0% found this document useful (0 votes)
95 views

Part A: Performance Evaluation On Kras

This document provides a mid-year performance review for an employee. The employee's key result areas include operational activities, maintenance activities, data updating, diagnostic testing, and load monitoring/nodal activities. For each KRA, the employee was given a target, and their mid-year review comments that they have almost achieved 100% of the targets. Their individual KRA scores and overall part A score are provided. Signatures from the appraisee, reporting officer, and counter signing officer are required at various stages of the performance evaluation process.

Uploaded by

Shyamkant Mane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views

Part A: Performance Evaluation On Kras

This document provides a mid-year performance review for an employee. The employee's key result areas include operational activities, maintenance activities, data updating, diagnostic testing, and load monitoring/nodal activities. For each KRA, the employee was given a target, and their mid-year review comments that they have almost achieved 100% of the targets. Their individual KRA scores and overall part A score are provided. Signatures from the appraisee, reporting officer, and counter signing officer are required at various stages of the performance evaluation process.

Uploaded by

Shyamkant Mane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Part A: Performance Evaluation on KRAs

Sr. Key Result Area and corresponding KRA Target Mid Year Actual Rating Individual
No. Key Performance indicator Weigh Review: Achieve KRA Score
t(Tota Comment ment
l s
100%)
(8) = (3) X
1 2 3 4 5 6 7
(7)
Operational Activities:-
i) Carrying out of routine inspection of
sub-station equipment, panels, relays
Almost
etc. to avoid occurrences. Contin
1. 30 % 100%
ii) Keeping the records of Tripping and uous
achieved
outages.
iii) Carrying out Switching operational
activities as per given standards.
Maintenance Activities:
i) Avail all outages as per annual plan for
carrying out half yearly/routine
Almost
maintenance/diagnostic testing.
2. 15 % 100% 100%
ii) Adhere with maintenance schedule
achieved
for carrying out bay maintenance.
iii) Adhere with maintenance schedule
for carrying out ICT maintenance.
Data Updating in SAP:
Timely updating of SAP Data such as Almost
3. making IR/BD Notifications and timely 5% 100% 100%
intimations of the same. achieved

To carry out diagnostic testing such as CT Almost


4. Tan Delta, LA LCM, CB CRM, CB Timing, 30 % 100% 100%
DGA etc. as per routine frequency. achieved
Load Monitoring and Nodal activities:
i) Ensure grid safety and avoid
unwanted trippings due to
overloading by communicating
Programmed Load shedding and Force Almost
6. load shedding to Parbhani & Hingoli 20 % 100% 100%
District s/stns. achieved
ii) Keeping the records of Trippings,
PLS,FLS of Parbhani and Hingoli
District s/stns. And timely reporting to
concern authorities.
KRA Section Scores (sum of
Part A Score: individual KRA score)

Stage Appraise Reporting Officer Counter signing officer

Signature with date


Performance Planning Signature with date
(if required)
Signature with date
Signature with date
Mid Year Review Signature with date
(if required)
Signature with date

Year End Evaluation Signature with date


Signature with date Signature with date

You might also like