0% found this document useful (0 votes)
207 views3 pages

653-Sacrificial Anode Installation For Tanks

This document is a standard inspection and test plan (ITP) for the installation of sacrificial anodes on tanks. It lists 6 key activities that will be inspected including: 1) proper installation of anodes and backfilling, 2) installation of below ground cathode protection cables, 3) splicing of below grade cables, 4) completion of the cathode protection cable network, 5) connections to the tank, and 6) final sign off after inspections. The ITP provides inspection requirements, reference documents, and spaces for initials and stamps of approval from subcontractor QC, contractor QC, Bechtel representatives, and client/TPI representatives.

Uploaded by

Folarin Ayodeji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
207 views3 pages

653-Sacrificial Anode Installation For Tanks

This document is a standard inspection and test plan (ITP) for the installation of sacrificial anodes on tanks. It lists 6 key activities that will be inspected including: 1) proper installation of anodes and backfilling, 2) installation of below ground cathode protection cables, 3) splicing of below grade cables, 4) completion of the cathode protection cable network, 5) connections to the tank, and 6) final sign off after inspections. The ITP provides inspection requirements, reference documents, and spaces for initials and stamps of approval from subcontractor QC, contractor QC, Bechtel representatives, and client/TPI representatives.

Uploaded by

Folarin Ayodeji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

EAMS

STANDARD INSPECTION AND TEST PLAN

ITP No: 653


SACRIFICIAL ANODE INSTALLATION FOR TANKS

0 30/04/98 Issued for Implementation CMA SW MK


REV DATE REVISION BY CHKD APPR

p:\\itp\\electric\\itp653.doc Standard Inspection and Test Plan ITP No. 653 Rev 0 Page 1 of 2
Standard Inspection and Test Plan
ITP No. 653

FORMS INDEX

LIST OF ATTACHED FORMS

No. Form No. Rev. Description


1. ITP-653 1 Sacrificial Anode Installation for Tanks
2.
3.

LIST OF REFERENCED FORMS

No. Form No. Doc. Ref. Description


1.
2.
3.

Note: The referenced forms are included in and controlled by the referenced document.
Therefore, the latest revision of these forms, at the time of initiation of the forms, will be
utilised.
p:\\itp\\electric\\itp653.doc Standard Inspection and Test Plan ITP No. 653 Rev 0 Page 2 of 2
STANDARD INSPECTION AND TEST PLAN ITP No. ITP-653

BECHTEL - EAMS Rev. No. 1

SACRIFICIAL ANODE INSTALLATION FOR TANKS Hand. Class. Specific


Page 1 of 1
UNIT/ AREA ISO NO.: BARCODE

Activity Inspection/Test Reference Document Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Spec./Dwg./QCP No.: Sub-Contr. QC Contractor QC. Bechtel Rep. Client/TPI Rep. Reference No.:
653-1.0 Anodes installed and backfilled as specified.  Distance from tank as specified. Manufacturers W W
 Installed at depth as specified. Instructions
 Backfilled as specified. Drawings
Spec Rqs.
653-2.0 The below ground CP cable for the tank  Correct location and depth. Manufacturers W W
installed as per requirement.  Correct size and type of cable. Instructions
Drawings
Spec. Rqs.
653-3.0 Splicing of below grade CP cable.  Correct type of splice used. Manufacturers S S
 Splice wrapped and coated as specified. Instructions
 Splice checked for tightness. Drawings
Spec. Rqs.
653-4.0 Tank CP cable network complete  All underground cells backfilled. Manufacturers W W
Instructions
Drawings
Spec. Rqs.
653-5.0 CP connections to tank.  Steel surfaces wire brushed and thoroughly Manufacturers W W
cleaned prior to installing ground lug. Instructions
 Correct type and size of cells. Drawings
 Check connections for tightness. Spec. Rqs.
653-6.0 Tank anode installation complete.  Verify all inspections/tests complete and H H W
conformant.
 Anode installation released.

Legend : S - Surveillance Inspection W - Witness Inspection Point H - Mandatory Hold Point For Inspection R - Record Review Note : * Generic Record not attached to ITP
Sub -contractor QC Date & Signature /Stamp No. Contractor QC Date & Signature /Stamp No. Bechtel Rep. Date & Signature /Stamp No. Client/TPI Rep. Date & Signature/ Stamp No. Computer. Ref. :

System File Reference:

p:\\itp\\electric\\itp653.doc