Slab Analysis and Design Report

This document contains a slab analysis and design report for project JEFNEW. It analyzes and designs slabs for multiple strips (X1 through X9) on the first storey. For each slab strip, it provides the slab type, loads, dimensions, moment coefficients, required and supplied steel reinforcement, and checks deflection. Reinforcement of Y12-150 bars is specified as top and bottom reinforcement for all slab strips.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

Slab Analysis and Design Report

This document contains a slab analysis and design report for project JEFNEW. It analyzes and designs slabs for multiple strips (X1 through X9) on the first storey. For each slab strip, it provides the slab type, loads, dimensions, moment coefficients, required and supplied steel reinforcement, and checks deflection. Reinforcement of Y12-150 bars is specified as top and bottom reinforcement for all slab strips.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Project: JEFNEW - OkeBen Services (*1LX-CWX8-822F-L6MU)

SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-1

SLAB ANALYSIS AND DESIGN REPORT

NOTATION:
d/h = Effective/Total Depth of Slab (d=h-conc.cover)
g/q = Dead/Live Load (not factored)
L1 = Width of the Slab Along the Strip Direction
L2 = Width of the Slab Perpendicular to the Strip Direction
C = Moment Coefficient M=C p / L^2
M-spn = Ultimate Design Span Moment
M-sup = Ultimate Design Support Moment
Mc = Balanced Support Moment
As = Steel Area (Required/Supplied)

Material: C20/25 / Grade 410 (Type 2)

Slab Strip: X1 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0Support As = 376.99/753.98 Top:Y12-150(T1)

1S1 4 6.575 5267.74 0.0000 0.0000 296.8/753.98


132/175 5.000 1280.00 0.0 0.0 Bottom: Y12-150(B2)

Support Mc = 0.0Support As = 376.99/753.98 Top:Y12-150(T1)

1S6 2 6.575 3225.00 0.0000 0.0000 296.8/753.98


132/175 5.000 1280.00 0.0 0.0 Bottom: Y12-150(B2)

Support Mc = 0.0Support As = 376.99/753.98 Top:Y12-150(T1)

1S8 2 6.575 3012.05 0.0000 0.0000 296.8/753.98


132/175 5.000 1280.00 0.0 0.0 Bottom: Y12-150(B2)

Support Mc = 6.0Support As = 376.99/753.98 Top:Y12-150(T1)

1S10 4 6.575 2255.70 0.0688 0.0509 296.8/753.98


144/175 5.000 2926.11 6.0 4.5 Bottom: Y12-150(B1)
Deflection Check: L/d = 15.66 < 52.0 *** Sufficient ***

Support Mc = 0.7Support As = 376.99/753.98 Top:Y12-150(T1)

Slab Strip: X2 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.7Support As = 376.99/753.98 Top:Y12-150(T1)

1S15 3 6.575 5267.74 0.0370 0.0280 296.8/753.98


132/175 5.000 3087.75 6.1 4.6 Bottom: Y12-150(B2)

Support Mc = 8.8Support As = 376.99/753.98 Top:Y12-150(T1)

Project: JEFNEW
Project: JEFNEW - OkeBen Services (*1LX-CWX8-822F-L6MU)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-2

1S16 3 6.575 3225.00 0.0597 0.0444 296.8/753.98


144/175 5.000 5112.75 10.7 7.9 Bottom: Y12-150(B1)
Deflection Check: L/d = 22.4 < 52.0 *** Sufficient ***

Support Mc = 9.8Support As = 376.99/753.98 Top:Y12-150(T1)

1S9 1 6.575 3012.05 0.0499 0.0370 296.8/753.98


144/175 5.000 4212.75 7.8 5.8 Bottom: Y12-150(B1)
Deflection Check: L/d = 20.92 < 52.0 *** Sufficient ***

Support Mc = 6.9Support As = 376.99/753.98 Top:Y12-150(T1)

1S11 2 6.575 2255.70 0.0516 0.0383 296.8/753.98


144/175 5.000 2566.64 4.5 3.4 Bottom: Y12-150(B1)
Deflection Check: L/d = 15.66 < 52.0 *** Sufficient ***

Support Mc = 0.5Support As = 376.99/753.98 Top:Y12-150(T1)

Slab Strip: X3 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.1Support As = 376.99/753.98 Top:Y12-150(T1)

1S3 5 6.575 5267.74 0.0000 0.0340 296.8/753.98


132/175 5.000 3548.74 1.1 7.4 Bottom: Y12-150(B2)

Support Mc = 1.1Support As = 376.99/753.98 Top:Y12-150(T1)

Slab Strip: X4 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.9Support As = 376.99/753.98 Top:Y12-150(T1)

1S12 5 6.575 5267.74 0.0000 0.0340 296.8/753.98


132/175 5.000 3225.00 0.9 6.1 Bottom: Y12-150(B2)

Support Mc = 0.9Support As = 376.99/753.98 Top:Y12-150(T1)

Slab Strip: X5 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.9Support As = 376.99/753.98 Top:Y12-150(T1)

1S4 1 6.575 5267.74 0.0000 0.0240 296.8/753.98


132/175 5.000 3876.26 0.9 6.2 Bottom: Y12-150(B2)

Project: JEFNEW
Project: JEFNEW - OkeBen Services (*1LX-CWX8-822F-L6MU)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-3

Support Mc = 0.9Support As = 376.99/753.98 Top:Y12-150(T1)

Slab Strip: X6 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.8Support As = 376.99/753.98 Top:Y12-150(T1)

1S13 5 6.575 5267.74 0.0000 0.0340 296.8/753.98


132/175 5.000 3075.00 0.8 5.5 Bottom: Y12-150(B2)

Support Mc = 0.8Support As = 376.99/753.98 Top:Y12-150(T1)

Slab Strip: X7 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0Support As = 376.99/753.98 Top:Y12-150(T1)

1S5 4 6.575 3403.34 0.0000 0.0000 296.8/753.98


132/175 5.000 1425.00 0.0 0.0 Bottom: Y12-150(B2)

Support Mc = 6.0Support As = 376.99/753.98 Top:Y12-150(T1)

1S4 1 6.575 1864.40 0.1000 0.0860 296.8/753.98


144/175 5.000 5301.26 6.0 5.1 Bottom: Y12-150(B1)
Deflection Check: L/d = 12.95 < 52.0 *** Sufficient ***

Support Mc = 0.8Support As = 376.99/753.98 Top:Y12-150(T1)

Slab Strip: X8 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.0Support As = 376.99/753.98 Top:Y12-150(T1)

1S14 6 6.575 5267.74 0.0000 0.0000 296.8/753.98


132/175 5.000 1425.00 0.0 0.0 Bottom: Y12-150(B2)

Support Mc = 0.0Support As = 376.99/753.98 Top:Y12-150(T1)

Slab Strip: X9 -- Storey: 1


---------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.4Support As = 376.99/753.98 Top:Y12-150(T1)

Project: JEFNEW
Project: JEFNEW - OkeBen Services (*1LX-CWX8-822F-L6MU)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-4

1S1 4 6.575 1280.00 0.0860 0.0860 296.8/753.98


144/175 5.000 5267.74 2.4 2.4 Bottom: Y12-150(B1)
Deflection Check: L/d = 8.89 < 52.0 *** Sufficient ***

Support Mc = 8.8Support As = 376.99/753.98 Top:Y12-150(T1)

1S15 3 6.575 3087.75 0.0621 0.0463 296.8/753.98


144/175 5.000 5267.74 10.2 7.6 Bottom: Y12-150(B1)
Deflection Check: L/d = 21.44 < 52.0 *** Sufficient ***

Support Mc = 12.4Support As = 376.99/753.98 Top:Y12-150(T1)

1S3 5 6.575 3548.74 0.0617 0.0467 296.8/753.98


144/175 5.000 5267.74 13.4 10.1 Bottom: Y12-150(B1)
Deflection Check: L/d = 24.64 < 52.0 *** Sufficient ***

Support Mc = 13.4Support As = 376.99/753.98 Top:Y12-150(T1)

1S4 1 6.575 3876.26 0.0484 0.0362 296.8/753.98


144/175 5.000 5267.74 12.5 9.4 Bottom: Y12-150(B1)
Deflection Check: L/d = 26.92 < 52.0 *** Sufficient ***

Support Mc = 10.9Support As = 376.99/753.98 Top:Y12-150(T1)

1S5 4 6.575 1425.00 0.0860 0.0860 296.8/753.98


144/175 5.000 3403.34 3.0 3.0 Bottom: Y12-150(B1)
Deflection Check: L/d = 9.9 < 52.0 *** Sufficient ***

Support Mc = 0.5Support As = 376.99/753.98 Top:Y12-150(T1)

Slab Strip: X10 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 1.7Support As = 376.99/753.98 Top:Y12-150(T1)

1S4 1 6.575 5301.26 0.0000 0.0240 296.8/753.98


132/175 5.000 5267.74 1.7 11.5 Bottom: Y12-150(B2)

Support Mc = 1.7Support As = 376.99/753.98 Top:Y12-150(T1)

Slab Strip: X11 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.4Support As = 376.99/753.98 Top:Y12-150(T1)

1S6 2 6.575 1280.00 0.1000 0.0860 296.8/753.98


144/175 5.000 3225.00 2.8 2.4 Bottom: Y12-150(B1)
Deflection Check: L/d = 8.89 < 52.0 *** Sufficient ***

Support Mc = 6.2Support As = 376.99/753.98 Top:Y12-150(T1)

Project: JEFNEW
Project: JEFNEW - OkeBen Services (*1LX-CWX8-822F-L6MU)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-5

1S16 3 6.575 5112.75 0.0370 0.0280 296.8/753.98


132/175 5.000 3225.00 6.6 5.0 Bottom: Y12-150(B2)

Support Mc = 0.8Support As = 376.99/753.98 Top:Y12-150(T1)

Slab Strip: X12 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.4Support As = 376.99/753.98 Top:Y12-150(T1)

1S8 2 6.575 1280.00 0.0860 0.0860 296.8/753.98


144/175 5.000 3012.05 2.4 2.4 Bottom: Y12-150(B1)
Deflection Check: L/d = 8.89 < 52.0 *** Sufficient ***

Support Mc = 4.6Support As = 376.99/753.98 Top:Y12-150(T1)

1S9 1 6.575 4212.75 0.0320 0.0240 296.8/753.98


132/175 5.000 3012.05 5.0 3.7 Bottom: Y12-150(B2)

Support Mc = 9.1Support As = 376.99/753.98 Top:Y12-150(T1)

1S12 5 6.575 3225.00 0.0647 0.0486 296.8/753.98


144/175 5.000 5267.74 11.6 8.7 Bottom: Y12-150(B1)
Deflection Check: L/d = 22.4 < 52.0 *** Sufficient ***

Support Mc = 11.6Support As = 376.99/753.98 Top:Y12-150(T1)

1S13 5 6.575 3075.00 0.0663 0.0496 296.8/753.98


144/175 5.000 5267.74 10.8 8.1 Bottom: Y12-150(B1)
Deflection Check: L/d = 21.35 < 52.0 *** Sufficient ***

Support Mc = 9.2Support As = 376.99/753.98 Top:Y12-150(T1)

1S14 6 6.575 1425.00 0.0860 0.0860 296.8/753.98


144/175 5.000 5267.74 3.0 3.0 Bottom: Y12-150(B1)
Deflection Check: L/d = 9.9 < 52.0 *** Sufficient ***

Support Mc = 0.5Support As = 376.99/753.98 Top:Y12-150(T1)

Slab Strip: X13 -- Storey: 1


----------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 0.4Support As = 376.99/753.98 Top:Y12-150(T1)

1S10 4 6.575 2926.11 0.0450 0.0340 296.8/753.98


132/175 5.000 2255.70 3.9 3.0 Bottom: Y12-150(B2)

Support Mc = 3.9Support As = 376.99/753.98 Top:Y12-150(T1)

1S11 2 6.575 2566.64 0.0370 0.0280 296.8/753.98


132/175 5.000 2255.70 3.2 2.5 Bottom: Y12-150(B2)

Project: JEFNEW
Project: JEFNEW - OkeBen Services (*1LX-CWX8-822F-L6MU)
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-6

Support Mc = 9.1Support As = 376.99/753.98 Top:Y12-150(T1)

1S12 5 6.575 3225.00 0.0647 0.0486 296.8/753.98


144/175 5.000 5267.74 11.6 8.7 Bottom: Y12-150(B1)
Deflection Check: L/d = 22.4 < 52.0 *** Sufficient ***

Support Mc = 11.6Support As = 376.99/753.98 Top:Y12-150(T1)

1S13 5 6.575 3075.00 0.0663 0.0496 296.8/753.98


144/175 5.000 5267.74 10.8 8.1 Bottom: Y12-150(B1)
Deflection Check: L/d = 21.35 < 52.0 *** Sufficient ***

Support Mc = 9.2Support As = 376.99/753.98 Top:Y12-150(T1)

1S14 6 6.575 1425.00 0.0860 0.0860 296.8/753.98


144/175 5.000 5267.74 3.0 3.0 Bottom: Y12-150(B1)
Deflection Check: L/d = 9.9 < 52.0 *** Sufficient ***

Support Mc = 0.5Support As = 376.99/753.98 Top:Y12-150(T1)

Project: JEFNEW