1L02 - Quality Plan
1L02 - Quality Plan
TABLE OF CONTENTS
1 INTRODUCTION ....................................................................................................................1
2 SCOPE....................................................................................................................................1
3 OBJECTIVE ............................................................................................................................1
4 REFERENCES .......................................................................................................................1
8 MDR ......................................................................................................................................12
Attachment ...............................................................................................................................
QUALITY PLAN
1. INTRODUCTION
Quality Assurance manual with Regard to material procurement, mateial receipt &
2. SCOPE
The works covered by the Project Quality Plan are limited solely to the scope
service
3. OBJECTIVE
ETI with the objective of ensuring high quality of works and meet client satisfactions,
therefore ETI Project Quality Plan is designed to give a high degree of effective & efficient
control over all its activities concering fabrication, instalation mantenance service.
Eti Quality Assurance Departement has been empowered to undertake the duty and
responsibility of establishing, implementing and monitoring the diverse quality control funct
aions at its workshop and site. This will ensure that equipment, Mateial and Associated
Sructures will be fabricated and installed in accordance with the client requirement,
4.REFERENCES
Proc. = PROCEDURE
RT = RADIOGRAPHY TEST
UT = ULTRASONIC TEST
PT = PENETRANT TEST
5.1 Organization
The QA/QC Departement will be report directly to the workshop manager /project
manager
5.2 responsibilities
1) QA/QC Coordinator
their duties;
To coordinate all QA/QC inspection and certification process of the job including
To liaise with client QA/QC Coordinator aand involveed Third Party in order to
2) QC Inspector
To carry out all QA/QC activities on for ensuring that quality activities and related
The activities are receiviing material, marking, cutting, fit up, welding, NDT,
Provide and compile all on -site QA/Qc dossier documents, traceability record,
6.1 Engineering
ETI will ensure that its engineers are familiar with the project specifications
ETI shall perform fabrication engeneerig work requird for the safe and
QUALITY PLAN
ETI project engineer shall be responsible for reviewing and ensuring that all
standard/code. ETI project engineer will be responsible for maintaining the drawings
/ report indeks up-to-date. Each drawing will be signed by responsible draffman and
engineering manager, before being issued to client for approval. Any problem or
change with detail design are required revision in approval layout plant or
specification requirements will be brought to the attetion of the client and shall e
Approved before any change / revision can be affected. Project Engineer of ETI and
client respresentative shall approve any revision of drawing. Revised portiona of the
blocks below each drawing and signed by draffman discipline / engineer. All void
drawing will be discarted or clearly marked as much. Quality Control shall follow up
6.2 Procurement
All main materials and equipment that subject to inspect when arriving on site
acceptance. Material and equipment will be visually examined for comliance with
the Purchase orders, invoice, material requisition and for any possible damage
during transportation. This will ensure that only intended materials and equipment
that meet with the quality requirement are released for use in fabrication and / or
sent to site. Any materilas and or equipment rejected will be clearly tagged and
ensure the they are properly market, documnted and controlled for its intended use
during fabrication. This system will involve the use of codet o paint-mark material
that have been released for fabrication use. Material receiving will be documntaed
materials. One copy of The certificate is to accompany the material at delivery. The
material inspector shall verify whether the required marking (i, e heat number, type.
Work order etc) on the material is legible and correct before the material is accepted
vendor.
All structure material that withdrawn from store / warwhouse will be marked
with its heat number prior to fabrication. When materials are being cut, the cutting
machine operator shall be transfer the heat number on to every off cut profie. The
Separate sect of procedures are defined in ETI are defined TIMAS Quality
Assurance Program for each distinct facet of ETI contruction works. They are
services delivered will be storage yard depending on size, weight, grade and type.
of the item tothe requirement of the applicable code and the contract specification.
requrement and supposed to be prepared and approved by the customer if necessary at the
right time.
All necassary technical documention shall be available at that place and time activity
period to starting the work in question. Client as per contract specification shall approve all
procedures that constitute part of installation procedure. All the special procedures shall be
carried out.
The QC/QA Depertement will maintain anu p to date list of all qualified
process qualified for and date qualified. The QA/QC Departement will ensure
QUALITY PLAN
that the welding electrodes are properl stored and that suffucient care is
to use.
welding procedure Specification (WPS) for welding the various parts of the
piping & structure as per connection detail of the drawing, material to be used
code requirement. The construction Code used for refernce can be obtained
production welding for each particular joint to be used. For welding procedure
All welding consumables, and their storage or drying conditions shall cnform
consumable
When the base metals of two different yield stress are welded
together, filler metal shall be selected based on the base which has
accordance with the specification, applicable codes and drawing. This will
use, proper lining-up of srtuctural component and aligment during and after
welding and final inspection for dimensions and lelveling after completion.
prior to assembly, during and after assembly to ensure that materials and
the inspction and procedures as per contract and applicable codes and the
Personel engaged in NDT will properly Qualified to ASNT level II will be well
testing.
contract shall be subject to inspection and test to verify theur conformity to the
contractor procedures
QUALITY PLAN
ETI. The system employed shall insure full traceability of record including back up in
submit the original of all inspection data’s and other related document to client, as
Inspection And Test Plan (ITP) will be presented as matrix of the inspection
party to cover the contractual scope of work. Detailed inspection and test plan
indicating inspection level (spot withness, verify, review, withness, hold point,
monitor, etc) ETI shall also prepare check sheets and inspection report for carrying
out the required quality control check according to particular discipline work actifities
All inspection and test eports shall be specific to the actifity and items which are to
be inspected.
progresing. The completed site MDR shall be submited to the client. As minimum,
the following inspection records shall be included in the MDR of site portion.
2. Manufacturing data
6. NDT plan
8. NDT report
11. Paint material certificate & dry film thickness (DFT) certificate/Calibration