0% found this document useful (0 votes)
56 views

Description: AC VOLTMETER: Record No.: Equip. No. Drawing Ref.: Sheet: Contractor: Contract No.: Substation No

The document is a commissioning standard test format for an AC voltmeter. It contains sections for general data and information about the equipment being tested, mechanical checks and visual inspection to be performed, and a secondary injection test where voltages at different percentages are applied and the meter readings are recorded to check for accuracy within 0.5% plus or minus 1 digit. The test was performed and witnessed by engineers who signed off on the document.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views

Description: AC VOLTMETER: Record No.: Equip. No. Drawing Ref.: Sheet: Contractor: Contract No.: Substation No

The document is a commissioning standard test format for an AC voltmeter. It contains sections for general data and information about the equipment being tested, mechanical checks and visual inspection to be performed, and a secondary injection test where voltages at different percentages are applied and the meter readings are recorded to check for accuracy within 0.5% plus or minus 1 digit. The test was performed and witnessed by engineers who signed off on the document.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Commissioning Service Department

Commissioning Standard Test Formats

Description: AC VOLTMETER Record No. :


Equip. No. Drawing ref.: Sheet :
Contractor : Contract no.: Substation No :

GENERAL DATA AND INFORMATION:


Bay No. DCDB#
Designation
ACCURACY 0.5% ± 1 digit

MECHANICAL CHECKS AND VISUAL INSPECTION:

ITEM DESCRIPTION CHECKED

1 Inspect for any physical damage or defects.

2 Verify connections as per approved drawing

Secondary Injection Test :

Observed meter reading (V)


Volt % Applied Voltage (A) % Error Remarks
R Y B

25

50

75

100

% Error = (Observed meter reading-Applied meter reading) / Full scale reading x 100.

- Test Equipment's : FREJA 300

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date: