0% found this document useful (0 votes)
32 views4 pages

Book 1

This document contains a bill of quantities for construction materials and labor costs. It lists 6 items with their unit rates and quantities. It then breaks down the costs for each item, including material costs, labor for pouring, mixing, and curing. Additional costs shown include equipment like mixers, fuel, transportation, vibrators, and shuttering. The total cost for all items and labor is estimated to be ₹498,494.70 plus ₹236,510 for loadings, for a grand total cost of ₹734,994.70.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views4 pages

Book 1

This document contains a bill of quantities for construction materials and labor costs. It lists 6 items with their unit rates and quantities. It then breaks down the costs for each item, including material costs, labor for pouring, mixing, and curing. Additional costs shown include equipment like mixers, fuel, transportation, vibrators, and shuttering. The total cost for all items and labor is estimated to be ₹498,494.70 plus ₹236,510 for loadings, for a grand total cost of ₹734,994.70.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

BILL OF QUANTITIES

Sr.No Description Unit Qty Rate (Rs)

1 RCC foundation 3000psi Cum 100.00 7,350.07


2 RCC Slab 3000psi Cum 40 10205.81
3 Steel Reinforcement kgs 50000 118.42
4 Brick Work Cum 100 9356.68
5 Block Work
6 Plaster
Cost
Material Cost Pouring Labour Mixing Labor Curing Labor

Amount (Rs) Unit Rate Amount Unit Rate Amount Unit Rate Amount Unit Rate Amount

735,007.00 4534.922 453,492.20 54 5,400.00 25 2,500.00 0.625 62.50


408,232.40 - - - -
5,921,000.00 - - - -
935,668.00 - - - -
- - - -
- - - -
Cost Breakdown
Mixer machine Fuel cost MVT Vibrator + Shaft Shuttering

Unit Rate Amount Unit Rate Amount Unit Rate Amount Unit Rate Amount Unit Rate

100 10,000.00 75 7,500.00 40 4,000.00 125 12,500.00 30.4


- - - -
- - - -
- - - -
- - - -
- - - -
Shuttering Loadings
TOTAL
Amount AMOUNT Unit Rate Amount

3,040.00 498,494.70 2365.1 236,510.00


- -
- -
- -
- -
- -