Work Order For Concreteing

This work order summarizes the agreement between Infini Construction Pvt Limited and Superior System to carry out concrete works for a villa project in Pune. It outlines the scope of concrete works, rates, payment terms, safety requirements, and other contractual terms. Superior System will provide 139.24 cubic meters of grade M35 concrete and 117.81 cubic meters of grade M35 concrete for various structural elements at agreed rates. Payments will be made within 21 days and the contractor is responsible for all labor laws and safety at site.

Uploaded by

Om Krish Ram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views

Work Order For Concreteing

This work order summarizes the agreement between Infini Construction Pvt Limited and Superior System to carry out concrete works for a villa project in Pune. It outlines the scope of concrete works, rates, payment terms, safety requirements, and other contractual terms. Superior System will provide 139.24 cubic meters of grade M35 concrete and 117.81 cubic meters of grade M35 concrete for various structural elements at agreed rates. Payments will be made within 21 days and the contractor is responsible for all labor laws and safety at site.

Uploaded by

Om Krish Ram
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

INFINI CONSTRUCTION PVT LIMITED

WORK ORDER FOR CONCRETING

Ref.No. - KUCO/SANCT-B1/SAMPLE/CONC/WO-12012014 Date: 12/07/2020

To,
Superior System
Shree Yash Terrace, Flat No B/7, S No 33
Canal Road, Warje, Pune 411058
Email - [email protected]
Kind Attn. : - Mr. Gyan Suthar ( GSM No - 9890449397/9595430297)

Sub :- Work order for Concrete Works for Hiviya villa located in Sahakar Nagar, Pune.

Dear Sir,
With reference to your quotation and our sub-sequent discussion, we are pleased to place an order to
for Hiviya villa Concrete works for aforesaid project site at mutually agreed rates
mentioned herein.

S.No Item Description Unit Quantity Rate Amount


4.1 Providing,mixing,transporting, placing and compacting the
reinforeced cement Concrete either Site Mix or RMC from
Outside as specified below of various grades, in positions at all
levels and heights, in all required shapes / profiles /
inclinations for all plain and reinforced concrete members such
as rafts, Footings, RCC walls , columns , beams , slabs , chajjas,
lintels, staircases, pardis, and other miscellaneous members
such as brackets, fins and all architectural features as per
specifications / IS codes and as directed by the Project
Manager. The rate shall also include the cost of necessary
labour, plant and machineries, dewatering, curing the concrete
as directed by the Project Manager. curing pipes / Hessain
cloth, tools and tackles, making the surface good to receive the
finishes, Cover blocks of PVC or Nylon of approved make /
quality (in case of concrete cover blocks, One grade higher
Ready made / Factory made to be used as against the relevant
structural member grade), making provision of stand - by
vibrators and needles , buttering with cement slurry , removing
laitance from surface , protecting the newly placed concrete
from rain / heat with PVC sheets , marking the date of
concreting, filling the required checklist / pour card, making
necessary arrangements for ponding, curing, clearing the area
of debris, providing required labour, pumping and hoisting by
any mechanical means etc. complete as directed and to the
satisfaction of the Project Manager as per the technical
specification of the tender.

4.1.1 RMC brought from Outside - RCC with grade M35 for raft Cu.m 139.24
for all types of Column foundation / footings/rafts (Viz.,
trapezoidal / stepped / flat/Combined/isolated), lift shaft
footing, sump bottom, pile cap, nala raft, Columns, Shear wall,
Retaining wall ,Column Pedestals, mullians and Column Head
at all levels including hacking of RCC surface for receiving
plastering or any other surface

4.1.2 RMC brought from Outside - RCC with grade M35 for Plinth Cu.m 117.81
beam ,Grade Slab, Slab, Roof Slabs /sloping slabs. Beams, Stairs
with waist slabs, steps, landings and ledge in foundation, Lintel
Beams, fasciae, drops and parapets,Pergola, Chajjas, Cills and
Cill Projections,sump, gutter of varying thickness,Machine /
equipment foundation, coping, parapets at all levels including
hacking of RCC surface for receiving plastering or any other
surface ,etc.

A. Scope of work
The scope of the work broadly includes Concrete works for aforesaid project for
sample flat.

B. Terms and Rates

1. The date of commencement shall be the date of Work Order.


2. TDS as applicable shall be deducted from the Contractor’s payment/bills.
3. Taxes such as service tax if applicable, as per Government rules and regulations shall paid extra.
4. Client shall make an arrangement for electrical power (free of cost) for construction, labour camp. For
any purpose other than mentioned above shall be debited to contractor.

5. 5% Retention money towards the security deposit shall be deducted from interim bill duly certified by
Engineer In Charge and the same shall be released after 3 months on satisfactory completion of
aforesaid works. No interest shall be paid on Security Deposit & Retention money.

6. The Contractor shall take all the necessary precautions to protect existing structures etc. from any
Damages.

7. Rate analysis and prior written approval of General Manager is necessary for extra items.

8. The Contractor should not engage labours below 18 years old and. The Contractor should pay the
wages to the labours as per the minimum wages act as per the circular issued by the regional labour
commissioner, Mumbai time to time .If any accident occurs, Contractor shall be fully held responsible
.The Contractor shall submit workman compensation policy, insurance /group insurance /ESIC scheme
if applicable.

9. The Contractor shall obtain all necessary permits, licenses, sanctions from all regulatory authorities in
connection of Labor and comply with all rules and regulations. Copies of workmen compensation
Policy, Labor License, registration with Sales Tax authorities, Provident fund regulations shall be
submitted to the Employer as and when required and asked for Contractor shall indemnify the
Employer, Architect and Consultant from any disputes of whatsoever nature arising out of labor laws
and regulations.

10. The rates of various items to be executed shall be as per the bill of quantities enclosed herewith as
“Annexure A” to this work order. The payment shall be made as per actual quantities of the work
carried out as per working drawings and jointly measured and certified by EIC. The individual
quantities may vary to any extent and Contractor shall have no claim whatsoever for the change in
quantities of any item(s). The owner reserve the right to add, to omit and to alter the work shown on
the drawings and described in the schedule of Bill of Quantities in “Annexure A” to this agreement
and this shall not invalidate the Contract.
11. The rates quoted in the tender shall include all input costs and charges for tools, plants, temporary
water and electric connections (if any, hire charges if any, maintenance of all services and equipment
for clearing the site etc., for the execution of the works shall also include all taxes such as sales tax,
octroi duty, excise or any other duties and levies of any public body or corporation (duly authorized to
collect)

12. Contractor shall ensure safe working practices at site and shall issue necessary PPE's to the workmen.
In the event of any accident shall be the sole responsibility of contractor and shall be to his account

Other Terms & Conditions:

1. Payments for Running Bills shall be made to the contractor within 21 days from the date of
submission of the bill.
2. Material reconciliation shall be submitted by the contractor for material supplied by client along with
the every R.A. Bill.
3. The rates shall remain fixed for whole contract period.
4. All above stipulated point’s viz. work, time period, terms and condition mentioned in this work order
as annexure ‘A’ - Bill of Quantities shall be binding up on both the parties

Accepted with all terms & conditions


For Infini Construction For Contractor
Pvt Limited

Authorized Signatory Authorized Signatory