Part A: Performance Evaluation On Kras
Part A: Performance Evaluation On Kras
Sr. Key Result Area and corresponding KRA Target Mid Year Actual Rating Individual
No. Key Performance indicator Weigh Review: Achieve KRA Score
t(Tota Comment ment
l s
100%)
(8) = (3) X
1 2 3 4 5 6 7
(7)
Operational Activities:-
i) Carrying out of routine inspection of
sub-station equipment, panels, relays
Almost
etc. to avoid occurrences. Contin
1. 30 % 100%
ii) Keeping the records of Tripping and uous
achieved
outages.
iii) Carrying out Switching operational
activities as per given standards.
Maintenance Activities:
i) Avail all outages as per annual plan for
carrying out half yearly/routine
Almost
maintenance/diagnostic testing.
2. 15 % 100% 100%
ii) Adhere with maintenance schedule
achieved
for carrying out bay maintenance.
iii) Adhere with maintenance schedule
for carrying out ICT maintenance.
Data Updating in SAP:
Timely updating of SAP Data such as Almost
3. making IR/BD Notifications and timely 5% 100% 100%
intimations of the same. achieved