Technical Specification For Sub-Station Lightning Protection and Sub-Station Earthing
Technical Specification For Sub-Station Lightning Protection and Sub-Station Earthing
1. SCOPE :
LIGHTNING PROTECTION:-
i) Lightning protection shall be adopted based on the method using shielding wire
and/or Earth mast. All necessary arrangements for achieving Lightning protection
of the entire switchyard and control room building are under the scope of this
tender shall be within the scope of the successful bidder. Supply of Earth mast,
shield wire, clamps etc along with erection, stringing and termination of shield wire
etc shall be within the scope of the Contractor.
ii) Indicating light with all control and accessories for aviation if required shall also be
provided. Erection of aviation light and related control and accessories shall also be
within the scope of contractor if the same is required.
SUB-STATION EARTHING :-
This specification covers, design, engineering of sub-station earthing grid and supply,
delivery, installation, testing and commissioning of the same.
2. STANDARD :
The earthing grid for new sub-stations shall be designed in terms of IS:3043 and IEEE
Standard Documents Number 80-1986 or Latest version. However Earth mat design
based on uniform spacing method is to be submitted for approval for all sub-stations
Under any circumstances earth mat design based on any other alternative method other
than uniform spacing shall not be accepted.
3. DEVIATION :
Normally the offer should be as per Technical Specification without deviation. Any
deviation felt necessary to improve performance efficiency and utility of equipment must
be mentioned in the ‘Deviation Schedule’ with reasons duly supported by documentary
evidences and advantages of such deviation. Such deviation suggested may or may not
be accepted. But deviations not mentioned in Deviation Schedule will not be considered.
4. DESIGN CRITERIA :
For existing sub-stations contractor need not submit earth mat design calculation.
Contractor shall connect extended portion of earth mat with existing earth mat if
required.
5. INSTALLATION :
(i) The grounding grid shall be constructed by use of corrosion resistant mild steel rod.
(ii) For earth electrode, galvanised iron pipe of dia 40 mm. and length 3 m or more.
shall be used.
(iii) All non-current carrying steel/metal parts in the switchyard shall be connected to
the grounding grid including equipments except lightning arrestors, power
transformers, CVT/PT etc which shall be earthed directly through earth electrode.
This electrode shall in turn be connected to earthing grid through galvanised bolts
and nut. Each earthing lead from the neutral of the transformer shall be directly
connected to two galvanised pipe electrode treated earth pit which in turn shall be
connected to station earth grid. Contractor shall submit detail equipment earthing
drawing of all equipment along with detail pipe electrode drawing to be used in
conjunction with treated pit with test link, treated pit without test link and non-
treated pit and structure earthing drawings for approval of DPL.
(iv) All points in steel earthing system shall be made by welding except the points with
bolted connection which should be provided for separating the earthing grid for
testing purpose. The point for testing purpose should be so placed that the earth
grid can be frequently supervised.
(v) For rust protection, the welded surface shall be treated with Barium Chromate
Welded surface shall be painted with red lead and bitumen. All exposed steel
conductors shall be protected with bitumen paint. Riser (M.S. Flat) above ground
shall be painted with Zinc rich paint above anti oxide primer.
(vi) Earth pit of earth electrode shall be at least 450x300 mm. in size and 300 mm.
deep. The earth pit shall be constructed with RCC (M-20) in surrounding wall and
floor (minimum wall thickness 125 mm. and floor thickness 100 mm.) with a
removable cover slab of 75 mm. thick with RCC (M-20) (0.8% reinforcement by
volume of concrete). Cover slab shall be plastered with cement mortar (1:4) on all
sides.
(vii) To provide testing facility with Clip-on type earth resistance measuring meter one
test link with ACSR panther conductor having compression type joint with socket
of total length of about 300 mm. (combined) shall be incorporated between earth
pit and transformer, CVT/PT/LA etc. neutral connection as well as between earth
pit and earth mat connection. The socket shall be connected with the flat through
bimetallic strip. Two earth pits shall be provided for transformer neutral to be
connected through two nos. flat. One flat shall be directly connected to one earth
The contractor shall submit a preliminary design of sub-station lightning protection and
typical earthing mat design and earthing mat layout drawing showing connections with
different structures/equipment including earth pit drawing with each copy of tender to
facilitate evaluation of bid.
After placement of Letter of Award (LOA) the contractor shall furnish 6(six) copies of
design calculations of lightning protection and earthing mat and earth mat layout
drawings sub-station-wise showing connection of different equipment/structures to
earthing pit as well as to earthing mat .
6(six) copies of approved design calculation and drawing for each sub-station shall be
submitted for our record and distribution to site.
8. TEST :
All tests as required for successful commissioning of the system shall be carried out by
the contractor at site.