Subject: Work at Height: Unit: Maihar Cement Works
Subject: Work at Height: Unit: Maihar Cement Works
:
Revision No. : 00
STANDARD OPERATING
Page No. : 1 of 3
PROCEDURE
Review Date : 12.08.2019
Effective Date : 01.09.2019
Unit: Maihar Approved by: Issued by:
Cement Works Subject: Work at Height
(HOD-DEPT) (MR)
2. SCOPE: This procedure is applicable to all departments for all types of working
above height of 1.8 Mtrs
3.2 Hazards:
4. RESPONSIBILITY
Section Heads / Safety Officer / Site Engineer/ Site Supervisor is responsible for
ensuring the effectiveness of system for Working at height.
5. Work Instructions : -
5.1 Examples of working at height tasks where falls could occur include:
- Working on roofs;
- Cleaning windows;
- Air-conditioning maintenance;
- Erecting signs and displays;
- Ladder work;
- Working near holes, pits and shafts; and
- Working on fragile, slippery or sloping surfaces.
5.2 First of all, it is to be ensured that workers should be worn safety belt, safety helmet,
safety shoes & safety hand gloves when and where ever necessary.
5.4 Make solid and fixed support for climbing at height such as ladder, stool and
scaffoldings.
5.5 Do not move the ladder when the person is still at the top of ladder.
5.6 Always provide sufficient numbers of helpers to hold and shift ladder or stool.
5.7 Wear safety belt and tie it with fixed support at the level above working place.
Don’t…
Overload ladders – consider the equipment or materials workers are carrying
before working at height. Check the pictogram or label on the ladder for
information
Overreach on ladders or stepladders
Rest a ladder against weak upper surfaces, eg glazing or plastic gutters
Use ladders or stepladders for strenuous or heavy tasks, only use them for
light work of short duration (a maximum of 30 minutes at a time)
Let anyone who is not competent (who doesn’t have the skills, knowledge
and experience to do the job) work at height
IMS-HIRA--------