Sampling Station: Source: Sampling Date: Testing Date:: Determination of Ten Per Cent Fines Value (TFV)

This document summarizes test results for determining the ten percent fines value (TFV) of base coarse material from the Hazii-Crusher 2 Stock2 source for the Chancho-Derba-Becho Project. Testing was conducted on unsoaked and soaked samples based on BS-812-111 methods. The TFV was calculated as 244 kN for unsoaked samples and 190 kN for soaked samples, with a wet/dry ratio of 78%.

Uploaded by

Tewodros Tadesse
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views2 pages

Sampling Station: Source: Sampling Date: Testing Date:: Determination of Ten Per Cent Fines Value (TFV)

This document summarizes test results for determining the ten percent fines value (TFV) of base coarse material from the Hazii-Crusher 2 Stock2 source for the Chancho-Derba-Becho Project. Testing was conducted on unsoaked and soaked samples based on BS-812-111 methods. The TFV was calculated as 244 kN for unsoaked samples and 190 kN for soaked samples, with a wet/dry ratio of 78%.

Uploaded by

Tewodros Tadesse
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Determination of Ten per cent fines value (TFV)

PROJECT NAME:Chancho-Derba-Becho Project

EMPLOYER CONSULTANT CONTRACTOR

ERA CORE ERCC

TEST METHOD BS-812 - 111

Sampling Station : 5+400 RHS offset 200m Source : Hazii-Crusher 2 Stock2

Sampling Date : 3/3/2014 Visual Description Base Coarse

Testing Date : 7/3/2014

Specification Limits : For Base-Coarse = 110KN Min.

Min. Wet/dry ratio(%)=75%

Condition of testing
Unsoaked Unsoaked Soaked Soaked

Maximum force (f) [kn] 274.6 267.8 214 217.5

Mass of Dry Specimen (M1) [gm] 2059.0 2059.0 2024 2070

Mass of material retain 2.36mm (M2) [gm] 1811.0 1822.0 1801 1810

Mass of material passing 2.36mm (M3=(M1-M2)) 248.0 237.0 223.0 260.0

% passing 2.36mm ((M3/M1)*100)) [%] 12.0 11.5 11.0 12.6

Avrage % of material passing the 2.36 mm (m) [%] 11.78 11.79

Ten per cent fines value ((14*f)/(m+4)) [kN] 244 kN 190 kN

% Ratio Socked and Unsocked condition (%) 78 %

REMARK:

Tested by Checked By Approved By


Before using this document, make sure that it is the latest version. 2
Contractor Consultant Consultant

Before using this document, make sure that it is the latest version. 2