Adidas Document List - IA&IA Follow up&PA - Final June 2016 PDF
Adidas Document List - IA&IA Follow up&PA - Final June 2016 PDF
Important notes:
1. All documents must be available during onsite visit ; Original (not copy) document should be available during on site visit , unless stated otherwise
2. For documents listed in both Part A and Part B, factory can choose to submit in one worksheet only.
3. List can be added with any document needed specific by country for each part (A, B, C, D)
A. General Document
1 Business Registration
*
2 Permits and Licenses mandatory by Local Regulation
*
3 Tax Registration
6 Company Profile
7 Employee Breakdown Number / Total Workforce in the factory (i.e. number employee per
department, male, females, temporary, permanent, etc.)
8 Factory Floor Plan/Emergency Layout of all areas
9 Organization Chart (HR , HSE and compliance team) & Job Description
10 Labor & HSE Training Document/Records for the last 6 - 12 months which include
certification (if any)
f. Copy of employees other related doc i.e. leave records, reward records, warning
letter, etc. (if any)
2 Local Minimum Wage Standard/Decree; Local Work Hours Standard/Decree and/or Internal
Company Wage Structure
3 Payroll & Working Hours documents/records for the last 6 to 12 months - related
to:
a. Time card / Attendance Records / Print Out of employee's time in & out
b. Overtime Request / Consent Letter
e. Pay Slip
5 Status of Disciplinary Records for the last 6 to 12 months (i.e. Warning Letter Log
Book), Record of Verbal Warning, Written Warning, Demotion and Termination.
6 List of newly hired employees for the last 3 months & its status (i.e. intern /
trainers / probation)
7 Registration of Union / Employee Representative to local authority (if any)
9 Records of Grievance system i.e. Suggestion box, hotline channels, etc. (if any)
PART A : List of Document For IA/IA Follow Up/PA
Important notes:
1. All documents must be available during onsite visit ; Original (not copy) document should be available during on site visit , unless stated otherwise
2. For documents listed in both Part A and Part B, factory can choose to submit in one worksheet only.
3. List can be added with any document needed specific by country for each part (A, B, C, D)
i. Regular workplace monitoring : drinking water, waste water, noise, air quality
(as required by local law) etc.
Chemical List.xlsx *
9 Fire and Evacuation Drill records within 6 months
*
2 List of the Pregnant, PWD, Migrant, Juvenile Employees and Outsource Employees in
the factory (include country of origin for migrant employees). Current job position
for pregnant and juvenile; Age proof documents for Juvenile.