Manual Adva FSP 150cc 825
Manual Adva FSP 150cc 825
TM
Optical Networking
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 1/30
8/9/2019 Manual ADVA FSP 150CC-825
All rights reserved. Hardware and software mentioned in this document includes software developed by
ADVA AG Optical Networking ("ADVA"), the Apache Software Foundation (http://www.apache.org), Te-
odor Danciu (http://jasperreports.sourceforge.net), and/or other open source software. Some software was
created using ORBacus for Java by Object-Oriented Concepts, Inc.
Trademarks
The terms ADVA, FSP, Etherjack and the Etherjack logo are trademarks or registered trademarks of ADVA
in the United States, Germany and/or other countries. All other company, product, or service mentioned in
this document may be trademarks or service marks of ADVA or their respective owner.
Patents
The content described in this document may be covered by patents or pending patent applications of ADVA.
The furnishing of this document does not give you any license to these patents.
Disclaimers
The content of this document could include technical inaccuracies or typographical errors, and is subject to
change at any time without notice. Reliance on this content is at the relying party's sole risk and will not
create any liability or obligation for ADVA. Any references in this document to non-ADVA publications
and/or non-ADVA Internet sites are provided for convenience only and do not in any manner serve as an
endorsement of those publications and/or Internet sites. The materials within those publications and/or In-
ternet sites are not part of the materials for any ADVA information, product or service, and use of those
publications and/or Internet sites is at your own risk.
THE CONTENT OF THIS DOCUMENT IS PROVIDED ''AS IS'' AND ANY EXPRESSED OR IMPLIED
WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MER-
CHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO
EVENT SHALL ADVA, ITS AFFILIATES, EMPLOYEES, OFFICERS OR ITS SUPPLIERS BE LIA-
BLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUEN-
TIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE
GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION)
HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT
LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY
OUT OF THE USE OF THIS DOCUMENT, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH
DAMAGE. THE SAME APPLIES FOR ANY HARDWARE OR SOFTWARE COVERED BY THIS
DOCUMENT, UNLESS A SIGNED AGREEMENT WITH ADVA OR THE APPLICABLE PRODUCT
LIABILITY LAW EXPRESSLY STATES OTHERWISE.
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 2/30
8/9/2019 Manual ADVA FSP 150CC-825
TM
Optical Networking
1.1 Introduction
This document provides step by step procedures to help you locally provision the FSP
150CCf-825 Network Interface Device (NID) to a simple back-to-back configuration. When the
procedures in this document have been completed, the FSP 150CCs will be provisioned from
its default configuration to the following configuration (see Figure 1):
• VLAN-based WAN management tunnel with PPP layer 2 protocol, DHCP disabled and
RIP V2 packets enabled
GNE #1
FSP 150CC WAN SNE #2
FSP 150CC
LAN(s) PSU1 PSU2 Management 2 4 Access Network FSP150 CCf PSU1 PSU2 Management 2 4 Access Network FSP150 CCf
LAN(s)
Status Status Critical RS- 4 Status Status Critical RS- 4
Major 232 Lk Rate Lk Rate Lk Rate 232 Lk Rate Lk Rate Lk Rate
3 Major 3
Etherjack TM Minor Active Active
100- 2 Etherjack TM Minor 2
LAN 2 100- LAN 2
240VAC Status 1 240VAC Status 1
1 1
1 3 5 1 1 3 5 1
2 2
RIP Enabled
Management Tunnel
80000003806 Rev 1.0 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL Page 1
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 3/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
All other features will utilize the system default configuration. If your desired configuration
varies from this basic configuration, then provisioning is required. If this is the case, refer to the
FSP 150CCf-825 Installation and Operations Manual for provisioning data and procedures.
For CLI provisioning and CLI command structure information, refer to the FSP 150CCf-825
Etherjack OS (EOS) Command Line Interface Handbook.
Audience
The reader must have sufficient knowledge of the following when using this document:
• IP addressing
• 24 X 7 telephone support
• On-site support
• Technical training, both on-site and at ADVA facilities in Germany and the USA
Page 2 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 4/30
8/9/2019 TM
Manual ADVA FSP 150CC-825 FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008
Optical Networking
Power Requirements
The system is powered by dual AC and/or DC Power Supply Units (PSUs). PSUs can be of
similar type or mixed, and are hot swapable. It can be equipped with two AC modules, two DC
modules, or one of each. They are physically accessed at the front of the unit and source
connections are located on the front of each PSU module.
Optionally, a third possible power source, an external AC to 12 VDC power converter, may be
used. The 12 VDC power converter may be used alone, or mixed with AC and/or DC power
supply modules. It is physically connected at the rear of the unit. AC power converters may be
ordered separately for North American and international location.
If an external AC power converter and/or one PSU module fails - or its input source fails, the
remaining module continues to power the system without interruption to system function.
Note: The power supplies are not designed to operate in load-sharing mode.
AC Supply
The system operates with an AC source fused at 15A, with the voltage range specified in ANSI
specification C84.1-1989, Voltage Ratings (60 Hz) for Electric Power Systems Equipment,
Range B. The FSP 150CCf-825 can tolerate any frequency within the range of 60 (+/-3) Hz for
North American applications, and the range of 50 (+/-3) Hz for European applications. The
maximum power consumption from the 230 VAC supply is 40W.
DC Supply
The DC power connector is a 3-pin socket (Battery, Return, Frame Ground) which includes a
mated connector, providing protection against improper (reversed polarity) connection at the
NID. The maximum power consumption from the -48 VDC supply is 40W. External fuse rating
80000003806 Rev 1.0 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL Page 3
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 5/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
is 5A.
The FSP 150CCf-825 operates properly when supplied with minimum and maximum operating
voltages for North American and International applications, as shown in Table 1-1.
• Screwdriver
• Wire wrap tool
• Wire cutters
• Wire strippers
• Volt meter
• Fuse panel
For optical cabling installation, you will need the following items for this procedure:
• Optical Power Meter
• Fiber Cleaner
Page 4 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 6/30
8/9/2019 TM
Manual ADVA FSP 150CC-825 FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008
Optical Networking
Procedure
If additional FSP 150CCs are to be stacked above each other, are installed above heat
producing components, or are installed below heat sensitive components, some FSP
150CC variants require that heat deflector(s) are installed. Install air deflector(s) as
described in Table 2.
Does/will the FSP 150CCf-825 include a DC power Continue with the next step.
supply unit?
Does/will the FSP 150CCf-825 NOT include a DC Go to Step 17.
power supply unit?
DANGER — Avoid the risk of electrical shock. Follow local procedures for working with
electrical power. High voltage may be present in the following tasks. Shut off the power
from the power source or turn off the circuit breakers before proceeding. Use properly
insulated tools when working with power connections. Do not allow any metal objects
to connect across power terminals.
80000003806 Rev 1.0 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL Page 5
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 7/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
Step 5 Verify that the office DC power supply is set up to deliver the correct operating voltage
to the FSP 150CCf-825 (between -40.5 and -72 VDC). Verify that the correct fuse or
breaker (5 A rating) is installed at the power supply source and that power is turned
off. Repeat for a second DC power supply source, if present.
Step 6 Using a volt meter, measure the voltages at the source power supply terminals. Verify
that no voltage is present. Repeat for a second DC power supply source, if present.
Step 7 Run the DC power cables (shipped with the power supply unit) from the FSP
150CCf-825 to the office battery terminals. Dress the power cables. Repeat for a
second DC power supply unit, if present.
Step 8 Remove the blank PSU front panel, then insert the DC power supply unit into the front
panel. Repeat for a second DC power supply unit, if present. If the second PSU slot
is unused, ensure that a blank PSU card is inserted into the slot. Tighten the thumb
screws on both PSU slots.
Step 9 Connect the green Frame Ground wires to the Frame Ground terminal. Repeat for
a second DC power supply unit, if present.
Step 10 Connect the black Office Return wires to the RTN DC power supply terminals.
Repeat for a second DC power supply unit, if present.
Step 11 Connect the red Office Battery wires to the BATT DC power supply terminals. Repeat
for a second DC power supply unit, if present.
Step 12 Verify that all power terminal connections are tight and that no strands of wire are
shorting terminals together. Repeat for a second DC power supply unit, if present.
Step 13 Reconnect the office power source (reinstall fuses, reset breakers or turn on supply).
Repeat for a second DC power supply unit, if present.
Step 14 Use a volt meter to verify the A side power and ground at the power terminals. Ensure
that the voltage between BATT and RTN terminals measures between -40.5 and -72
VDC. Repeat for a second DC power supply unit, if present.
Step 15 Using a volt meter, measure the voltage between RTN and Frame GND terminals.
Verify that 2 VDC or less is present. Repeat for a second DC power supply unit, if
present.
Step 16 Connect the power cables to FSP 150CCf-825 front connectors (red wire / connector
release tab oriented at the bottom). Repeat for a second DC power supply unit, if
present.
The power supply Status LED should illuminate green. During the power cycle, the
front panel Status LED will illuminate red for approximately 1 minute, then will change
to solid green.
Page 6 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 8/30
8/9/2019 TM
Manual ADVA FSP 150CC-825 FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008
Optical Networking
Does/will the FSP 150CCf-825 include an AC power Continue with the next step.
supply unit at the front panel?
Does/will the FSP 150CCf-825 NOT include an AC Go to Step 22.
power supply unit at the front panel, but a 12 VDC
rear connector power adapter will be used?
Only DC power will be used in this installation? Go to Step 23.
Step 18 Run the AC power cable (shipped with the FSP 150CCf-825 power supply unit) from
the FSP 150CCf-825 to the AC power outlet, externally fused at 15A. Dress the power
Step 20 Insert the power cable into the PSU front connector. Then insert the power cable into
the AC power outlet. Repeat for a second AC power supply unit, if present.
The power supply Status LED should illuminate green. If AC power is the only power
source: During the power cycle, the front panel Status LED will illuminate red for
approximately 1 minute, then will change to solid green.
Will a rear accessible 12 VDC power adapter be Continue with the next step.
used?
No rear accessible 12 VDC power adapter will be Go to Step 23.
used?
Step 22 Connect the power adaptor cable to the power connector ( PWR) located at the rear
panel, connect the power cord into the power adapter, then plug the AC adaptor to
an AC (120V or 240V) wall outlet, externally fused at 15A.
If this is the only power source: During the power cycle, the front panel Status LED will
illuminate red for approximately 1 minute, then will change to solid green.
80000003806 Rev 1.0 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL Page 7
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 9/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
Step 24 Run the MGMT LAN port cable and metallic LAN port cables to the FSP 150CCf-825,
as required. Temporarily secure the cables.
Step 25 Connect a LAN Cable to the MGMT LAN port and connect the other end of the cable
to your networking gear (PC, hub, switch, or router). From the factory, the default IP
address of the FSP 150CCf-825 is: 192.168.0.2/24.
Are you only installing fiber optic WAN and LAN Go to Step 36.
cables, and no metallic cables are to be installed?
Are metallic WAN or LAN cable terminations Continue with the next step.
Step 27 For metallic WAN interface(s): Connect the WAN cable(s) to the designated WAN
port(s) using a Cat 5 LAN cable (RJ-45 connector). Otherwise, go to the next step.
Are only metallic cable terminations required for this Go to Step 36.
FSP 150CCf-825 and cabling is complete?
Are you installing any fiber optic cables? Continue with the next step.
Page 8 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 10/30
8/9/2019 TM
Manual ADVA FSP 150CC-825 FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008
Optical Networking
WARNING — Prevent damage to fiber optic cables. Do not bend fiber optic cables to
a radius less than 50 mm.
WARNING — To avoid damage to optical receivers, do not connect any fibers until
instructed to do so. Always check optical levels before connecting fiber optic cables.
Step 31 Run the optical fiber cables to the FSP 150CCf-825. Do not connect the cable(s) to
the FSP 150CCf-825 connectors at this time. They will be connected later.
Step 32 Dress all fiber optic cables. Use local practices for protecting all cables and
connectors.
Step 34 Measure the transmit and receive levels of the fiber optic cables and record them for
future reference.
Step 35 Connect the optical interface cables to the appropriate WAN and/or LAN SFP
connectors on the front panel.
Step 36 Observe the client LAN LED(s) and refer to FSP 150CCf-825 Installation and
Operations Manual for LED descriptions. If the LAN LED(s) indicate anything other
than the appropriate response for the current state, troubleshoot as necessary.
Step 37 Observe the WAN (Network) LED and refer to FSP 150CCf-825 Installation and
Operations Manual for LED descriptions. If the WAN LED(s) indicate anything other
than the appropriate response for the current state, troubleshoot as necessary.
End of Procedure
80000003806 Rev 1.0 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL Page 9
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 11/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
• Category 5 LAN cable (with RJ-45 connectors) for Serial Port RS-232 connection
(included in the FSP 150CC kit)
GNE SNE
FSP 150CC #1 FSP 150CC #2
PSU1
Status
PSU2
Status
Major
Management
Critical RS-
232
2 4
4
3
Access
Lk Rate Lk Rate
Network
Lk Rate
FSP150 CCf
WAN PSU1
Status
PSU2
Status
Management
Critical
Major
RS-
232
2 4
4
3
Access
Lk Rate Lk Rate
Network
Lk Rate
FSP150CCf
Management Tunnel
System VLAN Based, VLAN ID = 100 System
Proxy ARP = Enabled Layer 2 Protocol = PPP Proxy ARP = Disabled
Default Router = 192.168.2.1 DHCP = disabled Default Router = None
RIP V2 Packets = enabled
MGMT LAN Port MGMT LAN Port
IP Address = 192.168.2.2 IP Address = 192.168.2.3
Subnet Mask = 255.255.255.0 Subnet Mask = 255.255.255.0
Static Route
Interface = WAN
IP Address = 0.0.0.0
Subnet Mask = 0.0.0.0
eVision Workstation
IP Address = 192.168.2.5
Subnet Mask = 255.255.255.0 GNE = Gateway Network Element
Default Gateway = 192.168.2.1 SNE = Subtending Network Element
Page 10 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 12/30
8/9/2019 Manual ADVA FSP 150CC-825
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 13/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
Encapsulation: Ethernet
IP Address: 0.0.0.0
RIPv2: Disabled
Step 7 Enter show this followed by a carriage return to verify the changes.
Step 9 Enter the IP address and subnet mask, by entering configure system followed by a
carriage return. A next level prompt will appear. Then enter ip-address <address>
<subnet mask>.
config:sys -->
Page 12 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 14/30
8/9/2019 TM
Manual ADVA FSP 150CC-825 FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008
Optical Networking
Step 10 Verify the changes by entering show ip followed by a carriage return. The
Management LAN port IP information displays:
System IP Information:
IP Address: 192.168.2.3
Default Gateway:
WARNING — Do not remove power while performing the next step. Removing power
while the operation in progress may corrupt the database.
Step 11 Enter database save followed by a carriage return. The system will display a warning
message and when complete, the CLI prompt will appear, as shown below:
config:sys -->
Verify the local Management LAN port communication settings by accessing the FSP 150CC’s
eVision Web Browser Management Tool. Perform the following steps:
Step 14 Change your PC IP address to successfully access the FSP 150CC’s Management
LAN port IP address.
Step 15 Use an Ethernet Category 5 LAN cable to connect your PC to the FSP 150CC
Management LAN port. Refer to the FSP 150CCf-825 Installation and Operations
Manual for the Management LAN port connector location, if required.
Step 16 Activate an Internet Explorer web browser on your PC by double clicking on the
shortcut icon.
Step 17 Enter the FSP 150CC’s Management LAN port IP address in the web browser
address field and enter return.
A security alert window will appear
80000003806 Rev 1.0 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL Page 13
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 15/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
Page 14 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 16/30
8/9/2019 TM
Manual ADVA FSP 150CC-825 FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008
Optical Networking
Note: If a login error appears, re-enter the user ID and password. Up to 3 login attempts
will be processed. On a failed third attempt, the web browser will redirect to a 401
error page (Unauthorized error). If this occurs, the login process must be
re-started by going back to the web browser home page and re-entering the FSP
150CC IP address (at Step 17).
80000003806 Rev 1.0 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL Page 15
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 17/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
Menu Bar
System
Name
Menu Tree
View Tabs
Entity
View Area
Step 22 Expand nested items in the System Name entity by selecting the “+” next to the
System Name entity in the menu tree (default is FSP150CCf-825).
Page 16 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 18/30
8/9/2019 TM
Manual ADVA FSP 150CC-825 FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008
Optical Networking
80000003806 Rev 1.0 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL Page 17
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 19/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
Step 25 Use the following WAN interface options (as applicable) to provision the WAN
interface with the minimal WAN interface provisioning options required prior to setting
up WAN port communications (see Chapter 5 of the FSP 150CCf-825 Installation
and Operations Manual for WAN interface configuration options and rules):
Table 1-2 Minimum WAN Interface Provisioning via CLI Commands
Command Description
WAN Port
adminstate Defines the WAN facility administrative state.
media Defines the WAN interface media type.
speed Defines the line rate of the Ethernet port and whether it is in half duplex or full duplex mode.
Step 28 Right-click on MGMT Tunnel [WAN] and select Edit Mgmt Tunnel.
The Management Tunnel view displays
Page 18 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 20/30
8/9/2019 Manual ADVA FSP 150CC-825
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 21/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
Step 45 Select the new User name and view the new user information to verify new user entry.
(The new user password is not displayed for security reasons.)
Step 46 Activate a new Internet Explorer web browser window on your PC by double clicking
on the shortcut icon.
Step 47 Enter the FSP 150CC’s Management LAN port IP address in the web browser
address field and enter return.
The Login Screen will appear
Step 48 Enter the new Super User’s user name and password and select OK.
The eVision Web Browser Management Tool displays
Step 49 Expand the System Name, Administration and Users entities by selecting the “+” next
to each entity.
Step 50 Enter a right click on the root user and select Delete User . Then select OK.
The default root user is removed from the menu tree
Step 51 If desired, enter other users by repeating Step 41 through Step 45.
Step 52 If SNMP provisioning is not required, go to Step 59. Otherwise continue with the next
step to provision SNMP.
Step 53 Right click on the SNMP entity in the menu tree and select Add Community.
The add community screen appears
Step 54 Enter the desired Community Name, select the desired Access Type and then
select Add.
The new community information is displayed
Step 55 Right click on the SNMP entity in the menu tree and select Add Target Address.
The add target address screen appears
Step 56 Select the desired Security Model and Credentials. Enter the desired IP Address and
port. Then select Add.
Step 57 Select the Target Addresses tab to verify the entry.
Page 20 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 22/30
8/9/2019 TM
Manual ADVA FSP 150CC-825 FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008
Optical Networking
Step 59 Right click on the Communications entity in the menu tree and select Create Static
Route .
The create static route screen appears
Step 60 For Route Type, select Interface, and for Interface, select Wan.
Step 61 For IP Address, enter 0.0.0.0.
Provision LAN(s)
Step 65 Right click on the Local Management Port and select Edit Facility.
The edit Local Management Port screen appears
80000003806 Rev 1.0 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL Page 21
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 23/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
Step 67 Select OK (communications will be dropped and the configuration will need to be
saved using CLI, as described in the following steps).
Note: The browser will appear to stay busy after OK is selected because it is
attempting to reach the IP address of the FSP 150CC who’s Local
Management Port has just been disabled.
Step 68 Install the console cable between the FSP 150CC RS-232 Port and a PC using the
RJ-45 cable and the DB-9 converter.
Step 69 From the PC, start a communications utility application, such as HyperTerminal with
the following COM port settings:
Note: The Serial Console Port supports only 9600 baud. Do not use Autobaud.
Step 70 Hit the “Enter” key and you will be prompted to enter a login and password. The
default login and password are ‘ root’ and ‘ChgMeNOW,’ respectively. A warning
banner displays and the user is prompted to reply [Y|N]. Enter “y” and the serial
console CLI prompt (-->) is displayed.
Step 71 Enter show interface mgmt-lan followed by a carriage return. The DHCP setting will
display, as shown below. Verify that the Administration State is set to Disabled.
MTU: 1500
DHCP: Disabled
RIPv2: Disabled
Page 22 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 24/30
8/9/2019 TM
Manual ADVA FSP 150CC-825 FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008
Optical Networking
WARNING — Do not remove power while performing the next step. Removing power
while the operation in progress may corrupt the database.
Step 72 Enter database save followed by a carriage return. The system will display a warning
message and when complete, the CLI prompt will appear, as shown below:
-->
Step 74 Remove any commissioning cables (Ethernet cable and/or console cable) from the
FSP 150CC front panel connectors, as required.
Step 75 Verify that the WAN cable is connected to the FSP 150CC WAN port.
Provision the FSP 150CC’s IP Address, WAN Interface, WAN Management Tunnel, New
Super User and SNMP
CAUTION — Do not enable Proxy ARP if both units are connected to the same LAN
via the Management LAN port. Otherwise, there will be multiple ARP responses for a
single ARP request for a remote reachable IP address from each NE/FSP 150CC in
the same LAN that has Proxy ARP enabled.
80000003806 Rev 1.0 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL Page 23
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 25/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
Step 81 Save the configuration in eVision by selecting File and then Save Changes from the
menu bar.
Step 82 Verify that the WAN cable is connected to the FSP 150CC WAN port.
Step 83 Observe the WAN LED (and in the case of SONET/SDH 1+1 protection, the WAN 2
LED) on the front panel of each FSP 150CC. If the WAN LED(s) indicate anything
other than the appropriate response for the current state, troubleshoot the WAN
connections between FSP 150CC #1 and FSP 150CC #2 as necessary (refer to the
FSP 150CC Installation and Operations Manual for LED descriptions for each FSP
150CC variant).
Step 84 Flush ARP cache on the PC by opening a DOS window (select Start and then Run),
entering ARP -d and then selecting OK.
Step 85 Verify connectivity to FSP 150CC #2. Open an Internet Explorer web browser window
and enter the IP address of FSP 150CC #2. Logon using a valid user name and
password.
Step 86 Remove any commissioning cables (Ethernet cable and/or console cable) from the
FSP 150CC front panel connectors, as required.
End of Procedure
Page 24 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 26/30
8/9/2019 TM
Manual ADVA FSP 150CC-825 FSP 150CCf-825 Quick Start Guide
Release 2.1 December 2008
Optical Networking
the
andeVision
ensure web browser.
that they meetItthe
is recommended
FSP 150CC’s that you pre-determine
provisioning rules prior the provisioning
to making details
changes to a
LAN or placing an additional LAN into service. Ensure that CIR, EIR and C-Tag/S-Tag VLAN
ID-Priority tuple values will not conflict with another LAN/Flow that is in the Assigned state.
Refer to Chapter 5 of the FSP 150CCf-825 Installation and Operations Manual to determine
the default values, value ranges and rules for each option in the following procedure.
Procedure
eVision
WARNING — Changing EVC Mode on a facility will drop all traffic on the port,
including Management Tunnel connectivity and Maintenance End Points.
Step 3 Enter a right click on the LAN facility and select CO Mode (Connection-oriented
Mode).
A warning screen appears, indicating selection of this option will cause a loss of all
traffic
80000003806 Rev 1.0 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL Page 25
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 27/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
Step 5 Go to Step 8.
Step 6 Enter a right click on the LAN facility and select CO Transparent
(Connection-oriented Transparent mode).
A warning screen appears, indicating selection of this option will cause a loss of all
traffic
Step 8 Right click on the LAN facility in the Menu Tree and select Edit Facility.
An edit Transparent LAN facility window appears
Page 26 Copyright © 2008 ADVA Optical Networking - CONFIDENTIAL 80000003806 Rev 1.0
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 28/30
8/9/2019 Manual ADVA FSP 150CC-825
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 29/30
8/9/2019 FSP 150CCf-825 Quick Start Guide Manual ADVA FSP 150CC-825 TM
If C-Tag Control is set to None, only one LAN port may be used in the system.
Note 6: All C-Tag and S-Tag VLAN ID-Priority tuple values must not conflict on the WAN
port. (For example: A service with C-Tag PUSH 100-0, S-Tag PUSH 100-0 will
conflict with another service with the same C-Tag and S-Tag. A service with
C-Tag PUSH 100-0, S-Tag None will conflict with another service with C-Tag
None, S-Tag PUSH 100-0. A TLS service with C-Tag PUSH 100-0, S-Tag
NONE will conflict with a Flow with VLAN Member 100-0, C-Tag NONE and
S-Tag NONE.)
Note 7: If C-Tag or S-Tag Control is set to None, C-Tag / S-Tag VLAN ID and VLAN
Priority cannot be entered.
Step 11 Observe the current LAN facility Assigned/Unassigned State: (The LAN facility
should still be selected in the menu tree.)
Step 12 Determine the next step.
eVision
Enter a right click on the LAN facility in the menu tree and select Assign
A confirmation window appears
Select OK
The LAN facility status window appears and the LAN Assigned/Unassigned State
is Enabled
Note: If you receive an error message indicating the CIR and/or EIR values exceed
the maximum allowed, and/or the C-Tag/S-Tag VLAN ID-Priority tuple values
conflict with existing ones, then one or more LAN values must be changed in
order to co-exist. These changes must be made by editing the LAN(s) prior to
placing this LAN to the Assigned state.
Step 14 Save the configuration in eVision by selecting File and then Save Changes from the
menu bar.
End of Procedure
http://slidepdf.com/reader/full/manual-adva-fsp-150cc-825 30/30