Abdul Rehman: Profile Summary
Abdul Rehman: Profile Summary
Electrical Engineer with 6.5 years of expertise in Power System Studies, Electrical Designing, Project Planning
Technical Support, Site Management and Client Liaison.
PROFILE SUMMARY: -
Professional experience across Power System Studies, Planning and Team Management.
Strong understanding of conducting Power System Studies, Load Flow Analysis, Short Circuit Analysis,
Technical loss Analysis, Harmonic Analysis, Relay Co-ordination, Motor Starting Analysis, Transient
Stability, Insulation Coordination etc for Captive power plant, various industries and utilities.
Bus breaker modeling and preparing database for protection coordination.
Present worth calculations, real time technical losses in the system.
Cable sizing and transformer sizing calculations. Datasheets for transformers and circuit breakers.
Preparation of cost estimation for various materials and preparation of BOM/BOQ.
Developing full-scale project plans and associating communications documents. Effectively communicating
project expectations to team members and stakeholders in a timely and clear fashion.
Meetings with clients, providing training and completing User Acceptance Test (UAT)/SAT.
Fetching and Correction/Updation of data in Oracle SQL.
Proficient in electrical software like E-TAP, PSCAD, PSS/E, MiPower, MiPSCT, MiPDAP, CYME, MATLAB and
AutoCAD.
PROFESSIONAL EXPERIENCE: -
Projects undertaken: -
Senior Engineer
Projects undertaken: -
● Preparing the database for Protection Database Management System and Protection Setting
Calculation Tool.
● Bus breaker modeling of Power substation 400/220/132/33 kV S/S in MiPower/MiPSCT.
● Conducting power system studies for various utility networks (Transmission & Distribution networks)
like Load flow analysis, short circuit study, Transient stability & Relay Co-ordination.
● Monitor & Guide to Client and Utility in Power system studies using MIPDAP Software and Co -
ordinate between Client, Utility and PRDC Head Office to meet day to day new requirement and
Challenges.
● Distribution feeder and LT network analysis, Transformer Relocation and Substation Proposal.
● Work closely with integrating team; delivery manager and development team so that integration of
application goes through smoothly and project is signed off in planned schedule.
● Give inputs and review the user manuals: Coordinate with client development team and solve/escalate
any integration issues.
Project Engineer
Projects undertaken: -
● Designing of Power substation 33/11/6.6 kV S/S, HT and LT Lines and DTR arrangements.
● Distribution system planning (11/0.433KV) and designing for reduction of power system network loss
and providing efficient voltage regulation with technical proposal for strengthening of electrical
network, with the aim of reducing AT&C loss for 5 years master plan using CYMDIST software.
● Conducting the power system studies regarding development of electricity distribution infrastructure
covering strengthening, improvement and augmentation of system capacity.
Site Engineer
Projects undertaken: -
● Designing and Correction of Shop Floor Drawings to make it feasible improvements for the project using
AutoCAD.
● Module cable laying calculation, installation and commissioning.
● Lead a team of supervisors & technicians for procurement of effective project tasks.
● Deft in overseeing project activities from conceptualization for execution including Preparation,
Technical specifications, stage inspections, progress monitoring, datasheets and commissioning.
● Deft in overseeing project activities from conceptualization for execution including Preparation,
Technical specifications, stage inspections, progress monitoring, datasheets and commissio ning.
KEY ACHIEVEMENTS: -
● Suggested improvements which are technically feasible for future projects of the company. Also
responsible for action taken for the product degrading.
● Successfully completed UAT /SAT for four states for RAPDRP project and got appreciated from client in
reply.
● Established close client interaction and escalate any issues/risks from the client perspective to the
development team as early as possible to mitigate the same.
● Coordinate with the development; testing and power system teams so that the necessary test plans;
cases; test data and project approval methodology is well defined and agreed.
● Process Compliance; Support to Audit process and ensure compliance; on time Delivery; Maintain
project plan and schedule Scope management.
EDUCATIONAL QUALIFICATIONS: -
● M.TECH (Electrical Power Systems and Management)-2019, Maharishi Dayanand University, Rohtak
● B. TECH (Electrical & Electronics)-2011, Maharishi Dayanand University, Rohtak
● Intermediate-2007, Delhi United Christian Senior Sec. School, Delhi
● High School- 2005, Govt. Co-Ed Sec. School, Delhi
DECLARATION: -
I hereby declare that the information furnished above is true to the best of my knowledge.