Abstract of Cost of Oldage Block B

This document provides an estimate for the Oldage Block B project located in Sainamaina, Butwal, Nepal. It was prepared by ECoCoDE Nepal for the Sainamaina Municipality. The document includes a cost breakdown with 17 line items and calculations for various parts of the excavation and brick soling work. The total estimated cost for the project is 341,631,156.78 NPR.

Uploaded by

Sonam Sherpa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views

Abstract of Cost of Oldage Block B

This document provides an estimate for the Oldage Block B project located in Sainamaina, Butwal, Nepal. It was prepared by ECoCoDE Nepal for the Sainamaina Municipality. The document includes a cost breakdown with 17 line items and calculations for various parts of the excavation and brick soling work. The total estimated cost for the project is 341,631,156.78 NPR.

Uploaded by

Sonam Sherpa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 52

Project : Estimate of Oldage Block B

Location : Sainamaina, Butwal


Owner:Sainamaina Municipality
Preapared By:ECoCoDE Nepal
Jwagal-10, Kupondole,Lalitpur

Abstract of Cost of Oldage Block B


S.N. Description of item Unit Quantity Rate Amount Remarks
1 site clearance job 1.00 100,000.00 100000.00
Earthwork excavation in foundation and trenches in
all type of soil excluding rock in both dry and wet
condition including shoring and strutting when ever
necessary. Also Also pumping out water as when
2 Cum 1059.392 452.81 479,705.71
necessary from the trenches etc. having lead of 30
m as per drawings, specifications and instructions of
site Engineers all complete.

Dry brick soling in foundation and floor including


3 sand filling in joints, leveling, watering etc. all Sqm 2631.633 977.92 2,573,516.26
complete.
Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations, flooring and walls with approved
quality of cement and sand and crushed stone
4 Cum 2098.139 13,332.50 27,973,433.30
aggregate including mixing, laying, curing etc all
complete in approval of site engineer.

5 Dwarf wall Cum 122.127 5,832.44 712,299.72


Tor steel reinforcement bar of Fe 415/500 grade
including straightening, cleaning, cutting, binding &
7 fixing in position with annealed tying binding wire as MT 432.924 114,703.65 49,657,922.91
per drawing, design & instruction all complete.

Formwork, shuttering, centering with approved


materials for all works necessary propping,
scaffolding, staging, supporting inclusive of wedging
8 Sqm 17327.305 831.93 14,415,109.22
and cutting holes for utilization till the support if
fully unyielding nett.

9 Backfilling cum 602.730 325.22 196,019.85


10 Super structure wall Cum 13536.126 12,942.72 175,194,312.95
11 False Ceiling Sqm 8422.200 861.35 7,254,461.97
12 Plaster Sqm 29428.262 445.05 13,096,930.03
13 Wall puty Sqm 29428.262 22.75 669,492.97
14 Distemper Painting Sqm 25963.526 222.85 5,785,971.69
15 Weather Coat Sqm 3464.737 229.95 796,730.07
16 stainless Railing Rm 488.040 1,619.20 790,234.37
17 Almuinum Door and Windows Panel Sqm 1179.812 9,219.81 10,877,637.87
Sub total 310,573,778.89
Electrical 15,528,688.94
Sanitary 15,528,688.94
TOTAL AMOUNT 341,631,156.78
Calculation of Cost of Oldage Block B
S.N Description of work No. Length Breadth Height Quantity Unit Remarks
1 site clearance 1.000
Total 1.000 job

Earthwork excavation in foundation


and trenches in all type of soil
excluding rock in both dry and wet
condition including shoring and
strutting when ever necessary. Also
1
Also pumping out water as when
necessary from the trenches etc.
having lead of 30 m as per
drawings, specifications and
instructions of site Engineers all
complete.
Column Foundation
2nd Basement
Along Grid B-C 14 1.800 1.800 1.500 68.040
Along Grid A 6 1.800 1.800 1.500 29.160
1st Basement
Along Grid A 1 1.800 1.800 1.500 4.860
Along D 6 1.800 1.800 1.500 29.160
Along E 3 1.800 1.800 1.500 14.580
Ground Floor
Along D 1 1.800 1.800 1.500 4.860
Along E 4 1.800 1.800 1.500 19.440
Along F 4 1.800 1.800 1.500 19.440
First Floor
Along F 3 1.800 1.800 1.500 14.580
For Toe wall
2nd Basement
Along A 1 27.900 1.000 1.500 41.850
Along Grid B-C 2 34.100 1.000 1.500 102.300
Along 1 1 6.400 1.000 1.500 9.600
Along 2- 7 6 13.300 1.000 1.500 119.700
1st Basement
Along D 1 36.900 1.000 1.500 55.350
Along E 1 13.500 1.000 1.500 20.250
Along 1 1 6.900 1.000 1.500 10.350
Along 2-4 3 7.950 1.000 1.500 35.775
Along 4-7 3 13.600 1.000 1.500 61.200
Ground Floor
Along D 1 7.400 1.000 1.500 11.100
Along E 1 20.600 1.000 1.500 30.900
Along F 1 14.400 1.000 1.500 21.600
Along 1 1 13.600 1.000 1.500 20.400
Along 2 -3 2 7.400 1.000 1.500 22.200
Along 4 1 13.600 1.000 1.500 20.400
Along 5-7 3 7.400 1.000 1.500 33.300
First Floor
Along F 1 20.600 1.800 1.500 55.620
Along Grid 1,2,3 3 7.400 1.000 1.500 33.300
Total 909.315 Cum

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks

Dry brick soling in foundation and


floor including sand filling in joints,
2 leveling, watering etc. all complete.
Column Foundation
2nd Basement
Along Grid B-C 14 1.800 1.800 45.360
Along Grid A 6 1.800 1.800 19.440
1st Basement 0.000
Along Grid A 1 1.800 1.800 3.240
Along D 6 1.800 1.800 19.440
Along E 3 1.800 1.800 9.720
Ground Floor 0.000
Along D 1 1.800 1.800 3.240
Along E 4 1.800 1.800 12.960
Along F 4 1.800 1.800 12.960
First Floor 0.000
Along F 3 1.800 1.800 9.720
For Toe wall 0.000
2nd Basement 0.000
Along A 1 27.900 1.000 27.900
Along Grid B-C 2 34.100 1.000 68.200
Along 1 1 6.400 1.000 6.400
Along 2- 7 6 13.300 1.000 79.800
1st Basement 0.000
Along D 1 36.900 1.000 36.900
Along E 1 13.500 1.000 13.500
Along 1 1 6.900 1.000 6.900
Along 2-4 3 7.950 1.000 23.850
Along 4-7 3 13.600 1.000 40.800
Ground Floor 0.000
Along D 1 7.400 1.000 7.400
Along E 1 20.600 1.000 20.600
Along F 1 14.400 1.000 14.400
Along 1 1 13.600 1.000 13.600
Along 2 -3 2 7.400 1.000 14.800
Along 4 1 13.600 1.000 13.600
Along 5-7 3 7.400 1.000 22.200
First Floor 0.000
Along F 1 20.600 1.800 37.080
Along Grid 1,2,3 3 7.400 1.000 22.200
Flooring 1 2009.100
Total 2615.310 Sqm
Plain cement Concrete (PCC) in
1:3:6 ratio for foundations,
flooring and walls with approved
quality of cement and sand and
crushed stone aggregate including
mixing, laying, curing etc all
complete in approval of site
3 engineer.
Column Foundation
2nd Basement
Along Grid B-C 14 1.800 1.800 0.075 3.402

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Along Grid A 6 1.800 1.800 0.075 1.458
1st Basement 0.075 0.000
Along Grid A 1 1.800 1.800 0.075 0.243
Along D 6 1.800 1.800 0.075 1.458
Along E 3 1.800 1.800 0.075 0.729
Ground Floor 0.075 0.000
Along D 1 1.800 1.800 0.075 0.243
Along E 4 1.800 1.800 0.075 0.972
Along F 4 1.800 1.800 0.075 0.972
First Floor 0.075 0.000
Along F 3 1.800 1.800 0.075 0.729
For Toe wall 0.075 0.000
2nd Basement 0.075 0.000
Along A 1 27.900 1.000 0.075 2.093
Along Grid B-C 2 34.100 1.000 0.075 5.115
Along 1 1 6.400 1.000 0.075 0.480
Along 2- 7 6 13.300 1.000 0.075 5.985
1st Basement 0.075 0.000
Along D 1 36.900 1.000 0.075 2.768
Along E 1 13.500 1.000 0.075 1.013
Along 1 1 6.900 1.000 0.075 0.518
Along 2-4 3 7.950 1.000 0.075 1.789
Along 4-7 3 13.600 1.000 0.075 3.060
Ground Floor 0.075 0.000
Along D 1 7.400 1.000 0.075 0.555
Along E 1 20.600 1.000 0.075 1.545
Along F 1 14.400 1.000 0.075 1.080
Along 1 1 13.600 1.000 0.075 1.020
Along 2 -3 2 7.400 1.000 0.075 1.110
Along 4 1 13.600 1.000 0.075 1.020
Along 5-7 3 7.400 1.000 0.075 1.665
First Floor 0.075 0.000
Along F 1 20.600 1.800 0.075 2.781
Along Grid 1,2,3 3 7.400 1.000 0.075 1.665
Flooring 1 2009.100 0.075 150.683
Total 196.148 Cum
4 Dwarf wall
Tie Beam
For Toe wall
2nd Basement
Along A 1 33.900 0.230 1.070 8.343
Along Grid B-C 2 41.300 0.230 1.070 20.328
Along 1 1 6.400 0.230 1.070 1.575
Along 2- 7 6 13.300 0.230 1.070 19.639
1st Basement 0.230 1.070 0.000
Along D 1 33.900 0.230 1.070 8.343
Along E 1 15.900 0.230 1.070 3.913
Along 1 1 6.900 0.230 1.070 1.698
Along 2-4 3 9.150 0.230 1.070 6.755
Along 4-7 3 14.800 0.230 1.070 10.927
Ground Floor 0.230 1.070 0.000
Along D 1 7.400 0.230 1.070 1.821
Along E 1 25.400 0.230 1.070 6.251
Along F 1 18.000 0.230 1.070 4.430

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Along 1 1 14.800 0.230 1.070 3.642
Along 2 -3 2 7.400 0.230 1.070 3.642
Along 4 1 14.800 0.230 1.070 3.642
Along 5-7 3 7.400 0.230 1.070 5.463
First Floor 0.230 1.070 0.000
Along F 1 25.400 0.230 1.070 6.251
Along Grid 1,2,3 3 7.400 0.230 1.070 5.463
122.127 Cum

Providing and laying machine


mixed / machine vibrated Plain
Cement Concrete ( PCC ) of grade
M20/20 ( Design Mixed ) / in
nominal mix on volumetric
proportion of 1:1.5:3(1 cement:
1.5coarse sand :3coarse graded
aggregate 20 mm down) for RCC
works, on Basement Ramp, Shear
Walls, Columns, Beams, Slabs,
Staircase, etc including necessary
compaction, levelling, curing,
testing etc, as per drawings,
specifications and instructions of
5 site Engineer'sall complete.
Column Foundation
Footing Base F1 42 1.875 1.875 0.200 29.531
2.078=((1.
875*1.875
)+(0.8*0.8)
Footing Slope 42 2.078 0.100 8.727 )/2
Column upto +14.4
From 2nd Basement
Along Grid B-C 14 0.600 0.600 19.520 5.040
Along Grid A 6 0.600 0.600 19.520 2.160
From 1st Basement
Along Grid A 1 0.600 0.600 15.470 0.360
Along D 6 0.600 0.600 15.470 2.160
Along E 3 0.600 0.600 15.470 1.080
From Ground Floor
Along D 1 0.600 0.600 11.870 0.360
Along E 4 0.600 0.600 11.870 1.440
Along F 4 0.600 0.600 11.870 1.440
From First Floor
Along F 3 0.600 0.600 8.270 1.080
Upto +20.00
From 2nd Basement
Along Grid A-F 30 0.600 0.600 5.600 10.800
lower beam
2nd Basement
Along A 1 33.900 0.230 0.300 2.339
Along Grid B-C 2 41.300 0.230 0.300 5.699
Along 1 1 6.400 0.230 0.300 0.442
Along 2- 7 6 13.300 0.230 0.300 5.506

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
1st Basement 0.230 0.300 0.000
Along D 1 33.900 0.230 0.300 2.339
Along E 1 15.900 0.230 0.300 1.097
Along 1 1 6.900 0.230 0.300 0.476
Along 2-4 3 9.150 0.230 0.300 1.894
Along 4-7 3 14.800 0.230 0.300 3.064
Ground Floor 0.230 0.300 0.000
Along D 1 7.400 0.230 0.300 0.511
Along E 1 25.400 0.230 0.300 1.753
Along F 1 18.000 0.230 0.300 1.242
Along 1 1 14.800 0.230 0.300 1.021
Along 2 -3 2 7.400 0.230 0.300 1.021
Along 4 1 14.800 0.230 0.300 1.021
Along 5-7 3 7.400 0.230 0.300 1.532
First Floor 0.230 0.300 0.000
Along F 1 25.400 0.230 0.300 1.753
Along Grid 1,2,3 3 7.400 0.230 0.300 1.532 98.419
Tie Beam
2nd Basement
Along A 1 33.900 0.230 0.450 3.509
Along Grid B-C 2 41.300 0.230 0.450 8.549
Along 1 1 6.400 0.230 0.450 0.662
Along 2- 7 6 13.300 0.230 0.450 8.259
1st Basement
Along D 1 33.900 0.230 0.450 3.509
Along E 1 15.900 0.230 0.450 1.646
Along 1 1 6.900 0.230 0.450 0.714
Along 2-4 3 9.150 0.230 0.450 2.841
Along 4-7 3 14.800 0.230 0.450 4.595
Ground Floor
Along D 1 7.400 0.230 0.450 0.766
Along E 1 25.400 0.230 0.450 2.629
Along F 1 18.000 0.230 0.450 1.863
Along 1 1 14.800 0.230 0.450 1.532
Along 2 -3 2 7.400 0.230 0.450 1.532
Along 4 1 14.800 0.230 0.450 1.532
Along 5-7 3 7.400 0.230 0.450 2.298
First Floor
Along F 1 25.400 0.230 0.450 2.629
Along Grid 1,2,3 3 7.400 0.230 0.450 2.298
Beam +0 level
2nd Basement
Along A 1 33.900 0.350 0.550 6.526
Along Grid B-C 2 41.300 0.350 0.550 15.901
Along 1 1 6.400 0.350 0.550 1.232
Along 2- 7 6 13.300 0.350 0.550 15.362
Beam +3.6 level
2nd Basement
Along A 1 33.900 0.350 0.550 6.526
Along Grid B-C 2 41.300 0.350 0.550 15.901
Along 1 1 6.400 0.350 0.550 1.232
Along 2- 7 6 13.300 0.350 0.550 15.362
1st Basement 0.550
Along D 1 33.900 0.350 0.550 6.526

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Along E 1 15.900 0.350 0.550 3.061
Along 1 1 6.900 0.350 0.550 1.328
Along 2-4 3 9.150 0.350 0.550 5.284
Along 4-7 3 14.800 0.350 0.550 8.547
Beam +7.2 level 0.350 0.550
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 6.526
Along Grid B-C 2 41.300 0.350 0.550 15.901
Along 1 1 6.400 0.350 0.550 1.232
Along 2- 7 6 13.300 0.350 0.550 15.362
1st Basement
Along D 1 33.900 0.350 0.550 6.526
Along E 1 15.900 0.350 0.550 3.061
Along 1 1 6.900 0.350 0.550 1.328
Along 2-4 3 9.150 0.350 0.550 5.284
Along 4-7 3 14.800 0.350 0.550 8.547
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 1.425
Along E 1 25.400 0.350 0.550 4.890
Along F 1 18.000 0.350 0.550 3.465
Along 1 1 14.800 0.350 0.550 2.849
Along 2 -3 2 7.400 0.350 0.550 2.849
Along 4 1 14.800 0.350 0.550 2.849
Along 5-7 3 7.400 0.350 0.550 4.274
Beam +10.8 level 0.350 0.550 0.000
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 6.526
Along Grid B-C 2 41.300 0.350 0.550 15.901
Along 1 1 6.400 0.350 0.550 1.232
Along 2- 7 6 13.300 0.350 0.550 15.362
1st Basement 0.350 0.550 0.000
Along D 1 33.900 0.350 0.550 6.526
Along E 1 15.900 0.350 0.550 3.061
Along 1 1 6.900 0.350 0.550 1.328
Along 2-4 3 9.150 0.350 0.550 5.284
Along 4-7 3 14.800 0.350 0.550 8.547
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 1.425
Along E 1 25.400 0.350 0.550 4.890
Along F 1 18.000 0.350 0.550 3.465
Along 1 1 14.800 0.350 0.550 2.849
Along 2 -3 2 7.400 0.350 0.550 2.849
Along 4 1 14.800 0.350 0.550 2.849
Along 5-7 3 7.400 0.350 0.550 4.274
First Floor 0.350 0.550 0.000
Along F 1 25.400 0.350 0.550 4.890
Along Grid 1,2,3 3 7.400 0.350 0.550 4.274
Beam +14.4 level
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 6.526
Along Grid B-C 2 41.300 0.350 0.550 15.901
Along 1 1 6.400 0.350 0.550 1.232
Along 2- 7 6 13.300 0.350 0.550 15.362
1st Basement 0.350 0.550 0.000

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Along D 1 33.900 0.350 0.550 6.526
Along E 1 15.900 0.350 0.550 3.061
Along 1 1 6.900 0.350 0.550 1.328
Along 2-4 3 9.150 0.350 0.550 5.284
Along 4-7 3 14.800 0.350 0.550 8.547
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 1.425
Along E 1 25.400 0.350 0.550 4.890
Along F 1 18.000 0.350 0.550 3.465
Along 1 1 14.800 0.350 0.550 2.849
Along 2 -3 2 7.400 0.350 0.550 2.849
Along 4 1 14.800 0.350 0.550 2.849
Along 5-7 3 7.400 0.350 0.550 4.274
First Floor 0.350 0.550 0.000
Along F 1 25.400 0.350 0.550 4.890
Along Grid 1,2,3 3 7.400 0.350 0.550 4.274
Beam +18.05 level
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 6.526
Along Grid B-C 2 41.300 0.350 0.550 15.901
Along 1 1 6.400 0.350 0.550 1.232
Along 2- 7 6 13.300 0.350 0.550 15.362
1st Basement 0.350 0.550 0.000
Along D 1 33.900 0.350 0.550 6.526
Along E 1 15.900 0.350 0.550 3.061
Along 1 1 6.900 0.350 0.550 1.328
Along 2-4 3 9.150 0.350 0.550 5.284
Along 4-7 3 14.800 0.350 0.550 8.547
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 1.425
Along E 1 25.400 0.350 0.550 4.890
Along F 1 18.000 0.350 0.550 3.465
Along 1 1 14.800 0.350 0.550 2.849
Along 2 -3 2 7.400 0.350 0.550 2.849
Along 4 1 14.800 0.350 0.550 2.849
Along 5-7 3 7.400 0.350 0.550 4.274
First Floor 0.350 0.550 0.000
Along F 1 25.400 0.350 0.550 4.890
Along Grid 1,2,3 3 7.400 0.350 0.550 4.274
shear wall
Along Grid C 1 41.300 0.350 3.600 52.038
Slab
1st Basement 1 639.400 0.125 79.925
Beam +3.6 level 1 1165.800 0.125 145.725
Beam +7.2 level 1 1764.700 0.125 220.588
Beam +10.8 level 1 2009.100 0.125 251.138
Beam +14.4 level 1 2009.100 0.125 251.138
Beam +18.05 level 1 1473.500 0.125 184.188
1900.767 Cum

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks

Tor steel reinforcement bar of Fe


415/500 grade including
straightening, cleaning, cutting,
binding & fixing in position with
annealed tying binding wire as per
drawing, design & instruction all
6 complete.
A Foundation
F1 2 2.100 2.100
main bar 16mm @ 150 c/c 15.00 2.39 1.58 113.05 kg
distribution bar 16mm @ 150 c/c 15.00 2.39 1.58 113.05 kg

F2 3 3.510 3.510
main bar 16mm @ 150 c/c 24.00 3.80 1.58 431.51 kg
distribution bar 16mm @ 150 c/c 24.00 3.80 1.58 431.51 kg

F3 1 3.960 3.960
main bar 16mm @ 150 c/c 27.00 4.25 1.58 180.99 kg
distribution bar 16mm @ 150 c/c 27.00 4.25 1.58 180.99 kg

F4 6 4.570 4.570
main bar 16mm @ 150 c/c 31.00 4.86 1.58 1425.86 kg
distribution bar 16mm @ 150 c/c 31.00 4.86 1.58 1425.86 kg

F5 2 4.720 4.720
main bar 16mm @ 150 c/c 32.00 5.01 1.58 505.77 kg
distribution bar 16mm @ 150 c/c 32.00 5.01 1.58 505.77 kg

CF1 1 7.000 3.000


main bar 16mm @ 150 c/c 21.00 7.29 1.58 241.51 kg
distribution bar 16mm @ 150 c/c 47.00 3.29 1.58 243.86 kg

Cf2 1 3.000 9.800


main bar 16mm @ 150 c/c 66.00 3.29 1.58 342.44 kg
distribution bar 16mm @ 150 c/c 21.00 10.09 1.58 334.30 kg

CF3 1 5.000 10.000


main bar 16mm @ 150 c/c 67.00 5.29 1.58 559.08 kg
distribution bar 16mm @ 150 c/c 34.00 10.29 1.58 551.97 kg

CF4 1 4.000 10.000


main bar 16mm @ 150 c/c 67.00 4.29 1.58 453.35 kg
distribution bar 16mm @ 150 c/c 27.00 10.29 1.58 438.33 kg

CF5 1 5.000 8.500


main bar 16mm @ 150 c/c 57.00 5.29 1.58 475.63 kg
distribution bar 16mm @ 150 c/c 34.00 8.79 1.58 471.49 kg

CF6 1 5.000 16.000


main bar 16mm @ 150 c/c 107.00 5.29 1.58 892.86 kg
distribution bar 16mm @ 150 c/c 34.00 16.29 1.58 873.88 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
CF7 1 9.000 17.000
main bar 16mm @ 150 c/c 114.00 9.29 1.58 1670.84 kg
distribution bar 16mm @ 150 c/c 61.00 17.29 1.58 1664.11 kg

CF8 1 5.000 17.475


main bar 16mm @ 150 c/c 117.00 5.29 1.58 976.30 kg
distribution bar 16mm @ 150 c/c 34.00 17.76 1.58 953.02 kg

CF9 1 5.000 17.475


main bar 16mm @ 150 c/c 117.00 5.29 1.58 976.30 kg
distribution bar 16mm @ 150 c/c 34.00 17.76 1.58 953.02 kg
sub total 18386.66 kg

B Beam
B-1 lower tie beam 1 376.956
main bar 16mm 8.00 378.84 1.58 4782.53 kg
stirrups 8mm 100 c/c 1885.00 1.54 0.40 1164.18 kg
stirrups 8mm 150 c/c 1257.00 1.54 0.40 776.32 kg

B-2 grid 1-1


upper tie beam 6.406
main bar 20mm 8.00 8.77 2.47 172.94 kg
stirrups 10mm @ 100 c/c 33.00 1.98 0.62 40.25 kg
stirrups 10mm @ 150 c/c 22.00 1.98 0.62 26.83 kg

at lvl 0.0m 13.909


main bar 25mm 4.00 16.86 3.85 259.63 kg
main bar 20mm 4.00 16.27 2.47 160.48 kg
stirrups 10mm @ 100 c/c 70.00 1.98 0.62 85.38 kg
stirrups 10mm @ 150 c/c 47.00 1.98 0.62 57.32 kg

at lvl 3.6m 29.9


main bar 25mm 4.00 32.85 3.85 505.89 kg
main bar 20mm 4.00 32.26 2.47 318.21 kg
extra bar 20mm 2.00 8.20 2.47 40.44 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 182.95 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 121.97 kg

at lvl 7.2m 37.9


main bar 25mm 4.00 40.85 3.85 629.09 kg
main bar 20mm 4.00 40.26 2.47 397.12 kg
extra bar 20mm 2.00 36.82 2.47 181.60 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 182.95 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 121.97 kg

at lvl 10.8m 37.9


main bar 25mm 4.00 40.85 3.85 629.09 kg
main bar 20mm 4.00 40.26 2.47 397.12 kg
extra bar 20mm 2.00 43.11 2.47 212.62 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 182.95 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 121.97 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
at lvl 14.4m 37.9
main bar 25mm 4.00 40.85 3.85 629.09 kg
main bar 20mm 4.00 40.26 2.47 397.12 kg
extra bar 20mm 2.00 43.11 2.47 212.62 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 182.95 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 121.97 kg

at lvl 18.0m 37.9


main bar 25mm 4.00 40.85 3.85 629.09 kg
main bar 20mm 4.00 40.26 2.47 397.12 kg
extra bar 20mm 2.00 43.11 2.47 212.62 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 182.95 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 121.97 kg

at lvl 20.0m 7.4


main bar 25mm 4.00 10.35 3.85 159.39 kg
main bar 20mm 4.00 9.76 2.47 96.27 kg
extra bar 20mm 2.00 8.12 2.47 40.05 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 182.95 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 121.97 kg

B-3 grid 2-2


upper tie beam 6.406
main bar 20mm 8.00 8.77 2.47 311.28 kg
stirrups 10mm @ 100 c/c 33.00 1.98 0.62 72.45 kg
stirrups 10mm @ 150 c/c 22.00 1.98 0.62 48.30 kg

at lvl 0.0m 13.909


main bar 25mm 4.00 16.86 3.85 415.41 kg
main bar 20mm 4.00 16.27 2.47 256.76 kg
stirrups 10mm @ 100 c/c 70.00 1.98 0.62 136.60 kg
stirrups 10mm @ 150 c/c 47.00 1.98 0.62 91.72 kg

at lvl 3.6m 29.9


main bar 25mm 4.00 32.85 3.85 505.89 kg
main bar 20mm 4.00 32.26 2.47 318.21 kg
extra bar 20mm 2.00 8.20 2.47 40.44 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 182.95 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 121.97 kg

at lvl 7.2m 37.9


main bar 25mm 4.00 40.85 3.85 754.91 kg
main bar 20mm 4.00 40.26 2.47 476.55 kg
extra bar 20mm 2.00 36.82 2.47 217.92 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 219.54 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 146.36 kg

at lvl 10.8m 37.9


main bar 25mm 4.00 40.85 3.85 754.91 kg
main bar 20mm 4.00 40.26 2.47 476.55 kg
extra bar 20mm 2.00 43.11 2.47 255.14 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 219.54 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 146.36 kg

at lvl 14.4m 37.9


main bar 25mm 4.00 40.85 3.85 754.91 kg
main bar 20mm 4.00 40.26 2.47 476.55 kg
extra bar 20mm 2.00 43.11 2.47 255.14 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 219.54 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 146.36 kg

at lvl 18.0m 37.9


main bar 25mm 4.00 40.85 3.85 754.91 kg
main bar 20mm 4.00 40.26 2.47 476.55 kg
extra bar 20mm 2.00 43.11 2.47 255.14 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 219.54 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 146.36 kg

at lvl 20.0m 7.4


main bar 25mm 4.00 10.35 3.85 302.84 kg
main bar 20mm 4.00 9.76 2.47 182.92 kg
extra bar 20mm 2.00 8.12 2.47 76.09 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 347.61 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 231.74 kg

B-4 grid 3-3


upper tie beam 6.406
main bar 20mm 8.00 8.77 2.47 311.28 kg
stirrups 10mm @ 100 c/c 33.00 1.98 0.62 72.45 kg
stirrups 10mm @ 150 c/c 22.00 1.98 0.62 48.30 kg

at lvl 0.0m 13.909


main bar 25mm 4.00 16.86 3.85 415.41 kg
main bar 20mm 4.00 16.27 2.47 256.76 kg
stirrups 10mm @ 100 c/c 70.00 1.98 0.62 136.60 kg
stirrups 10mm @ 150 c/c 47.00 1.98 0.62 91.72 kg

at lvl 3.6m 29.9


main bar 25mm 4.00 32.85 3.85 505.89 kg
main bar 20mm 4.00 32.26 2.47 318.21 kg
extra bar 20mm 2.00 8.20 2.47 40.44 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 182.95 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 121.97 kg

at lvl 7.2m 37.9


main bar 25mm 4.00 40.85 3.85 754.91 kg
main bar 20mm 4.00 40.26 2.47 476.55 kg
extra bar 20mm 2.00 36.82 2.47 217.92 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 219.54 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 146.36 kg

at lvl 10.8m 37.9


main bar 25mm 4.00 40.85 3.85 754.91 kg
main bar 20mm 4.00 40.26 2.47 476.55 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
extra bar 20mm 2.00 43.11 2.47 255.14 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 219.54 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 146.36 kg

at lvl 14.4m 37.9


main bar 25mm 4.00 40.85 3.85 754.91 kg
main bar 20mm 4.00 40.26 2.47 476.55 kg
extra bar 20mm 2.00 43.11 2.47 255.14 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 219.54 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 146.36 kg

at lvl 18.0m 37.9


main bar 25mm 4.00 40.85 3.85 754.91 kg
main bar 20mm 4.00 40.26 2.47 476.55 kg
extra bar 20mm 2.00 43.11 2.47 255.14 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 219.54 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 146.36 kg

B-5 grid 4-4


upper tie beam 6.406
main bar 20mm 8.00 8.77 2.47 224.82 kg
stirrups 10mm @ 100 c/c 33.00 1.98 0.62 72.45 kg
stirrups 10mm @ 150 c/c 22.00 1.98 0.62 48.30 kg

at lvl 0.0m 13.909


main bar 25mm 4.00 16.86 3.85 337.52 kg
main bar 20mm 4.00 16.27 2.47 208.62 kg
stirrups 10mm @ 100 c/c 70.00 1.98 0.62 110.99 kg
stirrups 10mm @ 150 c/c 47.00 1.98 0.62 74.52 kg

at lvl 3.6m 29.9


main bar 25mm 4.00 32.85 3.85 505.89 kg
main bar 20mm 4.00 32.26 2.47 318.21 kg
extra bar 20mm 2.00 8.20 2.47 40.44 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 182.95 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 121.97 kg

at lvl 7.2m 37.9


main bar 25mm 4.00 40.85 3.85 503.27 kg
main bar 20mm 4.00 40.26 2.47 317.70 kg
extra bar 20mm 2.00 36.82 2.47 145.28 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 146.36 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 97.57 kg

at lvl 10.8m 37.9


main bar 25mm 4.00 40.85 3.85 471.82 kg
main bar 20mm 4.00 40.26 2.47 297.84 kg
extra bar 20mm 2.00 43.11 2.47 159.46 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 137.21 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 91.48 kg

at lvl 14.4m 37.9

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
main bar 25mm 4.00 40.85 3.85 471.82 kg
main bar 20mm 4.00 40.26 2.47 297.84 kg
extra bar 20mm 2.00 43.11 2.47 159.46 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 137.21 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 91.48 kg

at lvl 18.0m 37.9


main bar 25mm 4.00 40.85 3.85 471.82 kg
main bar 20mm 4.00 40.26 2.47 297.84 kg
extra bar 20mm 2.00 43.11 2.47 159.46 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 137.21 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 91.48 kg

at lvl 20.0m 7.4


main bar 25mm 4.00 10.35 3.85 95.63 kg
main bar 20mm 4.00 9.76 2.47 57.76 kg
extra bar 20mm 2.00 8.12 2.47 24.03 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 109.77 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 73.18 kg

B-5 grid 4-4


upper tie beam 6.406
main bar 20mm 8.00 8.77 2.47 224.82 kg
stirrups 10mm @ 100 c/c 33.00 1.98 0.62 72.45 kg
stirrups 10mm @ 150 c/c 22.00 1.98 0.62 48.30 kg

at lvl 0.0m 13.909


main bar 25mm 4.00 16.86 3.85 388.14 kg
main bar 20mm 4.00 16.27 2.47 239.91 kg
stirrups 10mm @ 100 c/c 70.00 1.98 0.62 127.64 kg
stirrups 10mm @ 150 c/c 47.00 1.98 0.62 85.70 kg

at lvl 3.6m 29.9


main bar 25mm 4.00 32.85 3.85 581.77 kg
main bar 20mm 4.00 32.26 2.47 365.94 kg
extra bar 20mm 2.00 8.20 2.47 46.51 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 210.39 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 140.26 kg

at lvl 7.2m 37.9


main bar 25mm 4.00 40.85 3.85 593.86 kg
main bar 20mm 4.00 40.26 2.47 374.89 kg
extra bar 20mm 2.00 36.82 2.47 171.43 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 172.71 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 115.14 kg

at lvl 10.8m 37.9


main bar 25mm 4.00 40.85 3.85 684.14 kg
main bar 20mm 4.00 40.26 2.47 431.87 kg
extra bar 20mm 2.00 43.11 2.47 231.22 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 198.96 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 132.64 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks

at lvl 14.4m 37.9


main bar 25mm 4.00 40.85 3.85 684.14 kg
main bar 20mm 4.00 40.26 2.47 431.87 kg
extra bar 20mm 2.00 43.11 2.47 231.22 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 198.96 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 132.64 kg

at lvl 18.0m 37.9


main bar 25mm 4.00 40.85 3.85 566.18 kg
main bar 20mm 4.00 40.26 2.47 357.41 kg
extra bar 20mm 2.00 43.11 2.47 191.36 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 164.66 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 109.77 kg

at lvl 20.0m 7.4


main bar 25mm 4.00 10.35 3.85 95.63 kg
main bar 20mm 4.00 9.76 2.47 57.76 kg
extra bar 20mm 2.00 8.12 2.47 24.03 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 109.77 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 73.18 kg

B-6 grid A-A


upper tie beam 6.406
main bar 20mm 8.00 8.77 2.47 172.94 kg
stirrups 10mm @ 100 c/c 33.00 1.98 0.62 40.25 kg
stirrups 10mm @ 150 c/c 22.00 1.98 0.62 26.83 kg

at lvl 0.0m 37.721


main bar 20mm 8.00 40.08 2.47 790.72 kg
extra bar 20mm 2.00 31.86 2.47 157.13 kg
stirrups 10mm @ 100 c/c 189.00 1.98 0.62 230.52 kg
stirrups 10mm @ 150 c/c 126.00 1.98 0.62 153.68 kg

at lvl 3.6m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 7.2m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 10.8m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 14.4m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 18.0m 35.717


main bar 25mm 4.00 38.67 3.85 595.47 kg
main bar 20mm 4.00 38.08 2.47 375.59 kg
extra bar 20mm 2.00 35.85 2.47 176.79 kg
stirrups 10mm @ 100 c/c 179.00 1.98 0.62 218.32 kg
stirrups 10mm @ 150 c/c 120.00 1.98 0.62 146.36 kg

B-7 grid B-B


upper tie beam 45.722
main bar 20mm 8.00 48.08 2.47 948.56 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 0.0m 45.722


main bar 20mm 8.00 48.08 2.47 948.56 kg
extra bar 20mm 2.00 31.86 2.47 157.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 3.6m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 7.2m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 10.8m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 14.4m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 18.0m 35.717


main bar 25mm 4.00 38.67 3.85 595.47 kg
main bar 20mm 4.00 38.08 2.47 375.59 kg
extra bar 20mm 2.00 35.85 2.47 176.79 kg
stirrups 10mm @ 100 c/c 179.00 1.98 0.62 218.32 kg
stirrups 10mm @ 150 c/c 120.00 1.98 0.62 146.36 kg

at lvl 20.0m 7.907


main bar 25mm 4.00 10.86 3.85 167.20 kg
main bar 20mm 4.00 10.27 2.47 101.27 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 182.95 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 121.97 kg

B-8 grid C-C


upper tie beam 45.722
main bar 20mm 8.00 48.08 2.47 948.56 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 0.0m 45.722


main bar 20mm 8.00 48.08 2.47 948.56 kg
extra bar 20mm 2.00 31.86 2.47 157.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 3.6m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 7.2m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 10.8m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 14.4m 45.722

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 18.0m 35.717


main bar 25mm 4.00 38.67 3.85 595.47 kg
main bar 20mm 4.00 38.08 2.47 375.59 kg
extra bar 20mm 2.00 35.85 2.47 176.79 kg
stirrups 10mm @ 100 c/c 179.00 1.98 0.62 218.32 kg
stirrups 10mm @ 150 c/c 120.00 1.98 0.62 146.36 kg

at lvl 20.0m 7.907


main bar 25mm 4.00 10.86 3.85 217.36 kg
main bar 20mm 4.00 10.27 2.47 131.66 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 237.84 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 158.56 kg

B-9 grid D-D


upper tie beam 45.722
main bar 20mm 8.00 48.08 2.47 806.28 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 237.41 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 158.62 kg

at lvl 0.0m 45.722


main bar 20mm 8.00 48.08 2.47 948.56 kg
extra bar 20mm 2.00 31.86 2.47 157.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 3.6m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 7.2m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 10.8m 45.722


main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
at lvl 14.4m 45.722
main bar 25mm 4.00 48.67 3.85 749.55 kg
main bar 20mm 4.00 48.08 2.47 474.28 kg
extra bar 20mm 2.00 45.85 2.47 226.13 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 279.31 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 186.61 kg

at lvl 18.0m 35.717


main bar 25mm 4.00 38.67 3.85 595.47 kg
main bar 20mm 4.00 38.08 2.47 375.59 kg
extra bar 20mm 2.00 35.85 2.47 176.79 kg
stirrups 10mm @ 100 c/c 179.00 1.98 0.62 218.32 kg
stirrups 10mm @ 150 c/c 120.00 1.98 0.62 146.36 kg

at lvl 20.0m 7.907


main bar 25mm 4.00 10.86 3.85 217.36 kg
main bar 20mm 4.00 10.27 2.47 131.66 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 237.84 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 158.56 kg

B-10 grid E-E


upper tie beam 45.722
main bar 20mm 8.00 48.08 2.47 362.82 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 106.83 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 71.38 kg

at lvl 0.0m 45.722


main bar 20mm 8.00 48.08 2.47 853.71 kg
extra bar 20mm 2.00 31.86 2.47 141.42 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 251.38 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 167.95 kg

at lvl 3.6m 45.722


main bar 25mm 4.00 48.67 3.85 674.59 kg
main bar 20mm 4.00 48.08 2.47 426.85 kg
extra bar 20mm 2.00 45.85 2.47 203.52 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 251.38 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 167.95 kg

at lvl 7.2m 45.722


main bar 25mm 4.00 48.67 3.85 562.16 kg
main bar 20mm 4.00 48.08 2.47 355.71 kg
extra bar 20mm 2.00 45.85 2.47 169.60 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 209.48 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 139.96 kg

at lvl 10.8m 45.722


main bar 25mm 4.00 48.67 3.85 562.16 kg
main bar 20mm 4.00 48.08 2.47 355.71 kg
extra bar 20mm 2.00 45.85 2.47 169.60 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 209.48 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 139.96 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks

at lvl 14.4m 45.722


main bar 25mm 4.00 48.67 3.85 562.16 kg
main bar 20mm 4.00 48.08 2.47 355.71 kg
extra bar 20mm 2.00 45.85 2.47 169.60 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 209.48 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 139.96 kg

at lvl 18.0m 35.717


main bar 25mm 4.00 38.67 3.85 446.60 kg
main bar 20mm 4.00 38.08 2.47 281.69 kg
extra bar 20mm 2.00 35.85 2.47 132.59 kg
stirrups 10mm @ 100 c/c 179.00 1.98 0.62 163.74 kg
stirrups 10mm @ 150 c/c 120.00 1.98 0.62 109.77 kg

at lvl 20.0m 7.907


main bar 25mm 4.00 10.86 3.85 217.36 kg
main bar 20mm 4.00 10.27 2.47 131.66 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 237.84 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 158.56 kg

B-11 grid F-F


upper tie beam 45.722
main bar 20mm 8.00 48.08 2.47 362.82 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 106.83 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 71.38 kg

at lvl 0.0m 45.722


main bar 20mm 8.00 48.08 2.47 853.71 kg
extra bar 20mm 2.00 31.86 2.47 141.42 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 251.38 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 167.95 kg

at lvl 3.6m 45.722


main bar 25mm 4.00 48.67 3.85 674.59 kg
main bar 20mm 4.00 48.08 2.47 426.85 kg
extra bar 20mm 2.00 45.85 2.47 203.52 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 251.38 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 167.95 kg

at lvl 7.2m 45.722


main bar 25mm 4.00 48.67 3.85 562.16 kg
main bar 20mm 4.00 48.08 2.47 355.71 kg
extra bar 20mm 2.00 45.85 2.47 169.60 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 209.48 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 139.96 kg

at lvl 10.8m 45.722


main bar 25mm 4.00 48.67 3.85 562.16 kg
main bar 20mm 4.00 48.08 2.47 355.71 kg
extra bar 20mm 2.00 45.85 2.47 169.60 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 209.48 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 139.96 kg

at lvl 14.4m 45.722


main bar 25mm 4.00 48.67 3.85 562.16 kg
main bar 20mm 4.00 48.08 2.47 355.71 kg
extra bar 20mm 2.00 45.85 2.47 169.60 kg
stirrups 10mm @ 100 c/c 229.00 1.98 0.62 209.48 kg
stirrups 10mm @ 150 c/c 153.00 1.98 0.62 139.96 kg

at lvl 18.0m 35.717


main bar 25mm 4.00 38.67 3.85 446.60 kg
main bar 20mm 4.00 38.08 2.47 281.69 kg
extra bar 20mm 2.00 35.85 2.47 132.59 kg
stirrups 10mm @ 100 c/c 179.00 1.98 0.62 163.74 kg
stirrups 10mm @ 150 c/c 120.00 1.98 0.62 109.77 kg

at lvl 20.0m 7.907


main bar 25mm 4.00 10.86 3.85 217.36 kg
main bar 20mm 4.00 10.27 2.47 131.66 kg
stirrups 10mm @ 100 c/c 150.00 1.98 0.62 237.84 kg
stirrups 10mm @ 150 c/c 100.00 1.98 0.62 158.56 kg
sub total 121515.91 kg

C Column
C-1 upto plinth lvl
c1 3.00 2.26
main bar 25mm 126.00 3.76 3.85 1823.98 kg
main bar 20mm 54.00 3.46 2.46 459.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c2 10.00 2.26
main bar 25mm 126.00 3.76 3.85 1823.98 kg
main bar 20mm 54.00 3.46 2.46 459.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c3 16.00 2.26
main bar 25mm 126.00 3.76 3.85 1823.98 kg
main bar 20mm 54.00 3.46 2.46 459.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c4 2.00 2.26
main bar 25mm 126.00 3.76 3.85 1823.98 kg
main bar 20mm 54.00 3.46 2.46 459.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c5 8.00 2.26
main bar 25mm 126.00 3.76 3.85 1823.98 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
main bar 20mm 54.00 3.46 2.46 459.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c6 4.00 2.26
main bar 25mm 126.00 3.76 3.85 1823.98 kg
main bar 20mm 54.00 3.46 2.46 459.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

C-2 upto second floor 5.00


c1 3.00 3.60
main bar 25mm 126.00 5.10 3.85 2474.01 kg
main bar 20mm 54.00 4.80 2.46 637.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c2 10.00 3.60
main bar 25mm 126.00 5.10 3.85 2474.01 kg
main bar 20mm 54.00 4.80 2.46 637.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c3 16.00 3.60
main bar 25mm 126.00 5.10 3.85 2474.01 kg
main bar 20mm 54.00 4.80 2.46 637.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c4 2.00 3.60
main bar 25mm 126.00 5.10 3.85 2474.01 kg
main bar 20mm 54.00 4.80 2.46 637.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c5 8.00 3.60
main bar 25mm 126.00 5.10 3.85 2474.01 kg
main bar 20mm 54.00 4.80 2.46 637.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c6 4.00 3.60
main bar 25mm 126.00 5.10 3.85 2474.01 kg
main bar 20mm 54.00 4.80 2.46 637.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

C-2 upto top floor 5.00


c1 3.00 4.00
main bar 25mm 126.00 5.50 3.85 2668.05 kg
main bar 20mm 54.00 5.20 2.46 690.77 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c2 10.00 4.00
main bar 25mm 126.00 5.50 3.85 2668.05 kg
main bar 20mm 54.00 5.20 2.46 690.77 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c3 16.00 4.00
main bar 25mm 126.00 5.50 3.85 2668.05 kg
main bar 20mm 54.00 5.20 2.46 690.77 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c4 2.00 4.00
main bar 25mm 126.00 5.50 3.85 2668.05 kg
main bar 20mm 54.00 5.20 2.46 690.77 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c5 8.00 4.00
main bar 25mm 126.00 5.50 3.85 2668.05 kg
main bar 20mm 54.00 5.20 2.46 690.77 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg

c6 4.00 4.00
main bar 25mm 126.00 5.50 3.85 2668.05 kg
main bar 20mm 54.00 5.20 2.46 690.77 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
sub total 53396.73 kg

D Slab
second basement
bottom bar
x-axis
bottom 10mm @ 150 c/c 160.00 49.19 0.62 4847.97 kg
top 10mm @ 150 c/c 160.00 31.80 0.62 3134.21 kg

y axis
bottom 10mm @ 150 c/c 160.00 43.15 0.62 4252.47 kg
top 10mm @ 150 c/c 160.00 28.55 0.62 2813.79 kg

first basement
bottom bar
x-axis
bottom 10mm @ 150 c/c 213.00 49.19 0.62 6453.86 kg
top 10mm @ 150 c/c 213.00 31.80 0.62 4172.41 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
y axis
bottom 10mm @ 150 c/c 213.00 43.15 0.62 5661.10 kg
top 10mm @ 150 c/c 213.00 28.55 0.62 3745.86 kg

floor area
bottom bar
x-axis
bottom 10mm @ 150 c/c 58.00 49.19 0.62 1757.39 kg
top 10mm @ 150 c/c 58.00 31.80 0.62 1136.15 kg

y axis
bottom 10mm @ 150 c/c 58.00 43.15 0.62 1541.52 kg
top 10mm @ 150 c/c 58.00 28.55 0.62 1020.00 kg

ground,first,second floor 3.00


bottom bar
x-axis
bottom 10mm @ 150 c/c 493.00 49.19 0.62 44813.42 kg
top 10mm @ 150 c/c 493.00 31.80 0.62 28971.84 kg

y axis
bottom 10mm @ 150 c/c 493.00 43.15 0.62 39308.77 kg
top 10mm @ 150 c/c 493.00 28.55 0.62 26009.97 kg

top floor
bottom bar
x-axis
bottom 10mm @ 150 c/c 245.00 49.19 0.62 7423.45 kg
top 10mm @ 150 c/c 245.00 31.80 0.62 4799.26 kg

y axis
bottom 10mm @ 150 c/c 245.00 43.15 0.62 6511.59 kg
top 10mm @ 150 c/c 245.00 28.55 0.62 4308.62 kg
sub total 202683.63 kg

E Shear wall
wall 1 1.00 6.40
main bar 16mm @ 125 c/c 94.00 5.70 1.58 846.56 kg
distribution bar 10mm @ 150 c/c 78.00 6.40 0.62 309.50 kg

wall 2 1.00 4.21


main bar 16mm @ 125 c/c 68.00 5.70 1.58 612.41 kg
distribution bar 10mm @ 150 c/c 78.00 4.21 0.62 203.60 kg

wall 3 2.00 7.40


main bar 16mm @ 125 c/c 120.00 5.70 1.58 2161.44 kg
distribution bar 10mm @ 150 c/c 78.00 7.40 0.62 715.73 kg

wall 4 1.00 7.90


main bar 16mm @ 125 c/c 128.00 5.70 1.58 1152.77 kg
distribution bar 10mm @ 150 c/c 78.00 7.90 0.62 382.04 kg

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
sub total 6384.05 kg

F Staircase 16.00
main bottom bar 16mm @ 125 c/c 34.00 9.65 1.58 8283.87 kg
main top bar 16mm @ 300 c/c 14.00 13.42 1.58 4743.95 kg
distribution bar 12mm @ 125 c/c 132.00 1.80 0.88 3345.41 kg

nosing
main bar 10mm @ 150 c/c 364.00 2.67 0.62 9593.20 kg
distribution bar 10mm 26.00 2.00 0.62 512.51 kg
Landing
12mm Top+Bottom bar @ 125 c/c 68.00 4.26 0.88 4077.74 kg
sub total 30556.67 kg
Total 432.924 MT

Formwork, shuttering, centering


with approved materials for all
works necessary propping,
scaffolding, staging, supporting
inclusive of wedging and cutting
holes for utilization till the support
7 if fully unyielding nett.
Column Foundation
Footing Base F1 42 1.875 4.000 0.200 63.000
Column upto +14.4 0.000
From 2nd Basement 0.000
Along Grid B-C 14 0.600 4.000 19.520 655.872
Along Grid A 6 0.600 4.000 19.520 281.088
From 1st Basement 0.000
Along Grid A 1 0.600 4.000 15.470 37.128
Along D 6 0.600 4.000 15.470 222.768
Along E 3 0.600 4.000 15.470 111.384
From Ground Floor 0.000
Along D 1 0.600 4.000 11.870 28.488
Along E 4 0.600 4.000 11.870 113.952
Along F 4 0.600 4.000 11.870 113.952
From First Floor 0.000
Along F 3 0.600 4.000 8.270 59.544
Upto +20.00 0.000
From 2nd Basement 0.000
Along Grid A-F 30 0.600 4.000 5.600 403.200
lower beam 0.000
2nd Basement 0.000
Along A 1 33.900 2.000 0.300 20.340
Along Grid B-C 2 41.300 2.000 0.300 49.560
Along 1 1 6.400 2.000 0.300 3.840
Along 2- 7 6 13.300 2.000 0.300 47.880
1st Basement 2.000 0.300 0.000
Along D 1 33.900 2.000 0.300 20.340
Along E 1 15.900 2.000 0.300 9.540
Along 1 1 6.900 2.000 0.300 4.140

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Along 2-4 3 9.150 2.000 0.300 16.470
Along 4-7 3 14.800 2.000 0.300 26.640
Ground Floor 2.000 0.300 0.000
Along D 1 7.400 2.000 0.300 4.440
Along E 1 25.400 2.000 0.300 15.240
Along F 1 18.000 2.000 0.300 10.800
Along 1 1 14.800 2.000 0.300 8.880
Along 2 -3 2 7.400 2.000 0.300 8.880
Along 4 1 14.800 2.000 0.300 8.880
Along 5-7 3 7.400 2.000 0.300 13.320
First Floor 2.000 0.300 0.000
Along F 1 25.400 2.000 0.300 15.240
Along Grid 1,2,3 3 7.400 2.000 0.300 13.320
Tie Beam 2.000 0.000
2nd Basement 2.000 0.000
Along A 1 33.900 2.000 0.450 30.510
Along Grid B-C 2 41.300 2.000 0.450 74.340
Along 1 1 6.400 2.000 0.450 5.760
Along 2- 7 6 13.300 2.000 0.450 71.820
1st Basement 2.000 0.000
Along D 1 33.900 2.000 0.450 30.510
Along E 1 15.900 2.000 0.450 14.310
Along 1 1 6.900 2.000 0.450 6.210
Along 2-4 3 9.150 2.000 0.450 24.705
Along 4-7 3 14.800 2.000 0.450 39.960
Ground Floor 2.000 0.000
Along D 1 7.400 2.000 0.450 6.660
Along E 1 25.400 2.000 0.450 22.860
Along F 1 18.000 2.000 0.450 16.200
Along 1 1 14.800 2.000 0.450 13.320
Along 2 -3 2 7.400 2.000 0.450 13.320
Along 4 1 14.800 2.000 0.450 13.320
Along 5-7 3 7.400 2.000 0.450 19.980
First Floor 2.000 0.000
Along F 1 25.400 2.000 0.450 22.860
Along Grid 1,2,3 3 7.400 2.000 0.450 19.980
Beam +3.6 level
Along A -D 4 14.700 0.350 0.550 85.260
2nd Basement 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
Beam +3.6 level 0.000
2nd Basement 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.550 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005
Along 2-4 3 9.150 0.350 0.550 39.803

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Along 4-7 3 14.800 0.350 0.550 64.380
Beam +7.2 level 0.350 0.550 0.000
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005
Along 2-4 3 9.150 0.350 0.550 39.803
Along 4-7 3 14.800 0.350 0.550 64.380
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 10.730
Along E 1 25.400 0.350 0.550 36.830
Along F 1 18.000 0.350 0.550 26.100
Along 1 1 14.800 0.350 0.550 21.460
Along 2 -3 2 7.400 0.350 0.550 21.460
Along 4 1 14.800 0.350 0.550 21.460
Along 5-7 3 7.400 0.350 0.550 32.190
Beam +10.8 level 0.350 0.550 0.000
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.350 0.550 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005
Along 2-4 3 9.150 0.350 0.550 39.803
Along 4-7 3 14.800 0.350 0.550 64.380
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 10.730
Along E 1 25.400 0.350 0.550 36.830
Along F 1 18.000 0.350 0.550 26.100
Along 1 1 14.800 0.350 0.550 21.460
Along 2 -3 2 7.400 0.350 0.550 21.460
Along 4 1 14.800 0.350 0.550 21.460
Along 5-7 3 7.400 0.350 0.550 32.190
First Floor 0.350 0.550 0.000
Along F 1 25.400 0.350 0.550 36.830
Along Grid 1,2,3 3 7.400 0.350 0.550 32.190
Beam +14.4 level 0.000
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.350 0.550 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Along 2-4 3 9.150 0.350 0.550 39.803
Along 4-7 3 14.800 0.350 0.550 64.380
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 10.730
Along E 1 25.400 0.350 0.550 36.830
Along F 1 18.000 0.350 0.550 26.100
Along 1 1 14.800 0.350 0.550 21.460
Along 2 -3 2 7.400 0.350 0.550 21.460
Along 4 1 14.800 0.350 0.550 21.460
Along 5-7 3 7.400 0.350 0.550 32.190
First Floor 0.350 0.550 0.000
Along F 1 25.400 0.350 0.550 36.830
Along Grid 1,2,3 3 7.400 0.350 0.550 32.190
Beam +18.05 level 0.000
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.350 0.550 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005
Along 2-4 3 9.150 0.350 0.550 39.803
Along 4-7 3 14.800 0.350 0.550 64.380
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 10.730
Along E 1 25.400 0.350 0.550 36.830
Along F 1 18.000 0.350 0.550 26.100
Along 1 1 14.800 0.350 0.550 21.460
Along 2 -3 2 7.400 0.350 0.550 21.460
Along 4 1 14.800 0.350 0.550 21.460
Along 5-7 3 7.400 0.350 0.550 32.190
First Floor 0.350 0.550 0.000
Along F 1 25.400 0.350 0.550 36.830
Along Grid 1,2,3 3 7.400 0.350 0.550 32.190
shear wall
Along Grid C 1 41.300 2.000 3.600 297.360
Slab
1st Basement 1 639.400 639.400
Beam +3.6 level 1 1165.800 1165.800
Beam +7.2 level 1 1764.700 1764.700
Beam +10.8 level 1 2009.100 2009.100
Beam +14.4 level 1 2009.100 2009.100
Beam +18.05 level 1 1473.500 1473.500
Total 15862.429 Sqm
8 Backfilling
Earthwork Excavation 1 909.32 909.32
Brick Soling -1 143.84 -143.84
75mm P.C.C (1:2:4) -1 196.15 -196.15
Dwarf wall -1 122.13 -122.13
R.C.C (1:1.5:3) -1 98.42 -98.42
Earthwork to be back fill Total 348.78 Cum
Earthwork to be fill in rooms 1 2009.100 0.3 602.73

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Total Earthwork Needed Total 951.51
Earthwork left after excavated 80% 727.45

10 Superstructure wall
GF
External wall
Along A 1 10.400 0.230 3.600 77.272
Along J 1 25.810 0.230 3.600 191.768
Along 1 1 9.600 0.230 3.600 71.328
Along 2 1 49.570 0.230 3.600 368.305
Along 6 1 29.550 0.230 3.600 219.557
Partition wall
between C-D 1 16.300 0.110 2.400 80.033
Along E & G 2 23.100 0.110 2.400 226.842
Along H & I 2 25.810 0.110 2.400 253.454
Along 4 & 5 2 49.570 0.110 2.400 486.777
1 18.900 0.110 2.400 92.799
1 19.200 0.110 2.400 94.272
1 13.100 0.110 2.400 64.321
1 22.940 0.110 2.400 112.635
1 13.916 0.110 2.400 68.328
1 16.950 0.110 2.400 83.225
1 10.570 0.110 2.400 51.899
FF
External wall
Along A 1 10.400 0.230 3.600 77.272
Along J 1 25.810 0.230 3.600 191.768
Along 1 1 9.600 0.230 3.600 71.328
Along 2 1 49.570 0.230 3.600 368.305
Along 6 1 29.550 0.230 3.600 219.557
Partition wall
Along B-G 5 7.800 0.110 2.400 191.490
Along H 1 12.500 0.110 2.400 61.375
Along I & I' 2 25.810 0.110 2.400 253.454
Along 3 1 49.570 0.110 2.400 243.389
Along 3' 1 49.570 0.110 3.600 362.357
Along 4 1 11.400 0.110 3.600 83.334
Along 5 1 22.500 0.110 3.600 164.475
Along 5' 1 5.900 0.110 3.600 43.129
1 13.100 0.110 2.400 64.321
1 22.940 0.110 2.400 112.635
SF
External wall
Along A 1 10.400 0.230 3.600 77.272
Along J 1 25.810 0.230 3.600 191.768
Along 1 1 9.600 0.230 3.600 71.328
Along 2 1 49.570 0.230 3.600 368.305
Along 6 1 29.550 0.230 3.600 219.557
Partition wall
Along B-G 5 7.800 0.110 2.400 191.490
Along H 1 12.500 0.110 2.400 61.375
Along I & I' 2 25.810 0.110 2.400 253.454
Along 3 1 49.570 0.110 2.400 243.389
Along 3' 1 49.570 0.110 3.600 362.357

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Along 4 1 11.400 0.110 3.600 83.334
Along 5 1 22.500 0.110 3.600 164.475
Along 5' 1 5.900 0.110 3.600 43.129
1 13.100 0.110 2.400 64.321
1 22.940 0.110 2.400 112.635
THF
External wall
Along A 1 10.400 0.230 3.600 77.272
Along J 1 25.810 0.230 3.600 191.768
Along 1 1 9.600 0.230 3.600 71.328
Along 2 1 49.570 0.230 3.600 368.305
Along 6 1 29.550 0.230 3.600 219.557
Partition wall
Along B-G 5 7.800 0.110 2.400 191.490
Along H 1 12.500 0.110 2.400 61.375
Along I & I' 2 25.810 0.110 2.400 253.454
Along 3 1 49.570 0.110 2.400 243.389
Along 3' 1 49.570 0.110 3.600 362.357
Along 4 1 11.400 0.110 3.600 83.334
Along 5 1 22.500 0.110 3.600 164.475
Along 5' 1 5.900 0.110 3.600 43.129
1 13.100 0.110 2.400 64.321
1 22.940 0.110 2.400 112.635
TF
External wall
Along E & G 2 23.100 0.230 3.600 343.266
Along 2 & 6 2 11.420 0.230 3.600 169.701
Partition wall
Along F 2 11.700 0.110 2.400 114.894
Along 3-5 3 11.420 0.110 2.400 168.217
between 5-6 1 6.200 0.110 2.400 30.442
between E-F 1 14.000 0.110 2.400 68.740
WIND WALL
20 1.225 0.230 18.050 890.085
10 2.000 0.110 18.050 724.200
Opening deductions
D1 18 0.75 0.23 2.4 -7.452
D2 103 0.9 0.23 2.4 -51.170
D3 104 1.2 0.23 2.4 -68.890
SD1 34 2.1 0.23 2.4 -39.413
SD2 4 2.7 0.23 2.4 -5.962
SD3 10 2.4 0.23 2.4 -13.248
SD4 5 4 0.23 2.4 -11.040
SD5 5 1.6 0.23 2.4 -4.416
SD6 1 2.65 0.23 2.55 -1.554
SD7 1 3 0.23 2.55 -1.760
W1 3 2.65 0.23 2.05 -3.748
W2 5 3.3 0.23 1.3 -4.934
W3 3 2.65 0.23 2.55 -4.663
W4 1 3 0.23 2.4 -1.656
W5 1 2.4 0.23 1.5 -0.828
W6 4 7.4 0.23 2.55 -17.360
W7 31 0.75 0.23 1.3 -6.952
W8 5 2.8 0.23 2.4 -7.728

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
W9 3 2.66 0.23 2.05 -3.763
W10 3 4.8 0.23 2.4 -7.949
W11 2 4.8 0.23 1.8 -3.974
CW1 3 2.8 0.23 1.5 -2.898
Total 13536.126 Cum

14 False Ceiling
Slab
Beam +3.6 level 1 1165.800 1165.800
Beam +7.2 level 1 1764.700 1764.700
Beam +10.8 level 1 2009.100 2009.100
Beam +14.4 level 1 2009.100 2009.100
Beam +18.05 level 1 1473.500 1473.500
8422.200 Sqm
15 Plaster
In structure part
Column Foundation
Column upto +14.4
From 2nd Basement
Along Grid B-C 14 0.600 0.600 18.450 5.040
Along Grid A 6 0.600 0.600 18.450 2.160
From 1st Basement
Along Grid A 1 0.600 0.600 14.400 0.360
Along D 6 0.600 0.600 14.400 2.160
Along E 3 0.600 0.600 14.400 1.080
From Ground Floor
Along D 1 0.600 0.600 10.800 0.360
Along E 4 0.600 0.600 10.800 1.440
Along F 4 0.600 0.600 10.800 1.440
From First Floor
Along F 3 0.600 0.600 7.200 1.080
Upto +20.00
From 2nd Basement
Along Grid A-F 30 0.600 0.600 4.530 10.800
Tie Beam 0.000
2nd Basement 0.000
Along A 1 33.900 1.000 0.450 15.255
Along Grid B-C 2 41.300 1.000 0.450 37.170
Along 1 1 6.400 1.000 0.450 2.880
Along 2- 7 6 13.300 1.000 0.450 35.910
1st Basement 0.000
Along D 1 33.900 1.000 0.450 15.255
Along E 1 15.900 1.000 0.450 7.155
Along 1 1 6.900 1.000 0.450 3.105
Along 2-4 3 9.150 1.000 0.450 12.353
Along 4-7 3 14.800 1.000 0.450 19.980
Ground Floor 0.000
Along D 1 7.400 1.000 0.450 3.330
Along E 1 25.400 1.000 0.450 11.430
Along F 1 18.000 1.000 0.450 8.100
Along 1 1 14.800 1.000 0.450 6.660
Along 2 -3 2 7.400 1.000 0.450 6.660
Along 4 1 14.800 1.000 0.450 6.660
Along 5-7 3 7.400 1.000 0.450 9.990

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
First Floor 0.000
Along F 1 25.400 1.000 0.450 11.430
Along Grid 1,2,3 3 7.400 1.000 0.450 9.990
Beam 0level
Along A -D 4 14.700 0.350 0.550 85.260
2nd Basement 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
Beam +3.6 level 0.000
2nd Basement 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.550 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005
Along 2-4 3 9.150 0.350 0.550 39.803
Along 4-7 3 14.800 0.350 0.550 64.380
Beam +7.2 level 0.350 0.550 0.000
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005
Along 2-4 3 9.150 0.350 0.550 39.803
Along 4-7 3 14.800 0.350 0.550 64.380
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 10.730
Along E 1 25.400 0.350 0.550 36.830
Along F 1 18.000 0.350 0.550 26.100
Along 1 1 14.800 0.350 0.550 21.460
Along 2 -3 2 7.400 0.350 0.550 21.460
Along 4 1 14.800 0.350 0.550 21.460
Along 5-7 3 7.400 0.350 0.550 32.190
Beam +10.8 level 0.350 0.550 0.000
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.350 0.550 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005
Along 2-4 3 9.150 0.350 0.550 39.803
Along 4-7 3 14.800 0.350 0.550 64.380

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 10.730
Along E 1 25.400 0.350 0.550 36.830
Along F 1 18.000 0.350 0.550 26.100
Along 1 1 14.800 0.350 0.550 21.460
Along 2 -3 2 7.400 0.350 0.550 21.460
Along 4 1 14.800 0.350 0.550 21.460
Along 5-7 3 7.400 0.350 0.550 32.190
First Floor 0.350 0.550 0.000
Along F 1 25.400 0.350 0.550 36.830
Along Grid 1,2,3 3 7.400 0.350 0.550 32.190
Beam +14.4 level 0.000
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.350 0.550 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005
Along 2-4 3 9.150 0.350 0.550 39.803
Along 4-7 3 14.800 0.350 0.550 64.380
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 10.730
Along E 1 25.400 0.350 0.550 36.830
Along F 1 18.000 0.350 0.550 26.100
Along 1 1 14.800 0.350 0.550 21.460
Along 2 -3 2 7.400 0.350 0.550 21.460
Along 4 1 14.800 0.350 0.550 21.460
Along 5-7 3 7.400 0.350 0.550 32.190
First Floor 0.350 0.550 0.000
Along F 1 25.400 0.350 0.550 36.830
Along Grid 1,2,3 3 7.400 0.350 0.550 32.190
Beam +18.05 level 0.000
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.350 0.550 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005
Along 2-4 3 9.150 0.350 0.550 39.803
Along 4-7 3 14.800 0.350 0.550 64.380
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 10.730
Along E 1 25.400 0.350 0.550 36.830
Along F 1 18.000 0.350 0.550 26.100
Along 1 1 14.800 0.350 0.550 21.460
Along 2 -3 2 7.400 0.350 0.550 21.460
Along 4 1 14.800 0.350 0.550 21.460
Along 5-7 3 7.400 0.350 0.550 32.190

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
First Floor 0.350 0.550 0.000
Along F 1 25.400 0.350 0.550 36.830
Along Grid 1,2,3 3 7.400 0.350 0.550 32.190
shear wall
Along Grid C 1 41.300 1.000 3.600 148.680
Slab
1st Basement 1 639.400 639.400
Beam +3.6 level 1 1165.800 1165.800
Beam +7.2 level 1 1764.700 1764.700
Beam +10.8 level 1 2009.100 2009.100
Beam +14.4 level 1 2009.100 2009.100
Beam +18.05 level 1 1473.500 1473.500
GF
External wall
Along A 1 10.400 2.000 3.600 95.680
Along J 1 25.810 2.000 3.600 237.452
Along 1 1 9.600 2.000 3.600 88.320
Along 2 1 49.570 2.000 3.600 456.044
Along 6 1 29.550 2.000 3.600 271.860
Partition wall 2.000
between C-D 1 16.300 2.000 2.400 110.840
Along E & G 2 23.100 2.000 2.400 314.160
Along H & I 2 25.810 2.000 2.400 351.016
Along 4 & 5 2 49.570 2.000 2.400 674.152
1 18.900 2.000 2.400 128.520
1 19.200 2.000 2.400 130.560
1 13.100 2.000 2.400 89.080
1 22.940 2.000 2.400 155.992
1 13.916 2.000 2.400 94.629
1 16.950 2.000 2.400 115.260
1 10.570 2.000 2.400 71.876
FF 2.000
External wall 2.000
Along A 1 10.400 2.000 3.600 95.680
Along J 1 25.810 2.000 3.600 237.452
Along 1 1 9.600 2.000 3.600 88.320
Along 2 1 49.570 2.000 3.600 456.044
Along 6 1 29.550 2.000 3.600 271.860
Partition wall 2.000
Along B-G 5 7.800 2.000 2.400 265.200
Along H 1 12.500 2.000 2.400 85.000
Along I & I' 2 25.810 2.000 2.400 351.016
Along 3 1 49.570 2.000 2.400 337.076
Along 3' 1 49.570 2.000 3.600 456.044
Along 4 1 11.400 2.000 3.600 104.880
Along 5 1 22.500 2.000 3.600 207.000
Along 5' 1 5.900 2.000 3.600 54.280
1 13.100 2.000 2.400 89.080
1 22.940 2.000 2.400 155.992
SF 2.000
External wall 2.000
Along A 1 10.400 2.000 3.600 95.680
Along J 1 25.810 2.000 3.600 237.452
Along 1 1 9.600 2.000 3.600 88.320

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Along 2 1 49.570 2.000 3.600 456.044
Along 6 1 29.550 2.000 3.600 271.860
Partition wall 2.000
Along B-G 5 7.800 2.000 2.400 265.200
Along H 1 12.500 2.000 2.400 85.000
Along I & I' 2 25.810 2.000 2.400 351.016
Along 3 1 49.570 2.000 2.400 337.076
Along 3' 1 49.570 2.000 3.600 456.044
Along 4 1 11.400 2.000 3.600 104.880
Along 5 1 22.500 2.000 3.600 207.000
Along 5' 1 5.900 2.000 3.600 54.280
1 13.100 2.000 2.400 89.080
1 22.940 2.000 2.400 155.992
THF 2.000
External wall 2.000
Along A 1 10.400 2.000 3.600 95.680
Along J 1 25.810 2.000 3.600 237.452
Along 1 1 9.600 2.000 3.600 88.320
Along 2 1 49.570 2.000 3.600 456.044
Along 6 1 29.550 2.000 3.600 271.860
Partition wall 2.000
Along B-G 5 7.800 2.000 2.400 265.200
Along H 1 12.500 2.000 2.400 85.000
Along I & I' 2 25.810 2.000 2.400 351.016
Along 3 1 49.570 2.000 2.400 337.076
Along 3' 1 49.570 2.000 3.600 456.044
Along 4 1 11.400 2.000 3.600 104.880
Along 5 1 22.500 2.000 3.600 207.000
Along 5' 1 5.900 2.000 3.600 54.280
1 13.100 2.000 2.400 89.080
1 22.940 2.000 2.400 155.992
TF 2.000
External wall 2.000
Along E & G 2 23.100 2.000 3.600 425.040
Along 2 & 6 2 11.420 2.000 3.600 210.128
Partition wall 2.000
Along F 2 11.700 2.000 2.400 159.120
Along 3-5 3 11.420 2.000 2.400 232.968
between 5-6 1 6.200 2.000 2.400 42.160
between E-F 1 14.000 2.000 2.400 95.200
WIND WALL 2.000
20 1.225 2.000 18.050 933.450
10 2.000 2.000 18.050 762.000
Opening deductions
D1 18 0.75 2 2.4 -64.800
D2 103 0.9 2 2.4 -444.960
D3 104 1.2 2 2.4 -599.040
SD1 34 2.1 2 2.4 -342.720
SD2 4 2.7 2 2.4 -51.840
SD3 10 2.4 2 2.4 -115.200
SD4 5 4 2 2.4 -96.000
SD5 5 1.6 2 2.4 -38.400
SD6 1 2.65 2 2.55 -13.515
SD7 1 3 2 2.55 -15.300

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
W1 3 2.65 2 2.05 -32.595
W2 5 3.3 2 1.3 -42.900
W3 3 2.65 2 2.55 -40.545
W4 1 3 2 2.4 -14.400
W5 1 2.4 2 1.5 -7.200
W6 4 7.4 2 2.55 -150.960
W7 31 0.75 2 1.3 -60.450
W8 5 2.8 2 2.4 -67.200
W9 3 2.66 2 2.05 -32.718
W10 3 4.8 2 2.4 -69.120
W11 2 4.8 2 1.8 -34.560
CW1 3 2.8 2 1.5 -25.200
Total 29428.262 Sqm
16 Wall puty
As per plaster quantity 29428.262
29428.262 Sqm
17 Distemper/ Emulsion Painting
In structure part
Column Foundation
Column upto +14.4
From 2nd Basement
Along Grid B-C 14 0.600 4.000 18.450 33.600
Along Grid A 6 0.600 4.000 18.450 14.400
From 1st Basement
Along Grid A 1 0.600 4.000 14.400 2.400
Along D 6 0.600 4.000 14.400 14.400
Along E 3 0.600 4.000 14.400 7.200
From Ground Floor
Along D 1 0.600 4.000 10.800 2.400
Along E 4 0.600 4.000 10.800 9.600
Along F 4 0.600 4.000 10.800 9.600
From First Floor
Along F 3 0.600 4.000 7.200 7.200
Upto +20.00
From 2nd Basement
Along Grid A-F 30 0.600 4.000 4.530 72.000
Beam +0 level
Along A -D 4 14.700 0.350 0.550 85.260
2nd Basement 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
Beam +3.6 level 0.000
2nd Basement 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.550 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005
Along 2-4 3 9.150 0.350 0.550 39.803

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Along 4-7 3 14.800 0.350 0.550 64.380
Beam +7.2 level 0.350 0.550 0.000
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005
Along 2-4 3 9.150 0.350 0.550 39.803
Along 4-7 3 14.800 0.350 0.550 64.380
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 10.730
Along E 1 25.400 0.350 0.550 36.830
Along F 1 18.000 0.350 0.550 26.100
Along 1 1 14.800 0.350 0.550 21.460
Along 2 -3 2 7.400 0.350 0.550 21.460
Along 4 1 14.800 0.350 0.550 21.460
Along 5-7 3 7.400 0.350 0.550 32.190
Beam +10.8 level 0.350 0.550 0.000
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.350 0.550 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005
Along 2-4 3 9.150 0.350 0.550 39.803
Along 4-7 3 14.800 0.350 0.550 64.380
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 10.730
Along E 1 25.400 0.350 0.550 36.830
Along F 1 18.000 0.350 0.550 26.100
Along 1 1 14.800 0.350 0.550 21.460
Along 2 -3 2 7.400 0.350 0.550 21.460
Along 4 1 14.800 0.350 0.550 21.460
Along 5-7 3 7.400 0.350 0.550 32.190
First Floor 0.350 0.550 0.000
Along F 1 25.400 0.350 0.550 36.830
Along Grid 1,2,3 3 7.400 0.350 0.550 32.190
Beam +14.4 level 0.000
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.350 0.550 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Along 2-4 3 9.150 0.350 0.550 39.803
Along 4-7 3 14.800 0.350 0.550 64.380
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 10.730
Along E 1 25.400 0.350 0.550 36.830
Along F 1 18.000 0.350 0.550 26.100
Along 1 1 14.800 0.350 0.550 21.460
Along 2 -3 2 7.400 0.350 0.550 21.460
Along 4 1 14.800 0.350 0.550 21.460
Along 5-7 3 7.400 0.350 0.550 32.190
First Floor 0.350 0.550 0.000
Along F 1 25.400 0.350 0.550 36.830
Along Grid 1,2,3 3 7.400 0.350 0.550 32.190
Beam +18.05 level 0.000
2nd Basement 0.350 0.550 0.000
Along A 1 33.900 0.350 0.550 49.155
Along Grid B-C 2 41.300 0.350 0.550 119.770
Along 1 1 6.400 0.350 0.550 9.280
Along 2- 7 6 13.300 0.350 0.550 115.710
1st Basement 0.350 0.550 0.000
Along D 1 33.900 0.350 0.550 49.155
Along E 1 15.900 0.350 0.550 23.055
Along 1 1 6.900 0.350 0.550 10.005
Along 2-4 3 9.150 0.350 0.550 39.803
Along 4-7 3 14.800 0.350 0.550 64.380
Ground Floor 0.350 0.550 0.000
Along D 1 7.400 0.350 0.550 10.730
Along E 1 25.400 0.350 0.550 36.830
Along F 1 18.000 0.350 0.550 26.100
Along 1 1 14.800 0.350 0.550 21.460
Along 2 -3 2 7.400 0.350 0.550 21.460
Along 4 1 14.800 0.350 0.550 21.460
Along 5-7 3 7.400 0.350 0.550 32.190
First Floor 0.350 0.550 0.000
Along F 1 25.400 0.350 0.550 36.830
Along Grid 1,2,3 3 7.400 0.350 0.550 32.190
shear wall
Along Grid C 1 41.300 1.000 3.600 148.680
Slab
1st Basement 1 639.400 639.400
Beam +3.6 level 1 1165.800 1165.800
Beam +7.2 level 1 1764.700 1764.700
Beam +10.8 level 1 2009.100 2009.100
Beam +14.4 level 1 2009.100 2009.100
Beam +18.05 level 1 1473.500 1473.500
GF
External wall
Along A 1 10.400 1.000 3.600 85.280
Along J 1 25.810 1.000 3.600 211.642
Along 1 1 9.600 1.000 3.600 78.720
Along 2 1 49.570 1.000 3.600 406.474
Along 6 1 29.550 1.000 3.600 242.310
Partition wall
between C-D 1 16.300 2.000 2.400 110.840

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Along E & G 2 23.100 2.000 2.400 314.160
Along H & I 2 25.810 2.000 2.400 351.016
Along 4 & 5 2 49.570 2.000 2.400 674.152
1 18.900 2.000 2.400 128.520
1 19.200 2.000 2.400 130.560
1 13.100 2.000 2.400 89.080
1 22.940 2.000 2.400 155.992
1 13.916 2.000 2.400 94.629
1 16.950 2.000 2.400 115.260
1 10.570 2.000 2.400 71.876
FF 2.000
External wall 2.000
Along A 1 10.400 1.000 3.600 85.280
Along J 1 25.810 1.000 3.600 211.642
Along 1 1 9.600 1.000 3.600 78.720
Along 2 1 49.570 1.000 3.600 406.474
Along 6 1 29.550 1.000 3.600 242.310
Partition wall 2.000
Along B-G 5 7.800 2.000 2.400 265.200
Along H 1 12.500 2.000 2.400 85.000
Along I & I' 2 25.810 2.000 2.400 351.016
Along 3 1 49.570 2.000 2.400 337.076
Along 3' 1 49.570 2.000 3.600 456.044
Along 4 1 11.400 2.000 3.600 104.880
Along 5 1 22.500 2.000 3.600 207.000
Along 5' 1 5.900 2.000 3.600 54.280
1 13.100 2.000 2.400 89.080
1 22.940 2.000 2.400 155.992
SF 2.000
External wall 1.000
Along A 1 10.400 1.000 3.600 85.280
Along J 1 25.810 1.000 3.600 211.642
Along 1 1 9.600 1.000 3.600 78.720
Along 2 1 49.570 1.000 3.600 406.474
Along 6 1 29.550 1.000 3.600 242.310
Partition wall 2.000
Along B-G 5 7.800 2.000 2.400 265.200
Along H 1 12.500 2.000 2.400 85.000
Along I & I' 2 25.810 2.000 2.400 351.016
Along 3 1 49.570 2.000 2.400 337.076
Along 3' 1 49.570 2.000 3.600 456.044
Along 4 1 11.400 2.000 3.600 104.880
Along 5 1 22.500 2.000 3.600 207.000
Along 5' 1 5.900 2.000 3.600 54.280
1 13.100 2.000 2.400 89.080
1 22.940 2.000 2.400 155.992
THF 2.000
External wall 2.000
Along A 1 10.400 1.000 3.600 85.280
Along J 1 25.810 1.000 3.600 211.642
Along 1 1 9.600 1.000 3.600 78.720
Along 2 1 49.570 1.000 3.600 406.474
Along 6 1 29.550 1.000 3.600 242.310
Partition wall 2.000

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
Along B-G 5 7.800 2.000 2.400 265.200
Along H 1 12.500 2.000 2.400 85.000
Along I & I' 2 25.810 2.000 2.400 351.016
Along 3 1 49.570 2.000 2.400 337.076
Along 3' 1 49.570 2.000 3.600 456.044
Along 4 1 11.400 2.000 3.600 104.880
Along 5 1 22.500 2.000 3.600 207.000
Along 5' 1 5.900 2.000 3.600 54.280
1 13.100 2.000 2.400 89.080
1 22.940 2.000 2.400 155.992
TF 2.000
External wall 2.000
Along E & G 2 23.100 1.000 3.600 378.840
Along 2 & 6 2 11.420 1.000 3.600 187.288
Partition wall 2.000
Along F 2 11.700 2.000 2.400 159.120
Along 3-5 3 11.420 2.000 2.400 232.968
between 5-6 1 6.200 2.000 2.400 42.160
between E-F 1 14.000 2.000 2.400 95.200
Opening deductions
D1 18 0.75 2 2.4 -64.800
D2 103 0.9 2 2.4 -444.960
D3 104 1.2 2 2.4 -599.040
SD1 34 2.1 2 2.4 -342.720
SD2 4 2.7 2 2.4 -51.840
SD3 10 2.4 2 2.4 -115.200
SD4 5 4 2 2.4 -96.000
SD5 5 1.6 2 2.4 -38.400
SD6 1 2.65 2 2.55 -13.515
SD7 1 3 2 2.55 -15.300
W1 3 2.65 1 2.05 -16.298
W2 5 3.3 1 1.3 -21.450
W3 3 2.65 1 2.55 -20.273
W4 1 3 1 2.4 -7.200
W5 1 2.4 1 1.5 -3.600
W6 4 7.4 1 2.55 -75.480
W7 31 0.75 1 1.3 -30.225
W8 5 2.8 1 2.4 -33.600
W9 3 2.66 1 2.05 -16.359
W10 3 4.8 1 2.4 -34.560
W11 2 4.8 1 1.8 -17.280
CW1 3 2.8 1 1.5 -12.600
Total 25963.526 Sqm
18 Weather Coat
Total 3464.737 Sqm

22 Railing
Ramp
upto 1st 4 21.830 87.320
upto 2nd 4 21.830 87.320
upto 3rd 4 21.830 87.320
staircase 1
upto 1st basement 1 7.960 7.960
upto Ground floor 1 7.960 7.960

Prepared By: Checked By: ApprovedBy:


S.N Description of work No. Length Breadth Height Quantity Unit Remarks
upto 1st 1 7.960 7.960
upto 2nd 1 7.960 7.960
staircase 2
upto Ground floor 1 7.960 7.960
upto 1st 1 7.960 7.960
upto 2nd 1 7.960 7.960
upto 3rd 1 7.960 7.960
Total 325.640 Rm

23 Almuinum Door and Windows Panel


Panel
D1 18 0.75 2.4 32.400
D2 103 0.9 2.4 222.480
D3 104 1.2 2.4 299.520
SD1 34 2.1 2.4 171.360
SD2 4 2.7 2.4 25.920
SD3 10 2.4 2.4 57.600
SD4 5 4 2.4 48.000
SD5 5 1.6 2.4 19.200
SD6 1 2.65 2.55 6.758
SD7 1 3 2.55 7.650
W1 3 2.65 2.05 16.298
W2 5 3.3 1.3 21.450
W3 3 2.65 2.55 20.273
W4 1 3 2.4 7.200
W5 1 2.4 1.5 3.600
W6 4 7.4 2.55 75.480
W7 31 0.75 1.3 30.225
W8 5 2.8 2.4 33.600
W9 3 2.66 2.05 16.359
W10 3 4.8 2.4 34.560
W11 2 4.8 1.8 17.280
CW1 3 2.8 1.5 12.600
Total 1179.812 sqm

Prepared By: Checked By: ApprovedBy:


Calculation of Cost of Ramp
Breadt
S.N. Description of item Nos Length Height Quantity Unit Remarks
h
1 Foundation
F1 12.00 1.80 1.80 2.10 81.65 Cu.m
F2 5.00 1.90 1.90 2.10 37.91 Cu.m
F3 1.00 2.10 2.10 2.10 9.26 Cu.m
F4 2.00 2.25 2.25 2.10 21.26 Cu.m
sub total 150.08 Cu.m

2 Flat Brick Soling


F1 1.00 1.80 1.80 3.24 Sq.m
F2 1.00 1.90 1.90 3.61 Sq.m
F3 1.00 2.10 2.10 4.41 Sq.m
F4 1.00 2.25 2.25 5.06 Sq.m
Sub Total 16.32 Sq.m

3 P.C.C
F1 1.00 1.80 1.80 0.08 0.24 Cu.m
F2 1.00 1.90 1.90 0.08 0.27 Cu.m
F3 1.00 2.10 2.10 0.08 0.33 Cu.m
F4 1.00 2.25 2.25 0.08 0.38 Cu.m
sub total 1.22 Cu.m

4 R.C.C
A Foundation
F1 1.00 1.80 1.80 0.40 0.55 Cu.m
F2 1.00 1.90 1.90 0.40 0.60 Cu.m
F3 1.00 2.10 2.10 0.40 0.72 Cu.m
F4 1.00 2.25 2.25 0.40 0.82 Cu.m
sub total 2.69 Cu.m

B Column
Column Upto Plinth
C1 6.00 0.40 0.40 2.05 1.97 Cu.m
C2 2.00 0.40 0.40 2.05 0.66 Cu.m
C3 12.00 0.40 2.05 3.09 Cu.m

Column Upto Ground Floor


C1 6.00 0.40 0.40 1.80 1.73 Cu.m
C2 2.00 0.40 0.40 1.80 0.58 Cu.m
C3 12.00 0.40 1.80 2.71 Cu.m
Column Upto First Floor
C1 6.00 0.40 0.40 3.60 3.46 Cu.m
C2 2.00 0.40 0.40 3.60 1.15 Cu.m
C3 12.00 0.40 3.60 5.43 Cu.m

Column Upto Second Floor


C1 6.00 0.40 0.40 3.60 3.46 Cu.m
C2 2.00 0.40 0.40 3.60 1.15 Cu.m
C3 12.00 0.40 3.60 5.43 Cu.m

Column Upto Top Floor


C1 6.00 0.40 0.40 3.60 3.46 Cu.m
C2 2.00 0.40 0.40 3.60 1.15 Cu.m
C3 12.00 0.40 3.60 5.43 Cu.m
sub total 40.82 Cu.m

C Beam
Lower Tie Beam 1.00 108.56 0.23 0.23 5.74 Cu.m

Upper Tie Beam 1.00 108.56 0.23 0.40 9.99 Cu.m

at grid A-A
Beam @ 1.8m 1.00 24.42 0.23 0.40 2.25 Cu.m
Beam @ 5.4m 1.00 24.42 0.23 0.40 2.25 Cu.m
Beam @ 9.0m 1.00 24.42 0.23 0.40 2.25 Cu.m
Beam @ 14.4m 1.00 24.35 0.23 0.40 2.24 Cu.m

at grid B-B
Beam @ 1.8m 1.00 48.90 0.23 0.40 4.50 Cu.m
Beam @ 5.4m 1.00 48.90 0.23 0.40 4.50 Cu.m
Beam @ 9.0m 1.00 48.90 0.23 0.40 4.50 Cu.m
Beam @ 14.4m 1.00 24.35 0.23 0.40 2.24 Cu.m

at grid C-C
Beam @ 1.8m 1.00 24.42 0.23 0.40 2.25 Cu.m
Beam @ 5.4m 1.00 24.42 0.23 0.40 2.25 Cu.m
Beam @ 9.0m 1.00 24.42 0.23 0.40 2.25 Cu.m
Beam @ 14.4m 1.00 24.35 0.23 0.40 2.24 Cu.m

Primary Beam
Beam @ 1.8m 1.00 33.77 0.30 0.40 4.05 Cu.m
Beam @ 5.4m 1.00 33.77 0.30 0.40 4.05 Cu.m
Beam @ 9.0m 1.00 33.77 0.30 0.40 4.05 Cu.m
Beam @ 14.4m 1.00 33.77 0.30 0.40 4.05 Cu.m
Secondary Beam
Beam @ 1.8m 1.00 12.65 0.23 0.30 0.87 Cu.m
Beam @ 5.4m 1.00 12.65 0.23 0.30 0.87 Cu.m
Beam @ 9.0m 1.00 12.65 0.23 0.30 0.87 Cu.m
Beam @ 14.4m 1.00 12.65 0.23 0.30 0.87 Cu.m
sub total 69.13 Cu.m

D Slab
Beam @ 1.8m
Ramp 1.00 24.30 2.00 0.20 9.72 Cu.m
Landing 1.00 8.68 3.00 0.20 5.21 Cu.m

Beam @ 5.4m
Ramp 2.00 24.30 2.00 0.20 19.44 Cu.m
Landing 2.00 8.68 3.00 0.20 10.41 Cu.m

Beam @ 9.0m
Ramp 2.00 24.30 2.00 0.20 19.44 Cu.m
Landing 2.00 8.68 3.00 0.20 10.41 Cu.m

Beam @ 14.4m
Ramp 1.00 24.30 2.00 0.20 9.72 Cu.m
Landing 1.00 8.68 3.00 0.20 5.21 Cu.m

Ramp Top 1.00 121.03 0.80 96.83 Cu.m


sub total 186.37 Cu.m
Total R.C.C 299.02 Cu.m

5 Formwork
A Foundation
F1 1.00 1.80 1.80 0.40 2.88 Sq.m
F2 1.00 1.90 1.90 0.40 3.04 Sq.m
F3 1.00 2.10 2.10 0.40 3.36 Sq.m
F4 1.00 2.25 2.25 0.40 3.60 Sq.m
sub total 12.88 Sq.m

B Column
Column Upto Plinth
C1 6.00 2.05 0.40 0.40 11.76 Sq.m
C2 2.00 2.05 0.40 0.40 3.92 Sq.m
C3 12.00 2.05 0.40 3.09 Sq.m

Column Upto Ground Floor


C1 6.00 1.80 0.40 0.40 10.56 Sq.m
C2 2.00 1.80 0.40 0.40 3.52 Sq.m
C3 12.00 1.80 0.40 2.71 Sq.m
Sq.m
Column Upto First Floor
C1 6.00 3.60 0.40 0.40 19.20 Sq.m
C2 2.00 3.60 0.40 0.40 6.40 Sq.m
C3 12.00 3.60 0.40 5.43 Sq.m

Column Upto Second Floor


C1 6.00 3.60 0.40 0.40 19.20 Sq.m
C2 2.00 3.60 0.40 0.40 6.40 Sq.m
C3 12.00 3.60 0.40 5.43 Sq.m

Column Upto Top Floor


C1 6.00 3.60 0.40 0.40 19.20 Sq.m
C2 2.00 3.60 0.40 0.40 6.40 Sq.m
C3 12.00 3.60 0.40 5.43 Sq.m
sub total 128.64 Sq.m

C Beam
Lower Tie Beam 1.00 108.56 0.23 0.23 74.91 Sq.m

Upper Tie Beam 1.00 108.56 0.23 0.40 111.82 Sq.m

at grid A-A
Beam @ 1.8m 1.00 24.42 0.23 0.40 25.16 Sq.m
Beam @ 5.4m 1.00 24.42 0.23 0.40 25.16 Sq.m
Beam @ 9.0m 1.00 24.42 0.23 0.40 25.16 Sq.m
Beam @ 14.4m 1.00 24.35 0.23 0.40 25.08 Sq.m

at grid B-B
Beam @ 1.8m 1.00 48.90 0.23 0.40 50.36 Sq.m
Beam @ 5.4m 1.00 48.90 0.23 0.40 50.36 Sq.m
Beam @ 9.0m 1.00 48.90 0.23 0.40 50.36 Sq.m
Beam @ 14.4m 1.00 24.35 0.23 0.40 25.08 Sq.m

at grid C-C
Beam @ 1.8m 1.00 24.42 0.23 0.40 25.16 Sq.m
Beam @ 5.4m 1.00 24.42 0.23 0.40 25.16 Sq.m
Beam @ 9.0m 1.00 24.42 0.23 0.40 25.16 Sq.m
Beam @ 14.4m 1.00 24.35 0.23 0.40 25.08 Sq.m

Primary Beam
Beam @ 1.8m 1.00 33.77 0.30 0.40 37.15 Sq.m
Beam @ 5.4m 1.00 33.77 0.30 0.40 37.15 Sq.m
Beam @ 9.0m 1.00 33.77 0.30 0.40 37.15 Sq.m
Beam @ 14.4m 1.00 33.77 0.30 0.40 37.15 Sq.m

Secondary Beam
Beam @ 1.8m 1.00 12.65 0.23 0.30 10.50 Sq.m
Beam @ 5.4m 1.00 12.65 0.23 0.30 10.50 Sq.m
Beam @ 9.0m 1.00 12.65 0.23 0.30 10.50 Sq.m
Beam @ 14.4m 1.00 12.65 0.23 0.30 10.50 Sq.m
sub total 754.59 Sq.m

D Slab
Beam @ 1.8m
Ramp 1.00 24.30 2.00 0.20 48.60 Sq.m
Landing 1.00 8.68 3.00 0.20 26.03 Sq.m

Beam @ 5.4m
Ramp 2.00 24.30 2.00 0.20 97.20 Sq.m
Landing 2.00 8.68 3.00 0.20 52.05 Sq.m

Beam @ 9.0m
Ramp 2.00 24.30 2.00 0.20 97.20 Sq.m
Landing 2.00 8.68 3.00 0.20 52.05 Sq.m

Beam @ 14.4m
Ramp 1.00 24.30 2.00 0.20 48.60 Sq.m
Landing 1.00 8.68 3.00 0.20 26.03 Sq.m

Ramp Top 1.00 121.03 0.80 121.03 Sq.m


sub total 568.77 Sq.m
Total Formwork 1464.88 Sq.m

6 Reinforcements
A Foundation
F1 1.00 1.80 1.80
main bar 16mm @ 125 c/c 15.00 2.09 1.58 49.42 kg
distribution bar 16mm @ 12 c/c 15.00 2.09 1.58 49.42 kg

F2 1.00 1.90 1.90


main bar 16mm @ 125 c/c 16.00 2.19 1.58 55.24 kg
distribution bar 16mm @ 12 c/c 16.00 2.19 1.58 55.24 kg

F3 1.00 2.10 2.10


main bar 16mm @ 125 c/c 17.00 2.39 1.58 64.06 kg
distribution bar 16mm @ 12 c/c 17.00 2.39 1.58 64.06 kg

F4 1.00 2.25 2.25


main bar 12mm @ 150 c/c 16.00 2.54 0.88 35.74 kg
distribution bar 12mm @ 150 c/c 16.00 2.54 0.88 35.74 kg
sub total 408.92 kg

B Column
Column Upto Plinth
C1 6.00 2.05
main bar 20mm 4.00 3.25 2.47 192.35 kg
main bar 16mm 8.00 3.01 1.58 151.99 kg
stirrups 10mm @ 100 c/c 9.00 4.14 0.62 183.62 kg
stirrups 10mm @ 150 c/c 6.00 4.14 0.62 137.71 kg

C2 2.00 2.05
main bar 16mm 12.00 3.01 1.58 113.99 kg
stirrups 10mm @ 100 c/c 9.00 4.14 0.62 275.43 kg
stirrups 10mm @ 150 c/c 6.00 4.14 0.62 137.71 kg

C3 12.00 2.05
main bar 20mm 4.00 3.25 2.47 384.70 kg
main bar 16mm 8.00 3.01 1.58 151.99 kg
stirrups 10mm @ 100 c/c 9.00 4.14 0.62 183.62 kg
stirrups 10mm @ 150 c/c 6.00 4.14 0.62 137.71 kg

Column Upto Ground Floor


C1 6.00 1.80 0.40
main bar 20mm 4.00 3.00 2.47 177.55 kg
main bar 16mm 8.00 2.76 1.58 139.37 kg
stirrups 10mm @ 100 c/c 10.00 4.14 0.62 204.02 kg
stirrups 10mm @ 150 c/c 7.00 4.14 0.62 178.52 kg

C2 2.00 1.80 0.40


main bar 16mm 12.00 2.76 1.58 104.53 kg
stirrups 10mm @ 100 c/c 10.00 4.14 0.62 306.03 kg
stirrups 10mm @ 150 c/c 7.00 4.14 0.62 178.52 kg

C3 12.00 1.80
main bar 20mm 4.00 3.00 2.47 355.10 kg
main bar 16mm 8.00 2.76 1.58 139.37 kg
stirrups 10mm @ 100 c/c 10.00 4.14 0.62 204.02 kg
stirrups 10mm @ 150 c/c 7.00 4.14 0.62 178.52 kg
Column Upto First Floor
C1 6.00 3.60 0.40
main bar 20mm 4.00 4.80 2.47 284.08 kg
main bar 16mm 8.00 4.56 1.58 230.26 kg
stirrups 10mm @ 100 c/c 19.00 4.14 0.62 387.64 kg
stirrups 10mm @ 150 c/c 13.00 4.14 0.62 629.91 kg

C2 2.00 3.60 0.40


main bar 16mm 12.00 4.56 1.58 172.70 kg
stirrups 10mm @ 100 c/c 19.00 4.14 0.62 581.45 kg
stirrups 10mm @ 150 c/c 13.00 4.14 0.62 629.91 kg

C3 12.00 3.60
main bar 20mm 4.00 4.80 2.47 568.17 kg
main bar 16mm 8.00 4.56 1.58 230.26 kg
stirrups 10mm @ 100 c/c 19.00 4.14 0.62 387.64 kg
stirrups 10mm @ 150 c/c 13.00 4.14 0.62 629.91 kg

Column Upto Second Floor


C1 6.00 3.60
main bar 20mm 4.00 4.80 2.47 284.08 kg
main bar 16mm 8.00 4.56 1.58 230.26 kg
stirrups 10mm @ 100 c/c 19.00 4.14 0.62 387.64 kg
stirrups 10mm @ 150 c/c 13.00 4.14 0.62 629.91 kg

C2 2.00 3.60
main bar 16mm 12.00 4.80 1.58 181.79 kg
stirrups 10mm @ 100 c/c 19.00 4.56 0.62 640.44 kg
stirrups 10mm @ 150 c/c 13.00 4.56 0.62 693.81 kg

C3 12.00 3.60
main bar 20mm 4.00 4.80 2.47 568.17 kg
main bar 16mm 8.00 4.56 1.58 230.26 kg
stirrups 10mm @ 100 c/c 19.00 4.14 0.62 387.64 kg
stirrups 10mm @ 150 c/c 13.00 4.14 0.62 629.91 kg

Column Upto Top Floor


C1 6.00 3.60 0.40
main bar 20mm 4.00 4.80 2.47 284.08 kg
main bar 16mm 8.00 4.56 1.58 230.26 kg
stirrups 10mm @ 100 c/c 19.00 4.14 0.62 387.64 kg
stirrups 10mm @ 150 c/c 13.00 4.14 0.62 629.91 kg
C2 2.00 3.60 0.40
main bar 16mm 12.00 4.80 1.58 181.79 kg
stirrups 10mm @ 100 c/c 19.00 4.56 0.62 640.44 kg
stirrups 10mm @ 150 c/c 13.00 4.56 0.62 693.81 kg

C3 12.00 3.60
main bar 20mm 4.00 4.80 2.47 568.17 kg
main bar 16mm 8.00 4.56 1.58 230.26 kg
stirrups 10mm @ 100 c/c 19.00 4.14 0.62 387.64 kg
stirrups 10mm @ 150 c/c 13.00 4.14 0.62 629.91 kg
sub total 19493.94 kg

C Beam
Lower Tie Beam 1.00 108.56 0.23
main bar 16mm 6.00 110.48 1.58 1046.05 kg
stirrups 10mm @ 100 c/c 543.00 1.36 0.62 455.27 kg
stirrups 10mm @ 150 c/c 362.00 1.36 0.62 303.52 kg

Upper Tie Beam 1.00 108.56 0.23


main bar 16mm 6.00 110.48 1.58 1046.05 kg
stirrups 10mm @ 100 c/c 543.00 1.36 0.62 455.27 kg
stirrups 10mm @ 150 c/c 362.00 1.36 0.62 303.52 kg

at grid A-A
Beam @ 1.8m 1.00 24.42 0.23
main bar 16mm 6.00 3.27 1.58 30.97 kg
main bar 20mm 6.00 23.31 2.47 344.94 kg
stirrups 10mm @ 100 c/c 134.00 1.36 0.62 112.35 kg
stirrups 10mm @ 150 c/c 74.00 1.36 0.62 62.04 kg

Beam @ 5.4m 1.00 24.42 0.23


main bar 16mm 6.00 3.27 1.58 30.97 kg
main bar 20mm 6.00 23.31 2.47 344.94 kg
stirrups 10mm @ 100 c/c 134.00 1.36 0.62 112.35 kg
stirrups 10mm @ 150 c/c 74.00 1.36 0.62 62.04 kg

Beam @ 9.0m 1.00 24.42 0.23


main bar 16mm 6.00 3.27 1.58 30.97 kg
main bar 20mm 6.00 23.31 2.47 344.94 kg
stirrups 10mm @ 100 c/c 134.00 1.36 0.62 112.35 kg
stirrups 10mm @ 150 c/c 74.00 1.36 0.62 62.04 kg

Beam @ 14.4m 1.00 24.35 0.23


main bar 16mm 6.00 25.31 1.58 239.94 kg
stirrups 10mm @ 100 c/c 134.00 1.36 0.62 112.35 kg
stirrups 10mm @ 150 c/c 74.00 1.36 0.62 62.04 kg

at grid B-B
Beam @ 1.8m 1.00 48.90 0.23
main bar 16mm 6.00 3.27 1.58 30.97 kg
main bar 20mm 6.00 47.79 2.47 707.12 kg
stirrups 10mm @ 100 c/c 245.00 1.36 0.62 205.42 kg
stirrups 10mm @ 150 c/c 163.00 1.36 0.62 136.67 kg

Beam @ 5.4m 1.00 48.90 0.23


main bar 16mm 6.00 3.27 1.58 30.97 kg
main bar 20mm 6.00 47.79 2.47 707.12 kg
stirrups 10mm @ 100 c/c 245.00 1.36 0.62 205.42 kg
stirrups 10mm @ 150 c/c 163.00 1.36 0.62 136.67 kg

Beam @ 9.0m 1.00 48.90 0.23


main bar 16mm 6.00 3.27 1.58 30.97 kg
main bar 20mm 6.00 47.79 2.47 707.12 kg
stirrups 10mm @ 100 c/c 245.00 1.36 0.62 205.42 kg
stirrups 10mm @ 150 c/c 163.00 1.36 0.62 136.67 kg

Beam @ 14.4m 1.00 24.35 0.23


main bar 16mm 6.00 25.31 1.58 239.94 kg
stirrups 10mm @ 100 c/c 134.00 1.36 0.62 112.35 kg
stirrups 10mm @ 150 c/c 74.00 1.36 0.62 62.04 kg

at grid C-C
Beam @ 1.8m 1.00 24.42 0.23
main bar 16mm 6.00 3.27 1.58 30.97 kg
main bar 20mm 6.00 23.31 2.47 344.94 kg
stirrups 10mm @ 100 c/c 134.00 1.36 0.62 112.35 kg
stirrups 10mm @ 150 c/c 74.00 1.36 0.62 62.04 kg

Beam @ 5.4m 1.00 24.42 0.23


main bar 16mm 6.00 3.27 1.58 30.97 kg
main bar 20mm 6.00 23.31 2.47 344.94 kg
stirrups 10mm @ 100 c/c 134.00 1.36 0.62 112.35 kg
stirrups 10mm @ 150 c/c 74.00 1.36 0.62 62.04 kg

Beam @ 9.0m 1.00 24.42 0.23


main bar 16mm 6.00 3.27 1.58 30.97 kg
main bar 20mm 6.00 23.31 2.47 344.94 kg
stirrups 10mm @ 100 c/c 134.00 1.36 0.62 112.35 kg
stirrups 10mm @ 150 c/c 74.00 1.36 0.62 62.04 kg

Beam @ 14.4m 1.00 24.35 0.23


main bar 16mm 6.00 25.31 1.58 239.94 kg
stirrups 10mm @ 100 c/c 134.00 1.36 0.62 112.35 kg
stirrups 10mm @ 150 c/c 74.00 1.36 0.62 62.04 kg

Primary Beam
Beam @ 1.8m 1.00 33.77 0.30
main bar 20mm 6.00 34.73 2.47 513.89 kg
stirrups 10mm @ 100 c/c 169.00 1.36 0.62 141.70 kg
stirrups 10mm @ 150 c/c 113.00 1.36 0.62 94.74 kg

Beam @ 5.4m 1.00 33.77 0.30


main bar 20mm 6.00 34.73 2.47 513.89 kg
stirrups 10mm @ 100 c/c 169.00 1.36 0.62 141.70 kg
stirrups 10mm @ 150 c/c 113.00 1.36 0.62 94.74 kg

Beam @ 9.0m 1.00 33.77 0.30


main bar 20mm 6.00 34.73 2.47 513.89 kg
stirrups 10mm @ 100 c/c 169.00 1.36 0.62 141.70 kg
stirrups 10mm @ 150 c/c 113.00 1.36 0.62 94.74 kg

Beam @ 14.4m 1.00 33.77 0.30


main bar 20mm 6.00 34.73 2.47 513.89 kg
stirrups 10mm @ 100 c/c 169.00 1.36 0.62 141.70 kg
stirrups 10mm @ 150 c/c 113.00 1.36 0.62 94.74 kg

Secondary Beam
Beam @ 1.8m 1.00 12.65 0.23
main bar 20mm 6.00 13.61 2.47 201.34 kg
stirrups 10mm @ 100 c/c 64.00 1.36 0.62 53.66 kg
stirrups 10mm @ 150 c/c 43.00 1.36 0.62 36.05 kg

Beam @ 5.4m 1.00 12.65 0.23


main bar 20mm 6.00 13.61 2.47 201.34 kg
stirrups 10mm @ 100 c/c 64.00 1.36 0.62 53.66 kg
stirrups 10mm @ 150 c/c 43.00 1.36 0.62 36.05 kg

Beam @ 9.0m 1.00 12.65 0.23


main bar 20mm 6.00 13.61 2.47 201.34 kg
stirrups 10mm @ 100 c/c 64.00 1.36 0.62 53.66 kg
stirrups 10mm @ 150 c/c 43.00 1.36 0.62 36.05 kg
Beam @ 14.4m 1.00 12.65 0.23
main bar 20mm 6.00 13.61 2.47 201.34 kg
stirrups 10mm @ 100 c/c 64.00 1.36 0.62 53.66 kg
stirrups 10mm @ 150 c/c 43.00 1.36 0.62 36.05 kg
sub total 15560.60 kg

D Slab
Ramp 8.00 24.20
main bar 10mm @ 125 c/c 28.00 24.38 0.62 3386.45 kg
distribution bar 10mm @ 125 c/c 194.00 1.64 0.62 1578.07 kg

Landing 3.00 4.10 1.90


main bar 10mm @ 125 c/c 16.00 4.23 0.62 125.88 kg
distribution bar 10mm @ 125 c/c 33.00 2.03 0.62 124.60 kg
sub total 5215.01 kg
Total Reinforcement 40678.47 kg

7 Railing Works 3.50 46.40 162.40 R.m