Summary Project Cost: A. Direct Cost No. Description Grand Amount
1. The document outlines the direct and indirect costs of a project with a total base price of Rp1,582,690,200. 2. Direct costs include basic price resources of Rp1,047,742,500 and basic price fuel of Rp474,075,000 for a total of Rp1,521,817,500. 3. Indirect costs include items like PPE & safety equipment, HES programs, and office supply for a total of Rp60,872,700 and 0.04% of the total base price.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
70 views1 page
Summary Project Cost: A. Direct Cost No. Description Grand Amount
1. The document outlines the direct and indirect costs of a project with a total base price of Rp1,582,690,200. 2. Direct costs include basic price resources of Rp1,047,742,500 and basic price fuel of Rp474,075,000 for a total of Rp1,521,817,500. 3. Indirect costs include items like PPE & safety equipment, HES programs, and office supply for a total of Rp60,872,700 and 0.04% of the total base price.
TOTAL BASE PRICE (ITEM A + B ) Rp 1.582.690.200,00
Nilai Project COCS Rp 10.000.000.000 Insurance Rp 27.500.000 Performance Bond Rp 500.000.000 WorkingCapital Rp 200.000.000 Cost of Money Rp 13.750.000 TOTAL TECHNICAL COST (MODAL) Rp 4.497.975.500 Overhead Rp 224.898.775,0 Profit Rp 1.349.392.650,0 With Holding Tax Rp 134.939.265 TOTAL FIX COST Rp 6.207.206.190