0% found this document useful (0 votes)
37 views36 pages

LKHNI01 - TDD - LTE CAT - HP - Reports

This document provides a summary report of key performance indicators for the Airtel Cluster KHNI01 acceptance test. It includes results for several technical metrics like session setup success rate, throughput speeds, handover success rates, coverage plots and drive test results. Most metrics met or exceeded their targets, with coverage and signal strength found to be negatively impacted in some high elevation, mountainous areas as shown on Google Maps.

Uploaded by

shivam hp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views36 pages

LKHNI01 - TDD - LTE CAT - HP - Reports

This document provides a summary report of key performance indicators for the Airtel Cluster KHNI01 acceptance test. It includes results for several technical metrics like session setup success rate, throughput speeds, handover success rates, coverage plots and drive test results. Most metrics met or exceeded their targets, with coverage and signal strength found to be negatively impacted in some high elevation, mountainous areas as shown on Google Maps.

Uploaded by

shivam hp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 36

AIRTEL CLUST

Cluster Number
Cluster Name
# Cluster Sites

No. Key Performance Indicator


1
2 Session
3
4
5
Downlink and Uplink Peak/average user throughput

10
11 Handover Success rate
12

Handover Delays
13

15 Attach and Detach

17
19
Delays
20
21
22
Applications Average Throughput
23
24
25
26
Application Testing
27
28
29
30 Others
31

33
Coverage/Quality

34
Coverage Plots (RSRP/CQI/SINR) to be attached

op games through online gaming sites (as per Airtel business inputs) and no noticeable delay wil

ended video as per network quality central team guidelines and buffering issues will be checke
AIRTEL CLUSTER KPI ACCEPTANCE REPORT
KHNI01 UE - 1
KHNI01 UE - 2
1 UE - 3

erformance Indicator Target Result Set up


Session set up success rate 98% 100.00000 UE - 3
Session abnormal release rate <=1.5% 0.00000 UE - 3
Session establishment time 150-200 ms 129.75 UE - 3
TCP DL >=4 Mbps 9.02 UE - 1
TCP UL >=2 Mbps 2.26 UE - 2
UDP DL Static-10% Sites
UDP UL Static-10% Sites
Intra Site 98% 100% UE - 1
Inter Site 98% 100% UE - 1
IRAT UE - 1
Handover delay/ Interruption time <50 ms 28 Intra Site - UE - 1
Handover delay/ Interruption time <100 ms 32.77 Inter Site - UE - 1
Handover delay/ Interruption time 150-200 ms Network Statistics
Network attach time (with Authentication) <950 ms 0 UE - 3
Network attach time (without Authentication) <550 ms 448.5 UE - 3
Network attach success rate 98% 100% UE - 3
Network Detach time 60-100 ms 66 UE - 3
Network Detach Success rate 98% 100.00% UE - 3
Round trip time or Latency 50-60 ms 51.49 UE - 3
Jitter Network Statistics
Video Streaming 10.5 Static-10% Sites
Online Gaming 12.32 Static-10% Sites
Skype (DL/UL)(3.14/0.20) Static-10% Sites
Top 10 Websites 4.51 Static-10% Sites
Web page load time 4.74 Static-10% Sites
Calls through Skype Static-10% Sites
Delay in online gaming Static-10% Sites
You tube video streaming session 6.79 Static-10% Sites
TAU 0.00% UE - 3
Paging Network Statistics
CSFB and VoLTE: MO/MT/M2M call set up time OK If applicable
RSRP -93.57 UE - 1
CQI 9.2 UE - 1
SINR 8.9 UE - 1
Handsets
Coverage Plots (RSRP/CQI/SINR) to be attached

tel business inputs) and no noticeable delay will be checked under the test. Test should be don

m guidelines and buffering issues will be checked under the test. Test should be done on 10% of
DL Througput (Big File)
UL Throughput (Big File)
Short Call (Session Attach / Detach/RTT from FTP Server)_Via Script

Comment
Pass
Pass
Pass
Pass
Pass
Report Only
Report Only
Pass
Pass

Pass
Pass
Not applicable
Pass
Pass
Pass
Pass
Pass
Pass
Report Only
Report Only
Report Only
Report Only
Report Only
Report Only
Report Only
Report Only
Report Only

Report Only
Report Only, checked for 3 sites
Report Only
Report Only
Report Only
CLUSTER DRIVE PLOTS LKHNI01_TDD_CAT
LTE Physical CELL ID
Serving Cell RSRP

Serving Cell SINR

Serving Cell SINR


RSRQ
LTE Physical Downlink Throughput
LTE Physical Uplink Throughput
HNI01_TDD_CAT
Google earth
No Area To Drive
DRIVE ROUTE
RSRP

RSRP

UL

PRE DRIVE

UL

SINR
SINR

PRE DRIVE

SINR
GOOGLE MAP

PCI not servng proper due to


high slop , zigzag route and
moutain reflection of other site
as shown in google map
RSRP IS POOR DUE TO HIGH elevaion and
mountain shadow

RSRP is poor due to hih elevation and


mountain shadow
SINR IS POOR DUE TO HIGH SLOPING
AND ZIGZAG AREA AND ALSO
MOUNTAIN REFLECTION AS SHOWN
IN GOOGLE EARTH PIC

SINR IS POOR DUE TO HIGH elevaion and


mountain shadow

SINR is poor due to high elevation and


mountain shadow
H elevaion and
ow

ue to hih elevation and


ow
elevaion and
w

gh elevation and
CAT DATE Site ID 4G Cell ID Lat Long Ant HT. Tower Type Pre Azimuth
13-Feb KHNI01 KHNI01P 32.47336 76.49558 39 GBT 130
13-Feb KHNI01 KHNI01Q 32.47336 76.49558 39 GBT 200
13-Feb KHNI01 KHNI01R 32.47336 76.49558 39 GBT 260
Post Azimuth Pre E. TILT Post E. TILT Pre M. TILT Post M. TILT CAT Done Date
130 2 2 2 2 1-Dec-19
200 2 2 2 2 1-Dec-19
260 2 2 2 2 1-Dec-19

You might also like