Malampuzha Canal Bridge Measurement

1. The document discusses excavation work, dismantling of structures, concrete work and reinforcement work for bridge foundations. 2. Details are provided on excavating to different depths using mechanical means, and concrete work for footings, abutments and other sub-structures of the bridge. 3. Reinforcement requirements are listed for abutment footings and superstructures, including quantities of rebar of different diameters.

Uploaded by

insafa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views22 pages

Malampuzha Canal Bridge Measurement

1. The document discusses excavation work, dismantling of structures, concrete work and reinforcement work for bridge foundations. 2. Details are provided on excavating to different depths using mechanical means, and concrete work for footings, abutments and other sub-structures of the bridge. 3. Reinforcement requirements are listed for abutment footings and superstructures, including quantities of rebar of different diameters.

Uploaded by

insafa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 22

1 Dismantling of existing structures like culverts,

bridges, retaining walls and other structure


comprising of masonry, cement concrete,
wood work, steel work, including T&P and
scaffolding wherever necessary, sorting the
dismantled material, disposal of unserviceable
material and stacking the serviceable material
with all lifts and lead of 1000 metres -Lime
Concrete, cement concrete grade M-10 and
below - By Manual Means

1 26.00 (0.70+0.40)/2
1 25.80 (0.70+0.40)/2
1 17.40 15.00

3.13.1.B Earth work in excavation of


foundation of structures as per drawing and
technical specification, including setting out,
construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing
of sides and bottom, backfilling the excavation
earth to the extent required and utilising the
remaining earth locally for road work.<br>
Ordinary soil - Mechanical Means - (Depth
upto 3 m)
1 14.30 (4.00+2.10)/2
1 14.30 4.00
1 14.30 5.20
1 14.30 (4.00+1.50)/2
1 14.30 4.00
1 14.30 5.20
3 12.1.B.2 Earth work in excavation of
foundation of structures as per drawing and
technical specification, including setting out,
removal of stumps and other deleterious
matter, only for dressing of sides and bottom
and backfilling with approved material.
Ordinary Soil - Depth 3 M to 6 M- Mechanical
Means

1 14.30 5.20
1 14.30 5.20

4 12.1.4.A Earth work in excavation of


foundation of structures as per drawing and
technical specification, including setting out,
construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing
of sides and bottom and backfilling with
approved material

od26680/2017_2018 null Bailing out water with


5 HP Engine and pumpset including
conveyance of plant to the site, erection
charges, cost of fuel, hire and working charges
etc complete.
. 2 10.00 8.00
6 od26693/2017_2018 null Providing 25mm dia
dowel bars with TMT rods3.00m long and
1.50m into the rock and 1.50m into the
concrete @1.00m c/c wherever found
necessary as per the technical drawing
including cost of materials, labour charge
conveyance etc. complete

7 12.8.1.C Plain/Reinforced Cement Concrete in


Open Foundation complete as per Drawing
and Technical Specifications RCC Grade M20
- Using Concrete Mixer - (Without formwork)

8
12.8.A.1 Plain/Reinforced cement concrete in
sub-structure complete as per drawing and
Technical Specifications <br> PCC Grade M15
- Height upto 5m
Ist footing
foundation bed abutment 1
1 (8.46+7.14)/2 3.30
wing walls
2 (3.53+1.66)/2 2.80
foundation bed abutment 2
1 (8.46+7.14)/2 3.30
wing walls
2 (3.53+1.66)/2 2.80
II nd footing
foundation bed abutment 1
1 (8.22+7.39)/2 2.70
wing walls
2 (3.40+1.78)/2 2.20
foundation bed abutment 2
1 (8.22+7.39)/2 2.70
wing walls
2 (3.40+1.78)/2 2.20
III rd footing
foundation bed abutment 1
1 (7.99+7.68)/2 2.10
wing walls
2 (3.25+1.88)/2 1.60
foundation bed abutment 2
1 (7.99+7.68)/2 2.10
wing walls
2 (3.25+1.88)/2 1.60

9 12.41 Supplying, fitting and placing un-coated


Mild steel reinforcement complete in
foundation as per drawing and technical
specification

Abutment 1 Ist footing


8 mm dia main 13 10.85
8 mm dia over lap 6 0.45
8 mm dia main 4 12.53
8 mm dia main 2x6 1.1
8 mm dia dist 37 3.2
8 mm dia dist 14 2.7
8 mm dia vertical 158 2.1
8 mm dia dist 6 31.6
8 mm dia dist 1 31
8 mm dia over lap 31 0.45
Abutment 2 Ist footing
8 mm dia main 13 10.85
8 mm dia over lap 8 0.45
8 mm dia main 4 12.53
8 mm dia main 2x7 1.1
8 mm dia dist 37 3.2
8 mm dia dist 14 2.7
8 mm dia vertical 158 1.95
8 mm dia dist 5 31.6
8 mm dia dist 1 31
8 mm dia over lap 29 0.45

Abutment 1 2 nd footing
8 mm dia vertical 156 1.6
8 mm dia dist 5 31
8 mm dia dist 1 30.5
8 mm dia over lap 24 0.45
Abutment 2 2 nd footing
8 mm dia vertical 156 1.45
8 mm dia dist 4 31
8 mm dia dist 1 30.5
8 mm dia over lap 23 0.45

Abutment 1 3 rd footing
10 mm dia vertical 154 1.6
8 mm dia dist 5 30.5
8 mm dia dist 1 30
8 mm dia over lap 27 0.45
Abutment 2 3 rd footing
10 mm dia vertical 154 1.45
8 mm dia dist 4 30.5
8 mm dia dist 1 30
8 mm dia over lap 24 0.45

10 13.5.E.p.2 Plain/Reinforced cement concrete in


sub-structure complete as per drawing and
Technical Specifications RCC Grade M20 -
With Batching Plant, Transit Mixer and
Concrete Pump - Height upto 5m

abutment 1 super

1 (7.85+7.65)/2 (1.50+1.00)/2
wing wall 2 (5.20+5.19)/2 (1.00+0.60)/2
extra ht for wing wall 2 (1.59+2.19)/2 (0.60+0.40)/2
abutment 2 super

1 (7.85+7.65)/2 (1.50+1.00)/2
wing wall 2 (5.20+5.19)/2 (1.00+0.60)/2
extra ht for wing wall 2 (1.59+2.19)/2 (0.60+0.40)/2
11 13.5.C.p.2 Plain/Reinforced cement concrete
in sub-structure complete as per drawing and
Technical Specifications PCC Grade M25 -
With Batching Plant, Transit Mixer and
Concrete Pump

abutment 1
bed block
1 (9.50+7.30)/2 1.1
dirt wall
1 (9.50+8.90)/2 0.4
abutment 2
bed block
1 (9.50+7.30)/2 1.1
dirt wall
1 (9.50+8.90)/2 0.4

12
13.6 Supplying, fitting and placing HYSD bar
reinforcement in sub-structure complete as per
drawing and Technical Specifications
For super
abutment 1

10 mm main 154 3.68 0.617


8 mm dist 13 38.5 0.395
8 mm overlap 55 0.45 0.395
abutment 2

10 mm main 154 3.68 0.617


8 mm dist 13 38.5 0.395
8 mm overlap 53 0.45 0.395
bed block and dirt wall
abutment 1
12 mm main ring
46 2.8 0.888
12 mm dist
110 3.2 0.888
10 mm dist
18 8.3 0.617
10 mm dist
13 9.4 0.617
10 mm dist
13 8.8 0.617
abutment 2
12 mm main ring
46 2.8 0.888
12 mm dist
110 3.2 0.888
12 mm dist
18 8.3 0.888
10 mm dist
13 9.4 0.617
10 mm dist
13 8.8 0.617
8 mm dia 6x10 0.6 0.395
8 mm dia 6x10 0.5 0.395

13 14.1C.2.2.A "Furnishing and Placing


Reinforced Cement Concrete Grade M30
Using Batching Plant, Transit Mixer and
Concrete Pump as per drawing and Technical
Specification. For T-beam & slab - Height upto
5m"

14 14.2 Supplying, fitting and placing HYSD bar


reinforcement in super-structure complete as
per drawing and technical specifications

15 14.6 Construction of precast RCC railing of


M30 Grade, aggregate size not exceeding 12
mm, true to line and grade, tolerance of vertical
RCC post not to exceed 1 in 500, centre to
centre spacing between vertical post not to
exceed 2000 mm, leaving adequate space
between vertical post for expansion, complete
as per approved drawings and technical
specifications.
16 13.14 Supplying, fitting and fixing in position
true to line and level elastomeric bearing
conforming to IRC: 83 (Part-II) section IX and
clause 2005 of MoRTH specifications complete
including all accessories as per drawing and
Technical Specifications

6 50 32

17 14.9 Drainage Spouts complete as per drawing


and Technical specification

18 od26683/2017_2018 null Providing 100mm x


100mm CI grating including cost and
conveyance of materials and all labour charges
etc. complete

19 15.9 Construction of dry rubble flooring at


cross drainage works for relatively less
important works.

1 17.1 10
20 12.4 Plain cement concrete 1:3:6 nominal mix
in foundation with crushed stone aggregate 40
mm nominal size mechanically mixed, placed
in foundation and compacted by vibration
including curing for 14 days.

foundation bed abutment 1


1 (8.70+6.90)/2 3.9
wing walls
2 (3.95+1.85)/2 3.4
foundation bed abutment 2
1 (8.70+6.90)/2 3.9
wing walls
2 (3.95+1.85)/2 3.4

Canal side wall


4 5 0.8

Bed 1 17.1 15

21 12.8.B Plain/Reinforced Cement Concrete in


Open Foundation complete as per Drawing
and Technical Specifications PCC Grade M20
(Without formwork)

Bed 1 17.1 15

22 13.5.A Plain/Reinforced cement concrete in


sub-structure complete as per drawing and
Technical Specifications PCC Grade M15 -
Height upto 5m
4 10 0.6
4 5 0.5
2 20 0.5

23 14.16 Providing and applying 2 coats of water


based cement paint to unplastered concrete
surface after cleaning the surface of dirt, dust,
oil, grease, efflorescence and applying paint @
of 1 litre for 2 sqm.

24 8.8 Painting two coats after filling the surface


with synthetic enamel paint in all shades on
new plastered concrete surfaces

25 od24935/2017_2018 null providing weep holes


in Plain/ Reinforced concrete abutment,wing
wall/return wall with 75mm dia PVC
pipe(4kgf/cm2), extending through full width of
structure with slope of 1V:20H, complete as
per drawing and technical specification
26 13.9.A Back filling behind abutment, wing wall
and return wall complete as per drawing and
Technical Specification <br> Granular material
Qty as Amount as per
per Rate as per Agreement
estimate Agreement rate

1.85 26.46
1.85 26.25
0.30 78.30

131.01 108.879 495.79 64951.712635 53981.11941

1.55 67.60
1.80 102.96
0.95 70.64
0.85 33.43
1.80 102.96
0.48 35.69

413.28 286.791 55.19 22809.160517 15827.99529


3.00 223.08
3.00 223.08

446.16 195.453 63.83 28478.3928 12475.76499

0.00 36.22 518.68 0 18786.5896

160.00
160.00 160 179.98 28796.8 28796.8

0.00 100 790 0 79000

0.00 16.098 7336 0 118094.928

0.90 23.17
0.90 13.08
0.75 19.31
0.75 10.90

0.90 18.97
0.90 10.26
0.75 15.81
0.75 8.55

0.90 14.81
0.90 7.39
0.75 12.34
0.75 6.16

94.27 175.265 7160 674945.634 1254897.4

0.395 55.71
0.395 1.07
0.395 19.80
0.395 5.21
0.395 46.77
0.395 14.93
0.395 131.06
0.395 74.89
0.395 12.25
0.395 5.51

0.395 55.71
0.395 1.42
0.395 19.80
0.395 6.08
0.395 46.77
0.395 14.93
0.395 121.70
0.395 62.41
0.395 12.25
0.395 5.15

0.395 98.59
0.395 61.23
0.395 12.05
0.395 4.27
0.395 89.35
0.395 48.98
0.395 12.05
0.395 4.09

0.617 152.03
0.395 60.24
0.395 11.85
0.395 4.80

0.617 137.78
0.395 48.19
0.395 11.85
0.395 4.27

1475.02
1.48 5.28 77243.01 113934.84557 407843.0928

3.08 29.84
3.08 25.60
2.28 4.31

3.08 29.84
3.08 25.60
2.28 4.31

119.50 68.103 7783 930032.07556 530045.649


0.3 2.77
1.98 7.29

0.3 2.77
1.98 7.29

20.12 17.289 7383 148522.3344 127644.687

349.67
197.70
9.78

349.67
197.70
9.42

114.37
312.58
92.18
75.40
70.58

114.37
312.58
132.67
75.40
70.58
14.22
11.85

2510.71
2.51 4.5 6942 17429.325773 31239

78.00 78 8797 686166 686166

12.08 12.08 68913 832469.04 832469.04


37.80 37.8 1416.06 53527.068 53527.068

10 96000.00

96000.00 198000 0.74 71040 146520

6.00 6 3905 23430 23430

6.00 6 74 444 444

0.3 51.30
51.30 70.335 3109 159491.7 218671.515

0.15 4.56
0.15 2.96
0.15 4.56
0.15 2.96

0.3 4.8

0.20 51.30

71.14 65.89 5814 413619.588 383084.46

0.10 25.65
25.65 32.586 7034 180422.1 229209.924
2 48
1.5 15
1.5 30

93.00 16.531 7300 678900 120676.3

334.00 334.201 189 63126 63163.989

147.00 147.12 111.4 16375.8 16389.168


120.00 152 185 22200 28120

289.75 289.75 2142 620644.5 620644.5

Total 5851756.0773 6101148.99


LS
LS
Total