 1 1x(us.Tee-Br)=1.524 0.3 120 1.51
584 11.2 198.72 26.6 1.524 0.1752 0.03
1.824 0.32
584 11.2 -43.11 2.5 2.5 120 1.86
585 11.2 155.61 66.9 0 0.0013 0
2.5 0.00
585 11.2 198.89 2.5 2.5 120 1.87
586 11.2 354.5 66.9 0 0.0058 0
2.5 0.01
586 11.2 199.68 2.5 2.5 120 1.88
587 11.2 554.18 66.9 0 0.0132 0
2.5 0.03
587 11.2 201.47 2.5 2.5 120 1.91
588 11.2 755.65 66.9 0 0.0234 0
2.5 0.06
588 11.2 204.62 2.5 1x(us.Tee-Br)=5.021 58.158 120 1.97
511 10.9 960.28 66.9 1x(us.90)=2.511 7.532 0.0365 0.03
65.69 2.4
511 10.9 1831.71 6 2.9 120 4.4
510 10.9 2791.99 154.1 0 0.0045 0
2.9 0.01
510 10.9 962.76 6 3.7 120 4.41
509 10.9 3754.75 154.1 0 0.0079 0
3.7 0.03
509 10.9 969 6 3.5 120 4.44
042 10.9 4723.75 154.1 0 0.012 0
3.5 0.04
042 10.9 890.3 6 5x(us.90)=21.336 21.292 120 4.49
051 5.5 5614.05 154.1 21.336 0.0166 0.53
42.628 0.71
051 5.5 0 6 1x(coupling)=0.383 1.09 120 5.72
052-O 4.41 5614.05 161.5 0.383 0.0132 0.11
1.473 0.02
052-O 4.41 0 6 0.305 0 5.85 AV-1 Check
052-I 4.105 5614.05 0 0 0.401 0.03 ***
0.305 0.12
052-I 4.105 0 6 1x(coupling)=0.383 0.038 120 6
055-O 4.067 5614.05 161.5 0.383 0.0132 0.00
0.421 0.01
055-O 4.067 0 6 0.267 0 6.01 Gate A2360
055-I 3.8 5614.05 0 0 0.0193 0.03 ***
0.267 0.01
055-I 3.8 0 6 1x(us.Tee-Br)=11.497 0.3 120 6.04
057 3.5 5614.05 161.5 11.497 0.0132 0.03
11.797 0.16
057 3.5 0 10 1x(us.Tee-Br)=15.24 34.275 120 6.23
053 1.7 5614.05 257.6 6x(us.90)=40.233 55.473 0.0014 0.18
89.748 0.12
053 1.7 -2598.74 10 2x(us.45)=6.706 578.89 120 6.52
056 1.7 3015.31 257.6 2x(us.90)=13.411 6 0.0004 0
20.117 0.26
599.01
3
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 20
Job : FAS Building7 Hydraulic Calculations
PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)
Path No: 1
056 1.7 4498.74 10 2x(us.90)=13.411 90.069 120 6.78
059 -1.3 7514.05 257.6 13.411 0.0023 0.29
103.48 0.24
059 -1.3 0 10 1x(us.90)=6.706 23.208 120 7.32
W1 -1.3 7514.05 257.6 6.706 0.0023 0
29.914 0.07
W1 7.39
Path No: 2
P11 11.5 161.4 198.74 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
583 11.2 198.74 26.6 1.524 0.1752 0.03
1.824 0.32
583 11.2 43.11 2.5 2.5 120 1.86
582 11.2 241.85 66.9 0 0.0028 0
2.5 0.01
582 11.2 199.12 2.5 1x(us.Tee-Br)=5.021 1.235 120 1.87
547 10.9 440.97 66.9 1x(us.90)=2.511 7.532 0.0086 0.03
8.767 0.08
547 10.9 -14.09 6 3.7 120 1.98
546 10.9 426.88 154.1 0 0.0001 0
3.7 0
546 10.9 445.26 6 1x(us.Tee-Br)=9.144 3.5 120 1.98
545 10.9 872.13 154.1 9.144 0.0005 0
12.644 0.01
545 10.9 0 2.5 1x(us.Tee-Br)=5.021 73.793 120 1.98
513 10.9 872.13 66.9 5.021 0.0306 0
78.814 2.41
513 10.9 0 6 3.501 120 4.39
512 10.9 872.13 154.1 0 0.0005 0
3.501 0.00
512 10.9 959.58 6 3.7 120 4.39
511 10.9 1831.71 154.1 0 0.0021 0
3.7 0.01
511 4.4
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 21
Job : FAS Building7 Hydraulic Calculations
PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)
Path No: 3
P10 11.5 161.4 198.76 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
552 11.2 198.76 26.6 1.524 0.1753 0.03
1.824 0.32
552 11.2 -40.93 2.5 2.5 120 1.86
553 11.2 157.83 66.9 0 0.0013 0
2.5 0.00
553 11.2 198.94 2.5 2.5 120 1.87
554 11.2 356.77 66.9 0 0.0058 0
2.5 0.01
554 11.2 199.74 2.5 2.5 120 1.88
555 11.2 556.51 66.9 0 0.0133 0
2.5 0.03
555 11.2 201.55 2.5 2.5 120 1.92
556 11.2 758.05 66.9 0 0.0236 0
2.5 0.06
556 11.2 204.71 2.5 1x(us.Tee-Br)=5.021 58.158 120 1.97
510 10.9 962.76 66.9 1x(us.90)=2.511 7.532 0.0367 0.03
65.69 2.41
510 4.41
Path No: 4
P12 11.5 161.4 198.78 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
551 11.2 198.78 26.6 1.524 0.1753 0.03
1.824 0.32
551 11.2 40.93 2.5 2.5 120 1.86
550 11.2 239.71 66.9 0 0.0028 0
2.5 0.01
550 11.2 199.16 2.5 1x(us.Tee-Br)=5.021 1.235 120 1.87
548 10.9 438.87 66.9 1x(us.90)=2.511 7.532 0.0086 0.03
8.767 0.08
548 10.9 14.09 6 3.7 120 1.98
008 10.9 452.97 154.1 0 0.0002 0
3.7 0
008 10.9 437.33 6 1x(us.Tee-Br)=9.144 3.5 120 1.98
009 10.9 890.3 154.1 9.144 0.0005 0
12.644 0.01
009 10.9 0 2.5 1x(us.Tee-Br)=5.021 73.793 120 1.98
042 10.9 890.3 66.9 5.021 0.0317 0
78.814 2.5
042 4.49
Path No: 5
P7 11.5 161.4 198.89 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
585 11.2 198.89 26.6 1.524 0.1755 0.03
1.824 0.32
585 1.87
Path No: 6
P8 11.5 161.4 198.94 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
553 11.2 198.94 26.6 1.524 0.1755 0.03
1.824 0.32
553 1.87
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 22
Job : FAS Building7 Hydraulic Calculations
PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)
Path No: 7
P13 11.5 161.4 199.12 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
582 11.2 199.12 26.6 1.524 0.1758 0.03
1.824 0.32
582 1.87
Path No: 8
P14 11.5 161.4 199.16 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
550 11.2 199.16 26.6 1.524 0.1759 0.03
1.824 0.32
550 1.87
Path No: 9
P21 11.4 161.4 199.24 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
616 11.1 199.24 26.6 1.524 0.176 0.03
1.824 0.32
616 11.1 -46.33 2.5 2.5 120 1.87
617 11.1 152.91 66.9 0 0.0012 0
2.5 0.00
617 11.1 199.41 2.5 2.5 120 1.88
618 11.1 352.32 66.9 0 0.0057 0
2.5 0.01
618 11.1 200.19 2.5 2.5 120 1.89
619 11.1 552.51 66.9 0 0.0131 0
2.5 0.03
619 11.1 201.97 2.5 2.5 120 1.92
620 11.1 754.48 66.9 0 0.0234 0
2.5 0.06
620 11.1 205.1 2.5 1x(us.Tee-Br)=5.021 58.058 120 1.98
512 10.9 959.58 66.9 1x(us.90)=2.511 7.532 0.0365 0.02
65.59 2.39
512 4.39
Path No: 10
P16 11.4 161.4 199.26 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
615 11.1 199.26 26.6 1.524 0.1761 0.03
1.824 0.32
615 11.1 46.33 2.5 2.5 120 1.87
614 11.1 245.6 66.9 0 0.0029 0
2.5 0.01
614 11.1 199.66 2.5 1x(us.Tee-Br)=5.021 1.135 120 1.88
546 10.9 445.26 66.9 1x(us.90)=2.511 7.532 0.0088 0.02
8.667 0.08
546 1.98
Path No: 11
P17 11.4 161.4 199.41 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
617 11.1 199.41 26.6 1.524 0.1763 0.03
1.824 0.32
617 1.88
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 23
Job : FAS Building7 Hydraulic Calculations
PIPE INFORMATION
Path No: 12
P26 11.4 161.4 199.41 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
674 11.1 199.41 26.6 1.524 0.1763 0.03
1.824 0.32
674 11.1 -38.1 2.5 2.5 120 1.88
673 11.1 161.31 66.9 0 0.0013 0
2.5 0.00
673 11.1 199.6 2.5 2.5 120 1.88
672 11.1 360.91 66.9 0 0.006 0
2.5 0.01
672 11.1 200.41 2.5 2.5 120 1.89
671 11.1 561.32 66.9 0 0.0135 0
2.5 0.03
671 11.1 202.24 2.5 2.5 120 1.93
670 11.1 763.56 66.9 0 0.0239 0
2.5 0.06
670 11.1 205.44 2.5 1x(us.Tee-Br)=5.021 58.058 120 1.99
509 10.9 969 66.9 1x(us.90)=2.511 7.532 0.0371 0.02
65.59 2.44
509 4.44
Path No: 13
P27 11.4 161.4 199.43 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
675 11.1 199.43 26.6 1.524 0.1763 0.03
1.824 0.32
675 11.1 38.1 2.5 2.5 120 1.88
006 11.1 237.53 66.9 0 0.0027 0
2.5 0.01
006 11.1 199.8 2.5 1x(us.Tee-Br)=5.021 1.135 120 1.88
008 10.9 437.33 66.9 1x(us.90)=2.511 7.532 0.0085 0.02
8.667 0.07
008 1.98
Path No: 14
P25 11.4 161.4 199.6 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
673 11.1 199.6 26.6 1.524 0.1766 0.03
1.824 0.32
673 1.88
Path No: 15
P15 11.4 161.4 199.66 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
614 11.1 199.66 26.6 1.524 0.1767 0.03
1.824 0.32
614 1.88
Path No: 16
P6 11.5 161.4 199.68 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
586 11.2 199.68 26.6 1.524 0.1768 0.03
1.824 0.32
586 1.88
Path No: 17
P5 11.5 161.4 199.74 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
554 11.2 199.74 26.6 1.524 0.1769 0.03
1.824 0.32
554 1.88
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 24
Job : FAS Building7 Hydraulic Calculations
PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)
Path No: 18
P28 11.4 161.4 199.8 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
006 11.1 199.8 26.6 1.524 0.177 0.03
1.824 0.32
006 1.88
Path No: 19
P18 11.4 161.4 200.19 1 1x(us.Tee-Br)=1.524 0.3 120 1.54
618 11.1 200.19 26.6 1.524 0.1776 0.03
1.824 0.32
618 1.89
Path No: 20
P24 11.4 161.4 200.41 1 1x(us.Tee-Br)=1.524 0.3 120 1.54
672 11.1 200.41 26.6 1.524 0.178 0.03
1.824 0.32
672 1.89
Path No: 21
P4 11.5 161.4 201.47 1 1x(us.Tee-Br)=1.524 0.3 120 1.56
587 11.2 201.47 26.6 1.524 0.1797 0.03
1.824 0.33
587 1.91
Path No: 22
P3 11.5 161.4 201.55 1 1x(us.Tee-Br)=1.524 0.3 120 1.56
555 11.2 201.55 26.6 1.524 0.1798 0.03
1.824 0.33
555 1.92
Path No: 23
P19 11.4 161.4 201.97 1 1x(us.Tee-Br)=1.524 0.3 120 1.56
619 11.1 201.97 26.6 1.524 0.1805 0.03
1.824 0.33
619 1.92
Path No: 24
P23 11.4 161.4 202.24 1 1x(us.Tee-Br)=1.524 0.3 120 1.57
671 11.1 202.24 26.6 1.524 0.181 0.03
1.824 0.33
671 1.93
Path No: 25
P2 11.5 161.4 204.62 1 1x(us.Tee-Br)=1.524 0.3 120 1.61
588 11.2 204.62 26.6 1.524 0.1849 0.03
1.824 0.34
588 1.97
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 25
Job : FAS Building7 Hydraulic Calculations
PIPE INFORMATION
Path No: 26
P1 11.5 161.4 204.71 1 1x(us.Tee-Br)=1.524 0.3 120 1.61
556 11.2 204.71 26.6 1.524 0.1851 0.03
1.824 0.34
556 1.97
Path No: 27
P20 11.4 161.4 205.1 1 1x(us.Tee-Br)=1.524 0.3 120 1.61
620 11.1 205.1 26.6 1.524 0.1857 0.03
1.824 0.34
620 1.98
Path No: 28
P22 11.4 161.4 205.44 1 1x(us.Tee-Br)=1.524 0.3 120 1.62
670 11.1 205.44 26.6 1.524 0.1863 0.03
1.824 0.34
670 1.99
Path No: 29
H1 1.7 1900 3 1x(us.Tee-Br)=6.145 2.348 120 6.15
054 1.7 1900 82.8 6.145 0.0458 0
8.492 0.39
054 1.7 2598.74 10 1x(us.Tee-Br)=15.24 241.85 120 6.54
056 1.7 4498.74 257.6 1x(us.90)=6.706 7 0.0009 0
21.946 0.24
263.80
3
056 6.78
Path No: 30
584 11.2 0 2.5 2.5 120 1.86
583 11.2 43.11 66.9 0 0.0001 0
2.5 0
583 1.86
Path No: 31
053 1.7 0 10 60 120 6.52
054 1.7 2598.74 257.6 0 0.0003 0
60 0.02
054 6.54
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 26
Job : FAS Building7 Hydraulic Calculations
PIPE INFORMATION
Path No: 32
059 -1.3 0 10 1x(us.Tee-Br)=15.24 232.61 120 7.32
074 -1.3 1.9 257.6 7 0 0
15.24 0
247.85
7
074 -1.3 2.43 10 1x(us.Tee-Br)=15.24 105.40 120 7.32
073 -1.3 4.33 257.6 3 0 0
15.24 0
120.64
3
073 -1.3 0.79 10 226.39 120 7.32
072 -1.3 5.11 257.6 0 0 0
226.39 0
072 -1.3 2.99 10 8.796 120 7.32
071 -1.3 8.11 257.6 0 0 0
8.796 0
071 -1.3 -2.52 10 4x(us.90)=26.822 541.57 120 7.32
065 -1.3 5.58 257.6 1x(us.45)=3.353 9 0 0
1x(us.Tee-Br)=15.24 45.415 0
586.99
4
065 -1.3 -2.68 10 1x(us.Tee-Br)=15.24 1136.8 120 7.32
078 -1.3 2.9 257.6 4x(us.90)=26.822 21 0 0
42.062 0
1178.8
83
078 -1.3 2.52 10 2x(us.90)=13.411 472.83 120 7.32
075 -1.3 5.42 257.6 6 0 0
13.411 0
486.24
7
075 -1.3 -2.43 10 2x(us.Tee-Br)=30.48 101.37 120 7.32
072 -1.3 2.99 257.6 1 0 0
30.48 0
131.85
1
072 7.32
Path No: 33
547 10.9 0 6 2.9 120 1.98
548 10.9 14.09 154.1 0 0 0
2.9 0
548 1.98
Path No: 34
552 11.2 0 2.5 2.5 120 1.86
551 11.2 40.93 66.9 0 0.0001 0
2.5 0
551 1.86
Path No: 35
616 11.1 0 2.5 2.5 120 1.87
615 11.1 46.33 66.9 0 0.0001 0
2.5 0
615 1.87
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 27
Job : FAS Building7 Hydraulic Calculations
PIPE INFORMATION
Path No: 36
674 11.1 0 2.5 2.5 120 1.88
675 11.1 38.1 66.9 0 0.0001 0
2.5 0
675 1.88
Path No: 37
071 -1.3 0 10 341.03 120 7.32
078 -1.3 2.52 257.6 2 0 0
0 0
341.03
2
078 7.32
Path No: 38
065 -1.3 0 10 2x(elbow.22.5)=3.353 225.55 120 7.32
061 -1.3 2.68 257.6 1x(us.Tee-Br)=15.24 9 0 0
1x(us.90)=6.706 25.298 0
250.85
8
061 -1.3 -0.79 10 1x(us.Tee-Br)=15.24 106.30 120 7.32
059 -1.3 1.9 257.6 6 0 0
15.24 0
121.54
6
059 7.32
Path No: 39
075 -1.3 0 10 1x(us.Tee-Br)=15.24 227.98 120 7.32
074 -1.3 2.43 257.6 1 0 0
15.24 0
243.22
1
074 7.32
Path No: 40
061 -1.3 0 10 237.00 120 7.32
073 -1.3 0.79 257.6 6 0 0
0 0
237.00
6
073 7.32
* Pressures are balanced to a high degree of accuracy. Values may vary by 0.01 bar due to display rounding.
*** Device pressure loss (gain in the case of pumps) is calculated from the device’s curve. If the device curve is printed with
this report, it will appear below. The length of the device as shown in the table above comes from the CAD drawing. The friction
loss per unit of length is calculated based upon the length and the curve-based loss/gain value. Internal ID and C Factor values
are irrelevant as the device is not represented as an addition to any pipe, but is an individual item whose loss/gain is based
solely on the curve data.
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 28
Job : FAS Building7 Device Graphs
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 29
Job : FAS Building7 Device Graphs
File: Building7.sprinkCAD.dwg
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 30