SD-24P Bit Record 2

This document provides details on 12 drilling runs using various drill bits to reach a total depth of 6,350 meters. The runs drilled through granite and sandstone/claystone formations. Significant milestones included setting 13 3/8-inch, 9 5/8-inch, and 7-inch casing strings. 8 1/2-inch drill bits were used for over half the total drilling time to reach the final total depth, establishing a new Vietnam drilling record.

Uploaded by

Them Bui Xuan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views

SD-24P Bit Record 2

This document provides details on 12 drilling runs using various drill bits to reach a total depth of 6,350 meters. The runs drilled through granite and sandstone/claystone formations. Significant milestones included setting 13 3/8-inch, 9 5/8-inch, and 7-inch casing strings. 8 1/2-inch drill bits were used for over half the total drilling time to reach the final total depth, establishing a new Vietnam drilling record.

Uploaded by

Them Bui Xuan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

CLJOC (Cuulong Joint Operating Company)

WELL: SD-24P B I T R E C O R D Spud In: 30/11/06 10:30 hrs RIG: (PUMP) UpDated 8/6/2020 9:29
Water Depth : 47.2m RTE - MSL : 44.85m

BIT BIT IADC TYPE SERIAL Jets/32 DEPTH DEPTH DRLG HRS TOTAL ROP Parameters M U D DEV. DULL CODE
RUN SIZE CODE MFGR NO. or IN OUT Bit On REVS / M/Hr WOB FLOW PRES. Wt. Visc. PV/YP W/L Cutting Structure Gauge POOH
# (in.) TFA (s.i.) (M.) (M.) (M.) Bottom / BIT last Run (Klbs) RPM (GPM) (PSI) ppg Funnel cc Inner Outer DULL LOC Bearing (1/16") other Reason LITHOLOGY/REMARK

SW

36" CASING SETTING DEPTH 161.00 0m = OPEN HOLE Phase

KCL/Polymer
1 16" 1.1.5 XR+CPS Smith MY3952 3 x 20, 1 x 18 161 161 0 0.00 0.00 0.00 15k 0 650 600 9.0 72 18/23 6.0 0° 0 0 NO A E I NO BHA GyroData survey at shoe.
2 Used 16" 1.1.5 XR+CPS Smith MY3952 3 x 20, 1 x 18 161 1539 1378 44.04 373k 30.84 15-45k 108-158 1000 2650 906.0 60 23/29 4.6 45° 4 3 WT A E 1 CT TD Sst, Clyst.

13 3/8" CASING SETTING DEPTH 1378 m = OPEN HOLE Phase

SOBM
3 12 1/4" M323 MRS519BHPX Smith JW1280 7 x 16 1539 2259 720 24.13 218k 29.84 4-20k 145-180 1000 3536 10.5 87 28/19 3.6 58° 0 1 LT M X I CT DTF Sst, Clyst.
4 Used 12 1/4" M323 MRS519BHPX Smith JW1280 7 x 16 2259 3644 1385 71.96 648k 19.23 23k 154 980 4036 10.5 87 28/19 3.4 54° 2 2 LT N X I CT TD Sst, Clyst.

9 5/8" CASING SETTING DEPTH 720 m = OPEN HOLE Phase

SOBM/BRINE/SW
5 8 1/2" 6.3.7 MXL-DS55DX2 HTC 5096381 3 x 14 3644 3983 339 22.93 271k 14.78 40 212 540 2708 9.6 26 69° 8 8 CR N F 2 CD PR Granite
6 8 1/2" 6.3.7 MXL-DS55DX2 HTC 6045489 3 x 14 3983 4392 409 33.71 370k 12.13 45 200 550 3000 9.6 79° 3 8 BT M E 1 WT HR Granite
7 8 1/2" 6.3.7Y GF45YOD1RDPD Smith MY1650 3 X 12 4392 4758 366 34.76 349k 10.53 45 183 500 3570 9.6 26 85° 8 8 LC A F 2 JD TQ Granite. Totally worn to jets.
8 8 3/8" 6.3.7 Mill Baker 56527 Open 4757 4758 1 3.50 2% worn, 1/16" u/gauge. No junk milled
9 8 1/2" 6.3.7 MXL-DSR 55DX2 HTC 5102680 3 X 12 4758 5098 340 30.12 357k 11.29 45-50k 207 450 2909 SW 82° 2 3 CT A E 1 WT HR Granite
10 8 1/2" 6.3.7 MXL-DSR 55DX2 HTC 5102681 3 x 16 5098 5697 599 46.21 486k 12.96 38-45 190 440 3210 SW 86° 5 8 LT A F 1 JD PP Granite
11 8 1/2" 6.3.7 GF45YOD1RDPD Smith MY1862 3 x 16 5697 6101 404 42.43 445k 9.52 45-50 190 440 3340 SW 83° 3 4 WT A E 2 CT/PN HR Granite. Piece of metal found in a jet.
12 8 1/2" 6.2.7 MXL-DSR 55DX2 HTC 5103254 3 x 16 6101 6350 249 18.31 199k 13.60 45 180 440 2960 SW 83° 2 3 BT A E 1 CT/PN TD Granite. Well TD. Vietnam record.

TD 2053 = OPEN HOLE Phase

TD 0m = OPEN HOLE Phase

Drill Time Analysis


16" DRLG
14%

TOTAL DRILL/CORE/PDC BITS USED : TD Reached on : After Days Total 8.5" DRLG
55% 12.25" DRLG
Phase: hrs cumul Phase: hrs cumul Phase: hrs cumul Phase: hrs cumul Phase: hrs cumul Phase: hrs cumul 31%

36" 0.00 0.00 26" 0.00 0.00 16" 44.04 44.04 12.25" 96.09 140.13 8.5" 171.23 311.4 6" 0.00 311.4
DRILLING / Coring: 12.97 days .... B.O.B. (Bit On Bottom) 311.36 NOT INCLUDED TIME FOR D.O.C & H.O. INC Total Meterage Drilled / Cored =