Safe Work Method Statement For Erection of All Works:: Client Consultant
Safe Work Method Statement For Erection of All Works:: Client Consultant
LOCATION :
: SAFETY OFFICER
: SITE SUPERVISOR
: WORKERS
1. JOB PROCEDURE
2. SAFETY PROCEDURE
All workmen Involved in the operation Should be screened /inducted
Before start of the work proper PPEs given to the workers
Inspect work/walk area for potential slip and trip fall obstructions prior
to start of work and remove ,if not possible mark with visible tape/
signage
Before start of the work Tool box talk to be given
Permit (height &hot work) to be done before start of the work.
All persons should wear full body safety harness while working at
height (2 MTR to 13 MTR level).
Cleaning for the flammable Material before start welding work
Scaffolds and working platforms shall be erected, altered and
dismantled under the supervision of the competent person
All bracing shall be in position and lock properly
Scaffold must be inspected and tag to be used (GREEN-Safe for use,
RED-not in use)
Don’t move the scaffolding while persons working at height
Fire Extinguisher shall be in working Area
Engaged to fire watcher
Never allow the scaffold to run over the electrical cable
Do not used damaged and defective sockets
Switch on after plug in , switch off before plug out
Call the electrician if any work needs to the done in DB
Check the power supply is off before change in blade and drill bit
Cleaning of all debris and waste material after complete to the work.
Adequate Lighting provided for all areas