Abstract of Cost of Oldage Block B
Abstract of Cost of Oldage Block B
F2 3 3.510 3.510
main bar 16mm @ 150 c/c 24.00 3.80 1.58 431.51 kg
distribution bar 16mm @ 150 c/c 24.00 3.80 1.58 431.51 kg
F3 1 3.960 3.960
main bar 16mm @ 150 c/c 27.00 4.25 1.58 180.99 kg
distribution bar 16mm @ 150 c/c 27.00 4.25 1.58 180.99 kg
F4 6 4.570 4.570
main bar 16mm @ 150 c/c 31.00 4.86 1.58 1425.86 kg
distribution bar 16mm @ 150 c/c 31.00 4.86 1.58 1425.86 kg
F5 2 4.720 4.720
main bar 16mm @ 150 c/c 32.00 5.01 1.58 505.77 kg
distribution bar 16mm @ 150 c/c 32.00 5.01 1.58 505.77 kg
B Beam
B-1 lower tie beam 1 376.956
main bar 16mm 8.00 378.84 1.58 4782.53 kg
stirrups 8mm 100 c/c 1885.00 1.54 0.40 1164.18 kg
stirrups 8mm 150 c/c 1257.00 1.54 0.40 776.32 kg
C Column
C-1 upto plinth lvl
c1 3.00 2.26
main bar 25mm 126.00 3.76 3.85 1823.98 kg
main bar 20mm 54.00 3.46 2.46 459.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c2 10.00 2.26
main bar 25mm 126.00 3.76 3.85 1823.98 kg
main bar 20mm 54.00 3.46 2.46 459.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c3 16.00 2.26
main bar 25mm 126.00 3.76 3.85 1823.98 kg
main bar 20mm 54.00 3.46 2.46 459.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c4 2.00 2.26
main bar 25mm 126.00 3.76 3.85 1823.98 kg
main bar 20mm 54.00 3.46 2.46 459.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c5 8.00 2.26
main bar 25mm 126.00 3.76 3.85 1823.98 kg
c6 4.00 2.26
main bar 25mm 126.00 3.76 3.85 1823.98 kg
main bar 20mm 54.00 3.46 2.46 459.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c2 10.00 3.60
main bar 25mm 126.00 5.10 3.85 2474.01 kg
main bar 20mm 54.00 4.80 2.46 637.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c3 16.00 3.60
main bar 25mm 126.00 5.10 3.85 2474.01 kg
main bar 20mm 54.00 4.80 2.46 637.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c4 2.00 3.60
main bar 25mm 126.00 5.10 3.85 2474.01 kg
main bar 20mm 54.00 4.80 2.46 637.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c5 8.00 3.60
main bar 25mm 126.00 5.10 3.85 2474.01 kg
main bar 20mm 54.00 4.80 2.46 637.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c6 4.00 3.60
main bar 25mm 126.00 5.10 3.85 2474.01 kg
main bar 20mm 54.00 4.80 2.46 637.63 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c2 10.00 4.00
main bar 25mm 126.00 5.50 3.85 2668.05 kg
main bar 20mm 54.00 5.20 2.46 690.77 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c3 16.00 4.00
main bar 25mm 126.00 5.50 3.85 2668.05 kg
main bar 20mm 54.00 5.20 2.46 690.77 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c4 2.00 4.00
main bar 25mm 126.00 5.50 3.85 2668.05 kg
main bar 20mm 54.00 5.20 2.46 690.77 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c5 8.00 4.00
main bar 25mm 126.00 5.50 3.85 2668.05 kg
main bar 20mm 54.00 5.20 2.46 690.77 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
c6 4.00 4.00
main bar 25mm 126.00 5.50 3.85 2668.05 kg
main bar 20mm 54.00 5.20 2.46 690.77 kg
stirrups 8mm @ 100c/c 8.00 9.32 0.40 29.82 kg
stirrups 8mm @ 150c/c 5.00 9.32 0.40 18.64 kg
sub total 53396.73 kg
D Slab
second basement
bottom bar
x-axis
bottom 10mm @ 150 c/c 160.00 49.19 0.62 4847.97 kg
top 10mm @ 150 c/c 160.00 31.80 0.62 3134.21 kg
y axis
bottom 10mm @ 150 c/c 160.00 43.15 0.62 4252.47 kg
top 10mm @ 150 c/c 160.00 28.55 0.62 2813.79 kg
first basement
bottom bar
x-axis
bottom 10mm @ 150 c/c 213.00 49.19 0.62 6453.86 kg
top 10mm @ 150 c/c 213.00 31.80 0.62 4172.41 kg
floor area
bottom bar
x-axis
bottom 10mm @ 150 c/c 58.00 49.19 0.62 1757.39 kg
top 10mm @ 150 c/c 58.00 31.80 0.62 1136.15 kg
y axis
bottom 10mm @ 150 c/c 58.00 43.15 0.62 1541.52 kg
top 10mm @ 150 c/c 58.00 28.55 0.62 1020.00 kg
y axis
bottom 10mm @ 150 c/c 493.00 43.15 0.62 39308.77 kg
top 10mm @ 150 c/c 493.00 28.55 0.62 26009.97 kg
top floor
bottom bar
x-axis
bottom 10mm @ 150 c/c 245.00 49.19 0.62 7423.45 kg
top 10mm @ 150 c/c 245.00 31.80 0.62 4799.26 kg
y axis
bottom 10mm @ 150 c/c 245.00 43.15 0.62 6511.59 kg
top 10mm @ 150 c/c 245.00 28.55 0.62 4308.62 kg
sub total 202683.63 kg
E Shear wall
wall 1 1.00 6.40
main bar 16mm @ 125 c/c 94.00 5.70 1.58 846.56 kg
distribution bar 10mm @ 150 c/c 78.00 6.40 0.62 309.50 kg
F Staircase 16.00
main bottom bar 16mm @ 125 c/c 34.00 9.65 1.58 8283.87 kg
main top bar 16mm @ 300 c/c 14.00 13.42 1.58 4743.95 kg
distribution bar 12mm @ 125 c/c 132.00 1.80 0.88 3345.41 kg
nosing
main bar 10mm @ 150 c/c 364.00 2.67 0.62 9593.20 kg
distribution bar 10mm 26.00 2.00 0.62 512.51 kg
Landing
12mm Top+Bottom bar @ 125 c/c 68.00 4.26 0.88 4077.74 kg
sub total 30556.67 kg
Total 432.924 MT
10 Superstructure wall
GF
External wall
Along A 1 10.400 0.230 3.600 77.272
Along J 1 25.810 0.230 3.600 191.768
Along 1 1 9.600 0.230 3.600 71.328
Along 2 1 49.570 0.230 3.600 368.305
Along 6 1 29.550 0.230 3.600 219.557
Partition wall
between C-D 1 16.300 0.110 2.400 80.033
Along E & G 2 23.100 0.110 2.400 226.842
Along H & I 2 25.810 0.110 2.400 253.454
Along 4 & 5 2 49.570 0.110 2.400 486.777
1 18.900 0.110 2.400 92.799
1 19.200 0.110 2.400 94.272
1 13.100 0.110 2.400 64.321
1 22.940 0.110 2.400 112.635
1 13.916 0.110 2.400 68.328
1 16.950 0.110 2.400 83.225
1 10.570 0.110 2.400 51.899
FF
External wall
Along A 1 10.400 0.230 3.600 77.272
Along J 1 25.810 0.230 3.600 191.768
Along 1 1 9.600 0.230 3.600 71.328
Along 2 1 49.570 0.230 3.600 368.305
Along 6 1 29.550 0.230 3.600 219.557
Partition wall
Along B-G 5 7.800 0.110 2.400 191.490
Along H 1 12.500 0.110 2.400 61.375
Along I & I' 2 25.810 0.110 2.400 253.454
Along 3 1 49.570 0.110 2.400 243.389
Along 3' 1 49.570 0.110 3.600 362.357
Along 4 1 11.400 0.110 3.600 83.334
Along 5 1 22.500 0.110 3.600 164.475
Along 5' 1 5.900 0.110 3.600 43.129
1 13.100 0.110 2.400 64.321
1 22.940 0.110 2.400 112.635
SF
External wall
Along A 1 10.400 0.230 3.600 77.272
Along J 1 25.810 0.230 3.600 191.768
Along 1 1 9.600 0.230 3.600 71.328
Along 2 1 49.570 0.230 3.600 368.305
Along 6 1 29.550 0.230 3.600 219.557
Partition wall
Along B-G 5 7.800 0.110 2.400 191.490
Along H 1 12.500 0.110 2.400 61.375
Along I & I' 2 25.810 0.110 2.400 253.454
Along 3 1 49.570 0.110 2.400 243.389
Along 3' 1 49.570 0.110 3.600 362.357
14 False Ceiling
Slab
Beam +3.6 level 1 1165.800 1165.800
Beam +7.2 level 1 1764.700 1764.700
Beam +10.8 level 1 2009.100 2009.100
Beam +14.4 level 1 2009.100 2009.100
Beam +18.05 level 1 1473.500 1473.500
8422.200 Sqm
15 Plaster
In structure part
Column Foundation
Column upto +14.4
From 2nd Basement
Along Grid B-C 14 0.600 0.600 18.450 5.040
Along Grid A 6 0.600 0.600 18.450 2.160
From 1st Basement
Along Grid A 1 0.600 0.600 14.400 0.360
Along D 6 0.600 0.600 14.400 2.160
Along E 3 0.600 0.600 14.400 1.080
From Ground Floor
Along D 1 0.600 0.600 10.800 0.360
Along E 4 0.600 0.600 10.800 1.440
Along F 4 0.600 0.600 10.800 1.440
From First Floor
Along F 3 0.600 0.600 7.200 1.080
Upto +20.00
From 2nd Basement
Along Grid A-F 30 0.600 0.600 4.530 10.800
Tie Beam 0.000
2nd Basement 0.000
Along A 1 33.900 1.000 0.450 15.255
Along Grid B-C 2 41.300 1.000 0.450 37.170
Along 1 1 6.400 1.000 0.450 2.880
Along 2- 7 6 13.300 1.000 0.450 35.910
1st Basement 0.000
Along D 1 33.900 1.000 0.450 15.255
Along E 1 15.900 1.000 0.450 7.155
Along 1 1 6.900 1.000 0.450 3.105
Along 2-4 3 9.150 1.000 0.450 12.353
Along 4-7 3 14.800 1.000 0.450 19.980
Ground Floor 0.000
Along D 1 7.400 1.000 0.450 3.330
Along E 1 25.400 1.000 0.450 11.430
Along F 1 18.000 1.000 0.450 8.100
Along 1 1 14.800 1.000 0.450 6.660
Along 2 -3 2 7.400 1.000 0.450 6.660
Along 4 1 14.800 1.000 0.450 6.660
Along 5-7 3 7.400 1.000 0.450 9.990
22 Railing
Ramp
upto 1st 4 21.830 87.320
upto 2nd 4 21.830 87.320
upto 3rd 4 21.830 87.320
staircase 1
upto 1st basement 1 7.960 7.960
upto Ground floor 1 7.960 7.960
3 P.C.C
F1 1.00 1.80 1.80 0.08 0.24 Cu.m
F2 1.00 1.90 1.90 0.08 0.27 Cu.m
F3 1.00 2.10 2.10 0.08 0.33 Cu.m
F4 1.00 2.25 2.25 0.08 0.38 Cu.m
sub total 1.22 Cu.m
4 R.C.C
A Foundation
F1 1.00 1.80 1.80 0.40 0.55 Cu.m
F2 1.00 1.90 1.90 0.40 0.60 Cu.m
F3 1.00 2.10 2.10 0.40 0.72 Cu.m
F4 1.00 2.25 2.25 0.40 0.82 Cu.m
sub total 2.69 Cu.m
B Column
Column Upto Plinth
C1 6.00 0.40 0.40 2.05 1.97 Cu.m
C2 2.00 0.40 0.40 2.05 0.66 Cu.m
C3 12.00 0.40 2.05 3.09 Cu.m
C Beam
Lower Tie Beam 1.00 108.56 0.23 0.23 5.74 Cu.m
at grid A-A
Beam @ 1.8m 1.00 24.42 0.23 0.40 2.25 Cu.m
Beam @ 5.4m 1.00 24.42 0.23 0.40 2.25 Cu.m
Beam @ 9.0m 1.00 24.42 0.23 0.40 2.25 Cu.m
Beam @ 14.4m 1.00 24.35 0.23 0.40 2.24 Cu.m
at grid B-B
Beam @ 1.8m 1.00 48.90 0.23 0.40 4.50 Cu.m
Beam @ 5.4m 1.00 48.90 0.23 0.40 4.50 Cu.m
Beam @ 9.0m 1.00 48.90 0.23 0.40 4.50 Cu.m
Beam @ 14.4m 1.00 24.35 0.23 0.40 2.24 Cu.m
at grid C-C
Beam @ 1.8m 1.00 24.42 0.23 0.40 2.25 Cu.m
Beam @ 5.4m 1.00 24.42 0.23 0.40 2.25 Cu.m
Beam @ 9.0m 1.00 24.42 0.23 0.40 2.25 Cu.m
Beam @ 14.4m 1.00 24.35 0.23 0.40 2.24 Cu.m
Primary Beam
Beam @ 1.8m 1.00 33.77 0.30 0.40 4.05 Cu.m
Beam @ 5.4m 1.00 33.77 0.30 0.40 4.05 Cu.m
Beam @ 9.0m 1.00 33.77 0.30 0.40 4.05 Cu.m
Beam @ 14.4m 1.00 33.77 0.30 0.40 4.05 Cu.m
Secondary Beam
Beam @ 1.8m 1.00 12.65 0.23 0.30 0.87 Cu.m
Beam @ 5.4m 1.00 12.65 0.23 0.30 0.87 Cu.m
Beam @ 9.0m 1.00 12.65 0.23 0.30 0.87 Cu.m
Beam @ 14.4m 1.00 12.65 0.23 0.30 0.87 Cu.m
sub total 69.13 Cu.m
D Slab
Beam @ 1.8m
Ramp 1.00 24.30 2.00 0.20 9.72 Cu.m
Landing 1.00 8.68 3.00 0.20 5.21 Cu.m
Beam @ 5.4m
Ramp 2.00 24.30 2.00 0.20 19.44 Cu.m
Landing 2.00 8.68 3.00 0.20 10.41 Cu.m
Beam @ 9.0m
Ramp 2.00 24.30 2.00 0.20 19.44 Cu.m
Landing 2.00 8.68 3.00 0.20 10.41 Cu.m
Beam @ 14.4m
Ramp 1.00 24.30 2.00 0.20 9.72 Cu.m
Landing 1.00 8.68 3.00 0.20 5.21 Cu.m
5 Formwork
A Foundation
F1 1.00 1.80 1.80 0.40 2.88 Sq.m
F2 1.00 1.90 1.90 0.40 3.04 Sq.m
F3 1.00 2.10 2.10 0.40 3.36 Sq.m
F4 1.00 2.25 2.25 0.40 3.60 Sq.m
sub total 12.88 Sq.m
B Column
Column Upto Plinth
C1 6.00 2.05 0.40 0.40 11.76 Sq.m
C2 2.00 2.05 0.40 0.40 3.92 Sq.m
C3 12.00 2.05 0.40 3.09 Sq.m
C Beam
Lower Tie Beam 1.00 108.56 0.23 0.23 74.91 Sq.m
at grid A-A
Beam @ 1.8m 1.00 24.42 0.23 0.40 25.16 Sq.m
Beam @ 5.4m 1.00 24.42 0.23 0.40 25.16 Sq.m
Beam @ 9.0m 1.00 24.42 0.23 0.40 25.16 Sq.m
Beam @ 14.4m 1.00 24.35 0.23 0.40 25.08 Sq.m
at grid B-B
Beam @ 1.8m 1.00 48.90 0.23 0.40 50.36 Sq.m
Beam @ 5.4m 1.00 48.90 0.23 0.40 50.36 Sq.m
Beam @ 9.0m 1.00 48.90 0.23 0.40 50.36 Sq.m
Beam @ 14.4m 1.00 24.35 0.23 0.40 25.08 Sq.m
at grid C-C
Beam @ 1.8m 1.00 24.42 0.23 0.40 25.16 Sq.m
Beam @ 5.4m 1.00 24.42 0.23 0.40 25.16 Sq.m
Beam @ 9.0m 1.00 24.42 0.23 0.40 25.16 Sq.m
Beam @ 14.4m 1.00 24.35 0.23 0.40 25.08 Sq.m
Primary Beam
Beam @ 1.8m 1.00 33.77 0.30 0.40 37.15 Sq.m
Beam @ 5.4m 1.00 33.77 0.30 0.40 37.15 Sq.m
Beam @ 9.0m 1.00 33.77 0.30 0.40 37.15 Sq.m
Beam @ 14.4m 1.00 33.77 0.30 0.40 37.15 Sq.m
Secondary Beam
Beam @ 1.8m 1.00 12.65 0.23 0.30 10.50 Sq.m
Beam @ 5.4m 1.00 12.65 0.23 0.30 10.50 Sq.m
Beam @ 9.0m 1.00 12.65 0.23 0.30 10.50 Sq.m
Beam @ 14.4m 1.00 12.65 0.23 0.30 10.50 Sq.m
sub total 754.59 Sq.m
D Slab
Beam @ 1.8m
Ramp 1.00 24.30 2.00 0.20 48.60 Sq.m
Landing 1.00 8.68 3.00 0.20 26.03 Sq.m
Beam @ 5.4m
Ramp 2.00 24.30 2.00 0.20 97.20 Sq.m
Landing 2.00 8.68 3.00 0.20 52.05 Sq.m
Beam @ 9.0m
Ramp 2.00 24.30 2.00 0.20 97.20 Sq.m
Landing 2.00 8.68 3.00 0.20 52.05 Sq.m
Beam @ 14.4m
Ramp 1.00 24.30 2.00 0.20 48.60 Sq.m
Landing 1.00 8.68 3.00 0.20 26.03 Sq.m
6 Reinforcements
A Foundation
F1 1.00 1.80 1.80
main bar 16mm @ 125 c/c 15.00 2.09 1.58 49.42 kg
distribution bar 16mm @ 12 c/c 15.00 2.09 1.58 49.42 kg
B Column
Column Upto Plinth
C1 6.00 2.05
main bar 20mm 4.00 3.25 2.47 192.35 kg
main bar 16mm 8.00 3.01 1.58 151.99 kg
stirrups 10mm @ 100 c/c 9.00 4.14 0.62 183.62 kg
stirrups 10mm @ 150 c/c 6.00 4.14 0.62 137.71 kg
C2 2.00 2.05
main bar 16mm 12.00 3.01 1.58 113.99 kg
stirrups 10mm @ 100 c/c 9.00 4.14 0.62 275.43 kg
stirrups 10mm @ 150 c/c 6.00 4.14 0.62 137.71 kg
C3 12.00 2.05
main bar 20mm 4.00 3.25 2.47 384.70 kg
main bar 16mm 8.00 3.01 1.58 151.99 kg
stirrups 10mm @ 100 c/c 9.00 4.14 0.62 183.62 kg
stirrups 10mm @ 150 c/c 6.00 4.14 0.62 137.71 kg
C3 12.00 1.80
main bar 20mm 4.00 3.00 2.47 355.10 kg
main bar 16mm 8.00 2.76 1.58 139.37 kg
stirrups 10mm @ 100 c/c 10.00 4.14 0.62 204.02 kg
stirrups 10mm @ 150 c/c 7.00 4.14 0.62 178.52 kg
Column Upto First Floor
C1 6.00 3.60 0.40
main bar 20mm 4.00 4.80 2.47 284.08 kg
main bar 16mm 8.00 4.56 1.58 230.26 kg
stirrups 10mm @ 100 c/c 19.00 4.14 0.62 387.64 kg
stirrups 10mm @ 150 c/c 13.00 4.14 0.62 629.91 kg
C3 12.00 3.60
main bar 20mm 4.00 4.80 2.47 568.17 kg
main bar 16mm 8.00 4.56 1.58 230.26 kg
stirrups 10mm @ 100 c/c 19.00 4.14 0.62 387.64 kg
stirrups 10mm @ 150 c/c 13.00 4.14 0.62 629.91 kg
C2 2.00 3.60
main bar 16mm 12.00 4.80 1.58 181.79 kg
stirrups 10mm @ 100 c/c 19.00 4.56 0.62 640.44 kg
stirrups 10mm @ 150 c/c 13.00 4.56 0.62 693.81 kg
C3 12.00 3.60
main bar 20mm 4.00 4.80 2.47 568.17 kg
main bar 16mm 8.00 4.56 1.58 230.26 kg
stirrups 10mm @ 100 c/c 19.00 4.14 0.62 387.64 kg
stirrups 10mm @ 150 c/c 13.00 4.14 0.62 629.91 kg
C3 12.00 3.60
main bar 20mm 4.00 4.80 2.47 568.17 kg
main bar 16mm 8.00 4.56 1.58 230.26 kg
stirrups 10mm @ 100 c/c 19.00 4.14 0.62 387.64 kg
stirrups 10mm @ 150 c/c 13.00 4.14 0.62 629.91 kg
sub total 19493.94 kg
C Beam
Lower Tie Beam 1.00 108.56 0.23
main bar 16mm 6.00 110.48 1.58 1046.05 kg
stirrups 10mm @ 100 c/c 543.00 1.36 0.62 455.27 kg
stirrups 10mm @ 150 c/c 362.00 1.36 0.62 303.52 kg
at grid A-A
Beam @ 1.8m 1.00 24.42 0.23
main bar 16mm 6.00 3.27 1.58 30.97 kg
main bar 20mm 6.00 23.31 2.47 344.94 kg
stirrups 10mm @ 100 c/c 134.00 1.36 0.62 112.35 kg
stirrups 10mm @ 150 c/c 74.00 1.36 0.62 62.04 kg
at grid B-B
Beam @ 1.8m 1.00 48.90 0.23
main bar 16mm 6.00 3.27 1.58 30.97 kg
main bar 20mm 6.00 47.79 2.47 707.12 kg
stirrups 10mm @ 100 c/c 245.00 1.36 0.62 205.42 kg
stirrups 10mm @ 150 c/c 163.00 1.36 0.62 136.67 kg
at grid C-C
Beam @ 1.8m 1.00 24.42 0.23
main bar 16mm 6.00 3.27 1.58 30.97 kg
main bar 20mm 6.00 23.31 2.47 344.94 kg
stirrups 10mm @ 100 c/c 134.00 1.36 0.62 112.35 kg
stirrups 10mm @ 150 c/c 74.00 1.36 0.62 62.04 kg
Primary Beam
Beam @ 1.8m 1.00 33.77 0.30
main bar 20mm 6.00 34.73 2.47 513.89 kg
stirrups 10mm @ 100 c/c 169.00 1.36 0.62 141.70 kg
stirrups 10mm @ 150 c/c 113.00 1.36 0.62 94.74 kg
Secondary Beam
Beam @ 1.8m 1.00 12.65 0.23
main bar 20mm 6.00 13.61 2.47 201.34 kg
stirrups 10mm @ 100 c/c 64.00 1.36 0.62 53.66 kg
stirrups 10mm @ 150 c/c 43.00 1.36 0.62 36.05 kg
D Slab
Ramp 8.00 24.20
main bar 10mm @ 125 c/c 28.00 24.38 0.62 3386.45 kg
distribution bar 10mm @ 125 c/c 194.00 1.64 0.62 1578.07 kg