0% found this document useful (0 votes)
39 views2 pages

Konark Virtue: SR - No Activity Labour Place Quantity Unit

The document lists 3 activities with details on labour, place, quantity and unit: 1) 6 labourers completed casting a well upto 1.2m using 8 cubic meters of material. 2) 2 labourers reinforced 450kg of columns for a club house. 3) 7 labourers laid 30 meters of external waterline using T3 piping at the backside.

Uploaded by

Shruti Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views2 pages

Konark Virtue: SR - No Activity Labour Place Quantity Unit

The document lists 3 activities with details on labour, place, quantity and unit: 1) 6 labourers completed casting a well upto 1.2m using 8 cubic meters of material. 2) 2 labourers reinforced 450kg of columns for a club house. 3) 7 labourers laid 30 meters of external waterline using T3 piping at the backside.

Uploaded by

Shruti Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Konark Virtue

External Work
Sr.No Activity Labour Place Quantity Unit
1 Tatad well 6 Well pardi casting completed 8 Cu.m
upto 1.2m
2 Tatad Club House 2 2 Column Reiforcement 450 kg
3 GA Plumbing 7 External waterline T3 30 m
backside
Remark