This document contains a bill of quantities for construction materials and labor costs. It lists 6 items with their unit rates and quantities. It then breaks down the costs for each item, including material costs, labor for pouring, mixing, and curing. Additional costs shown include equipment like mixers, fuel, transportation, vibrators, and shuttering. The total cost for all items and labor is estimated to be ₹498,494.70 plus ₹236,510 for loadings, for a grand total cost of ₹734,994.70.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
32 views4 pages
Book 1
This document contains a bill of quantities for construction materials and labor costs. It lists 6 items with their unit rates and quantities. It then breaks down the costs for each item, including material costs, labor for pouring, mixing, and curing. Additional costs shown include equipment like mixers, fuel, transportation, vibrators, and shuttering. The total cost for all items and labor is estimated to be ₹498,494.70 plus ₹236,510 for loadings, for a grand total cost of ₹734,994.70.