Consultant User Guide (Etendering) (26.09.2019) PDF
Consultant User Guide (Etendering) (26.09.2019) PDF
User Guide
(e-Tendering)
Contents
Assign user to view project at e-tender system...................................................................................... 1
Assign User (only by Admin User) ....................................................................................................... 1
How to assign user to view BQ ............................................................................................................... 3
How to upload tender documents .......................................................................................................... 5
How to edit “Form of Tender” at a project ............................................................................................. 9
How to access to BQ system & Add Bills............................................................................................... 12
How to Import sample ebq file ......................................................................................................... 14
How to open a bill, key in elements & items .................................................................................... 15
How to import BQ from Excel ........................................................................................................... 17
You can continue prepare BQ in Excel format and Import into BuildSpace ..................................... 21
How to print project/tender summary ............................................................................................. 25
How to publish the project to tendering (only do this once your BQ is finalized) ............................... 26
How to prepare “Calling Tender” form ................................................................................................. 27
How to prepare Tender Invitation .................................................................................................... 29
How to prepare Acknowledgment Letter ......................................................................................... 30
How to EXTEND tender ..................................................................................................................... 32
Tender Addendum ................................................................................................................................ 33
How to issue addendum tender documents .................................................................................... 33
How to issue / add addendum item at BQ........................................................................................ 34
How to compose message to project team member ........................................................................... 39
How to upload & share documents/drawings ...................................................................................... 40
Log For Tender Document .................................................................................................................... 46
Forum .................................................................................................................................................... 48
How to reply message from tenderer............................................................................................... 48
How to compose message to tenderer............................................................................................. 51
How to set a Topic to public ............................................................................................................. 55
How To Open Technical Evaluation Report .......................................................................................... 57
How to Print Tender Comparison Reports Once Tender is Opened ..................................................... 60
How To Prepare Rate Rationalization ................................................................................................... 65
Publish BQ to Post Contract .................................................................................................................. 71
Assign user to view project at e-tender system
Assign User (only by Admin User)
Note: Only Admin user can conduct this action.
2. Click on “BuildSpace Pro” logo and your browser will create another tab to open BQ
system.
6. Click at “NO” to set the user as admin to view the project. Then click “Save” and
“Close”.
7. Then the new assigned user will be able to view the BQ already.
5. When you click “Open”, you will see the following screen and the file which you can
download. To download, just click at “File Name” and save to your desire location or
click at “Upload” button to upload a new file. You also can “Delete” the file.
7. You will see the following pop up and click “Add Files.”
8. Then browse to select the file and click “Open”. You can select multiple files.
10. Then you will see the following screen. Close it by click at “x” sign or just click
anywhere at the screen to close this.
Note: You are advisable to upload PDF file into tender document.
1. Login to eTender system, open a project and click “Documents” and then click
“Tender Document”. Then click at “Show” beside the “Form of Tender”.
2. Click at “Edit” to edit form of tender. For example, if you want to edit the clauses,
just click “Edit” beside the “Clauses” menu.
5. Click “Edit” at “Tender Alternatives” section to select which types of alternative you
want it to appear at your form of tender.
1. Open a project. Click on “BuildSpace Pro” logo and your browser will create another
tab to open BQ system.
2. Click at project name or blank row below it, and then click at “Add Bill”.
7. Can cut & paste bill. Right click at a bill and select “Cut”. Then right click at the row
that you want to paste and select “Paste” (it will paste above the selected row).
1. You can email your Excel BQ to [email protected] and we will help you to
convert into BuildSpace BQ (ebq file) and imports follow the step 2 to 6 at below.
2. Click at project title and click “Backup” icon. Then follow by “Import Backup”.
Note: You can “Export Backup” to export bill from previous project and “Import Backup”
into new project that have similar bill items.
2. Press “Enter” to key in element name and press “Enter” to save. Click at “Project
Breakdown” to open other bills. Double click at element name to go to item level.
Note: You can use your keyboard’s arrow key to move to other cell like Excel.
3. At item level, press “Enter” at all cells to edit and press “Enter” again to save.
Note: You can use your keyboard’s arrow key to move to other cell like Excel.
Note: For rate, no need to put “,” for that amount because the system automated
generate.
2. Then you will see like this and the description at first row will be imported as
“Element” name in BuildSpace. Make sure the following;
a) Have a blank row between each item description
b) Unit, Qty & Rate are located at same row with item description
4. After that save or save as the excel file. Open a project at BuildSpace and click at the
bill that you want to import BQ into it. Then click at “Import From Files” icon and
select “Import From Excel”.
7. Then the system will process and the following table will pop up. Match the columns
by click at drop down arrow. Then click “Import”.
8. Then you can tick which element you want to import or tick all and select “Rate”
and/or “Quantity” if you want to import with Rate or Quantity. After that click at
“Import”.
1. If you use to prepare BQ in Excel format, you still can do that and you no need to
prepare the following at your Excel BQ;
a) Bill reference number
b) Page total
c) Collection page
d) Summary page
You can set the following rules when you want continue prepare BQ in Excel
instead of BuildSpace;
Column Type
A Description
B Unit
C Quantity
D Rates
You can prepare in multiple sheets and when it imported will become multiple
elements in BuildSpace.
5. Then the system will process and the following table will pop up. Match the columns
by click at drop down arrow. Then click “Import”.
7. After imported into BuildSpace, you need to change the ITEM type in BuildSpace by
go to item level and press “Enter” at “Type” cell, then click at drop down arrow to
select the type and press “Enter” again to save. Besides, you also need to double
check the “heading” by Indent or Outdent the headings.
Note: You can use your keyboard’s arrow key to move to other cell like Excel.
8. The following shows the common item types that you need to change if you have;
g) Allow for any other item to be keyed in by the tenderer – change item type to
“ITEM-NL”
9. For “Preliminaries Bill”, please insert unit as “LS” & quantity as “1” for the items that
you allow tenderer to price like below;
2. Can tick at check box to format the font type and press enter at the cell at “Item”
column to key in numbering or any text like “A, B, C ….”. Then press enter again to
finish editing.
3. Click on “Back to Project Builder” to go back to your project. Click “Print to PDF” to
printout your tender summary or click “Export to Excel” to export your tender
summary to Microsoft Excel.
1. Once you had completed your BQ and you need to press a “Publish To Tender”
button to move your project to tendering stage.
Note: When BQ publish to tender, the qty cannot amend unless consultant issue
addendum but for pricing consultant stay can key in or amend during tendering
stage.
3. Go back to eTender system, you can see your BQ file will auto appear at “Tender
Document”. Click “BuildSpace Pro” logo to access BQ at “Tendering” module.
13. Consultant can amend the date and time for “Calling Tender, Closed Tender &
Technical tender closing” and can tick disable tender rate submission (If required)
only.
Click on that date field and you will see the following screen. Select date and then
click at “Select Time” icon. It will appear another screen for you to set time.
Set the time and click outside the box or other field to continue fill up the form.
15. You can click “Send Tender Invitation” to send out tender invitation to the
tenderers.
16. You can see the following pop up appear, just type in the message that you want to
inform the tenderers and click “Preview” button.
19. Can see the following screen. “Tick” to Enable Acknowledgement Letter. Then type
your message and click “Save”.
21. Then fill in the information such as “Meeting Venue” , “Date” & “Discussion Time”.
To set up the the date just click on the stated date and select which date, as for the
time click on the “Clock ICON” and set up the time. To preview the draft click
“Interviewer Preview/Interviewee Preview”. Once you finalize with the information
you can save the draft click “Save” or “Save & Send” to sent out to the contractors.
22. You can “Save” the form or “Submit” form for verifier to verify the form.
Note: Once the calling tender form had been submitted, it will automatically
send out email notification to the contractors about the tender.
Contractors can be accessed during this calling tender period only.
23. If you want to “Extend” the tender date & time. Open “Calling Tender” form, make
necessary amendment on the date and select verifier (If required).
3. Then the system will generate a new revision for addendum. To edit BQ, click at
Project Breakdown and go to bill level.
5. While in Item level, right click the item that you want to amend, then click Copy.
7. A new item is generated with highlighted and you may able to insert new quantity.
9. Also, you can right click at any item to insert new row for new addendum item.
10. Once finish editing for addendum, click at Project Addendum and then click Edit (The
pen logo) to lock it.
12. The following message will pop up, click “No” if you had edited the summary page.
13. Then the addendum file will auto appear at the “Tender Documents”.
14. Consultant can click send notification to notify tenderer when have addendum at
BQ during calling tender or after push BQ to tender stage.
3. Tick who you want to compose message to (you can select more than one) and fill up
necessary fields or attachments. Then click “Send”.
5. The receiver will receive the message at their “Inbox” and they can open it and reply
the message if they want.
1. Click at “Document” and click “Project Documents” select any sub menus such as
“2D Drawings”.
2. Then click “Options” and select “New Folder” to create a new folder.
4. Click “Options” again to create sub folder if want or click “Share” to share to other
parties.
5. Tick on which parties you want to share with and click “Share”.
8. Click “Add Files” to browse and select files that you want to upload.
10. Click “Start upload” and after finish uploaded, click “x” sign to return.
11. Click “Edit” to edit the file description or select any revision of file.
16. Can see other parties’ shared files and click open to see & download the files.
4. Can see the company’s name, user’s name and the latest downloaded.
3. Click at Forum to reply the message and can see the notification
7. Once posted a comment, you can click at Notify to notify the relevant parties.
3. Fill in the Title & Post. To upload attachment, click “Add Files”.
6. The file already uploaded and click “Save”. To remove the file, click “Delete”
8. You can tick to select the party you want to send to. After that, click Send.
10. if the contractor replied, you can click into the Topic/ Comments.
3. Once ticked, click Yes to proceed. (Note: Once clicked Yes, the topic will be display to
other tenderer. However, tenderer will not display their company name)
5. Once created the topic, you can click at “Notify” to notify the relevant parties.
6. You can tick to select the party you want to send to. After that, click “Send”.
2. Once technical evaluation is opened, click at “Tendering” menu and then click at
“Tender” to view.
3. Click “Tender”
6. To view the “technical evaluation form” you can click on any of the tenderers from
the list & you can overwrite the scoring and add remarks.
8. At the technical evaluation report, you can view the result summary. To export
summary report, click “Action(s)” & click “Export Overall Summary Report in Excel”.
You can also view the “In-depth scoring/detail scoring” for each of the criteria by
single clicking any of the criteria list.
1. Open the project. Click on “BuildSpace Pro” logo and your browser will create
another tab to open BQ system.
Note: Sometimes the client might hided “View Tenderers” because of the
tendering process. If the “View Tenderers” button is hidden, please notify
the client to unhide the button.
3. Then you can see the following screen and click at “Tenderer Setting” button.
5. You can see number of revisions and you can select which revision you want to
compare to.
6. You can see “RED COLOUR” amount means got differences or changes of the price.
Double click until item level to see the different prices.
9. Double click to open the project that you want to print tender comparison reports.
12. “Tick” the checkbox to choose the tenderers or can tick at top checkbox to select all.
Then click “Close”.
13. Now you can tick at checkbox to select which bills you want to print or you can
double click at bill to go to element & item level to print out the tender comparison
report.
16. If you double click a bill and go to elements level, you can tick all elements and select
print “Item Rate & Total”.
4. Click Add Addendum and make sure the status of new added addendum is “In Progress”.
After that, click Project Breakdown and back to bill summary page.
8. Once selected the tenderer, it will display Original Total & Adjusted Total and the action will
change to Selected. After that, click Close to close Tenderer Setting tab.
9. Once you closed Tenderer Setting tab, the selected tenderer’s name will display in blue
colour.
12. At Item Level, system will display Consultant’s PTE and Tenderers Rate in one table. (Scroll
to the right to view for tenderer rate)
14. Or can adjust the rate by trade. (This function only can be conducted if consultants used
Import Rate function to prepare PTE). If no, please skip to step 22.
17. Double click Schedule Of Rate (It depends on which schedule of rate that used during
pricing BQ used import rate)
19. Double click the grade/type under the trade to know which bill, element and item used the
grade/type
20. It will display Consultant’s PTE and Tenderer’s rate in one table
21. To adjust the selected tenderer rate, press “Enter” to edit and press “Enter” again to save
22. After rationalized the rate, you can check the difference between original total and
adjusted(rationalized) total by clicking Back To Tendering to go to front page
25. From here you can view the difference between Original Total and Adjusted (Rationalized)
Total.
❖ Consultant have to do adjustment until the different between Original Total with
Adjusted Total is zero/equivalent.
26. After rate rationalization, you can click at the selected tenderer’s name, then click Print
Contractor’s Rate to print out the BQ or click at “Log” button to view the comparison
between before rationalise & after rationalise rates.
5. Fill in the particulars before publishing the BQ to post contract for approval process. After
that click Save.
After clicking Save, an email notification will send to the verifier/client for approval request.