1.2 - CT (Metering) - Core-2 - Line
1.2 - CT (Metering) - Core-2 - Line
Customer: PGCB
Project: DESIGN,SUPPLY,INSTALLATION,TESTING
AND COMMISSIONING OF 132/33KV
SUBSTATIONS ON TURNKEY BASIS
(PACKAGE-2.1)
Station: GHATAIL 132/33KV NEW AIS
SUBSTATION
Feeder: RPCL-1/2(LINE BAY-01)
Nominal Frequency: 50 Hz
Rated Burden: 15 VA
Manufacturer: ABB
Manufacturer: CEWE
2 | Page
CT requirements for metering:
Requirement 1:
The current transformer for metering must have an effective instrument security factor FS’ that is
smaller than the value of the equations below
(𝑅𝑐𝑡 + 𝑅𝑁 )
𝐹𝑆 ′ = 𝐹𝑆 × 𝑆 ≤ 𝐼𝑝𝑜 (Requirement 1)
𝑅𝑐𝑡 +𝑅𝑙 + 2𝑅
𝐼𝑟
Requirement 2:
The ratio of actual burden to rated burden should be the value of equations below:
𝑆
(𝑅𝑐𝑡 +𝑅𝑙 + 2𝑅 )
𝐼𝑟 )
25% ≤ (𝑅𝑐𝑡 + 𝑅𝑁 )
≤ 100% (Requirement 2)
Where,
3 | Page
Requirement 1:
10 + 15
𝐹𝑆 ′ = 5 ×
10 + 1.10721 + 0.0121
𝐹𝑆 ′ = 11.24 ≤ 50
10+1.1072+0.0121
Requirement 2: Ratio =
10+15
= 44.48%
Requirement 1:
5 + 7.5
𝐹𝑆 ′ = 5 ×
5 + 1.10721 + 0.0121
𝐹𝑆 ′ = 10.2136 ≤ 50
5+1.10721+0.0121
Requirement 2: Ratio =
5+7.5
= 48.95%
4 | Page
Therefore, Ratio=48.95 % and fulfills requirement 2
5 | Page