(PO Draft) MKS-RFP-20-0270
(PO Draft) MKS-RFP-20-0270
MITSUBISHI CORPORATION (Buyer) hereby confirms its purchase from Seller of the following Goods in accordance with the terms and conditions given herein
including all those on the sheet(s) attached hereto, which are expressly agreed to, understood and made a part of this Contract.
Jl. Yusuf Adiwinata No 29, Menteng Jakarta 10350, Indonesia INTERNAL REQUEST NO. ORDER / ITEM
6705163 SAM0
Tel. : 62-21-3193 1298 / Fax : - MKS-RFP-20-0270
AC Code 2831
Attention : Mr. Hendro Martono - President Director PROJECT: MUARA KARANG Combined Cycle Power Plant
UNIT PRICE TOTAL AMOUNT
NO GOODS / COMMODITY / SERVICES QUANTITY
(IDR) (IDR)
2 Supporting Material & Miscellaneous Material 1 lot IDR 200.000 IDR 200.000
IDR 4.290.000
TOTAL
(EXCLUDE VAT 10%)
DELIVERY TERMS DELIVERY DATE / WORK COMPLETION DATE
Delivered at Muara Karang Project Site by Seller's Truck at Seller's risk and
expense, exluding unloading.
DDP MUARA KARANG SITE
The Seller shall comply with all the detailed conditions specified in the Buyer's
General Shipping Instructions and the Buyer's Special Shipping Instructions as April 8th , 2020
per previous Contract of Purchase.
PAYMENT TERMS PACKING
The Buyer shall make 100% payment to the Seller by means of bank transfer
within forthy five (45) days after the Buyer’s receipt of the correct and original
Invoice, Faktur Pajak, Shipping Documents as per Buyer's shipping instructions Suitable for truck transportation.
(Packing List, Delivery Note and Material Delivery Certificate signed by Buyer's
Representative at Job Site).
INSPECTION INSURANCE
Other terms and conditions shall be in accordance with the General Terms and Conditions for Purchasing No. GC-ST-2400-23.7 R1(MC) as per previous Contract of
Purchase.
The Seller is requested to return to the Buyer one signed original of this Contract of Purchase to confirm its acceptance. Acceptance is limited to the entirety of the
terms and conditions herein.