0% found this document useful (0 votes)
50 views1 page

MG Vowgas Limited: Combination Load Cases

The document defines 21 load combination cases for structural analysis of an e-house. Each combination includes factors applied to dead loads, equipment loads, live loads, and wind loads in the X and Z directions. The primary combinations include the loads summed or multiplied by factors of 1.0 to 1.5 to cover required strength and serviceability limit states.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views1 page

MG Vowgas Limited: Combination Load Cases

The document defines 21 load combination cases for structural analysis of an e-house. Each combination includes factors applied to dead loads, equipment loads, live loads, and wind loads in the X and Z directions. The primary combinations include the loads summed or multiplied by factors of 1.0 to 1.5 to cover required strength and serviceability limit states.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Job No Sheet No Rev

MG VOWGAS LIMITED 1
Part
Software licensed to
Job Title SSAGS E-HOUSE Ref

By B.N.O Date15-Jan-20 Chd E.A


Client SCHNEIDER File SSAGS_E-HOUSE -EURODate/Time 20-Jul-2020 10:53

Combination Load Cases


Comb. Combination L/C Name Primary Primary L/C Name Factor

10 DL+EL 1 DEAD LOADS 1.00


3 EQUIPMENT LOAD 1.00
11 1.35(DL+EL) 1 DEAD LOADS 1.35
3 EQUIPMENT LOAD 1.35
12 1.35(DL+EL)+1.5(LL) 1 DEAD LOADS 1.35
3 EQUIPMENT LOAD 1.35
2 LIVE LOADS 1.50
13 1.35(DL+EL)+1.5(LL)+0.9(WL+X) 1 DEAD LOADS 1.35
3 EQUIPMENT LOAD 1.35
2 LIVE LOADS 1.50
4 WIND +X 0.90
14 1.35(DL+EL)+1.5(LL)+0.9(WL-X) 1 DEAD LOADS 1.35
3 EQUIPMENT LOAD 1.35
2 LIVE LOADS 1.50
5 WIND -X 0.90
15 1.35(DL+EL)+1.5(LL)+0.9(WL+Z) 1 DEAD LOADS 1.35
3 EQUIPMENT LOAD 1.35
2 LIVE LOADS 1.50
6 WIND +Z 0.90
16 1.35(DL+EL)+1.5(LL)+0.9(WL-Z) 1 DEAD LOADS 1.35
3 EQUIPMENT LOAD 1.35
2 LIVE LOADS 1.50
7 WIND -Z 0.90
17 DL+EL+LL 1 DEAD LOADS 1.00
3 EQUIPMENT LOAD 1.00
2 LIVE LOADS 1.00
18 DL+EL+LL+WL+X 1 DEAD LOADS 1.00
3 EQUIPMENT LOAD 1.00
2 LIVE LOADS 1.00
4 WIND +X 1.00
19 DL+EL+LL+WL-X 1 DEAD LOADS 1.00
3 EQUIPMENT LOAD 1.00
2 LIVE LOADS 1.00
5 WIND -X 1.00
20 DL+EL+LL+WL+Z 1 DEAD LOADS 1.00
3 EQUIPMENT LOAD 1.00
2 LIVE LOADS 1.00
6 WIND +Z 1.00
21 DL+EL+LL+WL-Z 1 DEAD LOADS 1.00
3 EQUIPMENT LOAD 1.00
2 LIVE LOADS 1.00
7 WIND -Z 1.00

Print Time/Date: 20/07/2020 17:02 STAAD.Pro V8i (SELECTseries 6) 20.07.11.90 Print Run 1 of 1

You might also like