0% found this document useful (0 votes)
38 views

Curing

The concrete blocks must cure in molds for 24 hours, then be placed in a water tank for two weeks to gain compressive strength through curing. Once enough blocks are cured, the business can advertise through local newspapers and a website to publicize and sell the blocks.

Uploaded by

damith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views

Curing

The concrete blocks must cure in molds for 24 hours, then be placed in a water tank for two weeks to gain compressive strength through curing. Once enough blocks are cured, the business can advertise through local newspapers and a website to publicize and sell the blocks.

Uploaded by

damith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

 Curing:

 The concrete block need to be kept in the mold for 24 hours for drying. Then remove the concrete block from the mold and
put it in a water tank for curing. The curing process will provide the required compressive strength and will take around two
weeks.
 Publicity and selling: Once you have sufficient numbers of concrete block you can place a small local newspaper ad
and build a website regarding your service.

You might also like