0% found this document useful (0 votes)
12 views

Action of RM

This document contains an action plan from SABCI to address 4 problems in their Warehouse, Management, Production, and Management Representative departments. The plan details removing unused materials from the Warehouse by March 2020, discussing an internal audit finding with an ISO auditor by May 2020, increasing daily wages for emulsion production workers, and closing non-conformances by preparing a new document after a management review meeting by March 2020.

Uploaded by

Shahbaz Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

Action of RM

This document contains an action plan from SABCI to address 4 problems in their Warehouse, Management, Production, and Management Representative departments. The plan details removing unused materials from the Warehouse by March 2020, discussing an internal audit finding with an ISO auditor by May 2020, increasing daily wages for emulsion production workers, and closing non-conformances by preparing a new document after a management review meeting by March 2020.

Uploaded by

Shahbaz Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

QF-90 Rev-00

SABCI
MRM action plan

Sr Problem Department Action plan Comple Status Remarks


# tion
date
1 Shortage of space Warehouse Remove all Henkel March
materials from hall 2020
and other sides
which are not
useable.
2 one Internal audit Management Discuss with ISO May 2020
one management representative auditor and explain
review meeting situation to him and
and 1 external convince him
audit in calendar
year
3 Increase of daily Production and Increase daily wages Next
wages workers administration labor when we have emulsion
during emulsion emulsion orders for production
production week or more then
week
4 Closing of NC Management After Management March
representative review meeting we 2020
prepare new
document which
have all problem
detail and action
plan according to
management review
meeting,

You might also like