Anchor Design 1 PDF

This document summarizes the soil profile, wall and pile properties, surcharges, anchor locations, and depth control for a contiguous piled wall with ground anchor support. The soil consists of 4 layers down to a depth of 16 meters. A 30 meter long pile wall with 20 cm diameter piles is anchored with 3 anchors at depths of 10, 9.45, and 9 meters. Surcharges including uniform, strip, and line loads are applied. Anchor forces are calculated at depths along the wall.

Uploaded by

Chee Ming Chong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views

Anchor Design 1 PDF

This document summarizes the soil profile, wall and pile properties, surcharges, anchor locations, and depth control for a contiguous piled wall with ground anchor support. The soil consists of 4 layers down to a depth of 16 meters. A 30 meter long pile wall with 20 cm diameter piles is anchored with 3 anchors at depths of 10, 9.45, and 9 meters. Surcharges including uniform, strip, and line loads are applied. Anchor forces are calculated at depths along the wall.

Uploaded by

Chee Ming Chong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 24

Contiguous Piled Wall With Ground Anchor Support

10

Profiles
5
4.5

20.0
0

-4.0
-5
-6.0

-10.0
-10

G.W. -12.5 -12.0


-14.0
-15

-20

-25

-30 -30.0
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70

Soil Profile Pile Properties Surcharges Anchor Locaions Depth Control

Head Beam Pile Strut Beam Anchor

Report
Author Turan BABACAN
Soil Profile

Layer S.E. (m) c (Nm)  () C (Nm) Ka Kp H (m)


Soil1 -4.00 17.00 0 150.0 1.00 1.00 4.00
Soil2 -6.00 17.00 0 200.0 1.00 1.00 2.00
Soil3 -12.00 17.00 0 250.0 1.00 1.00 6.00
Soil4 -14.00 18.20 0 300.0 1.00 1.00 2.00
Stiff Soil -16.00 18.20 0 500.0 1.00 1.00 2.00

Ground Water Elevation : -12.50 m

0.0

5000
-20000

-5000

10000
-15000

-10000
Soil1

-5.0 Soil2
-10.00

G.W. -12.50

Soil3
-10.0

Soil4

-15.0 Stiff Soil

-30.00

P
Pp
-20.0 Pa
Wall and Pile Properties

10.00

H= 10.00 m
30.00
D= 20.00 m
J= 18.0 
20.00
Ep= 2.0E+08 Nm2

Hpile = 30.00 m

a= 100 cm
R= 0 cm
0
Ix= 3.2E-02 m4
Ap= 6.4E-01 m

b= 25.0 cm
h= 120.0 cm
B= 140.0 cm
-20000

-15000

-10000

-5000

10000
5000
J=18.0 º

0
0
10.00
P

Pp
-5
Pa

-10
20.00

-15
-1113.37

Ø90
-20

100 100
-25

1.00
0 0
0.0
-30

-35
Surcharges

Uni.Load u (Nm)
1 20.0

Strip Load 1 (Nm) 2 (Nm)


1
2
3

Line Load L (Nm) X< 33.00


1
2
3

0 5 10 15 20 25
0
0.00 20.00

-2

-4

-6
20.0
-8

-10

-12

-14

-16
ΣQ
-18 SURCHARGES PRESSURES
X1> 0.00 X2< 33.00
Anchorages

H= 10.00 m.

# Anchors = 3
z (m) R (N)
h (1) = 10.00 m. 0.00 0.00
-10.00 6724.86
h (n) = 0.10 m. -.5 0.00
-.0 0.00
h (2,3,..,n-1) = -0.05 -.1 0.00
-.3 0.00
-.4 0.00
-.6 0.00
Anchor Elev. i () Lu.(m) -.7 0.00
1 -10.00 15  16.33 -. 0.00
2 -.5 15  16.37 -10.00 -5711.47
3 -.0 15  16.41 -13.33 -557.2
4 0.00 -16.67 -531.30
5 0.00 -20.00 -3426.2
6 0.00 -23.33 -1425.12
7 0.00 -26.67 -117.55
8 0.00 -30.00 0.00
 0.00 Max 6724.86

-50000.0

-30000.0

-10000.0

10000.0
100.00
150.00
200.00
250.00
300.00
350.00
400.00
-50.00

50.00
0.00

0.00 0.0 0.0

-5.0 -5.0

6724.9 0.0 -9.9


-10.0
-10.00 -10.0 -10.0

-15.0 -15.0

-20.0 -20.0

-25.0 -25.0

-30.0 -30.0
-30.00

ANCHOR LOAD (kN) DISPLACEMENT(mm) -35.0 MOMENT (kNm) -35.0


Anchor Design

sf =
T=
Pp =
 (mm) M (Nm) V (N)
36.12 0.00 0.00 L = P . sf    . d . T 
54.1 -44270.00 -4427.00
54.13 -4432.00 -117.4 P : Anchor Load
54.0 -44055.14 5477.20 L : Load transfer length
53.72 -43882.72 1206.05 d : Diameter of grout annulus
53.53 -43710.31 1206.05 T : Woring ond stress
53.44 -43537.8 1206.05 sf : Safety factor
53.3 -43365.48 1206.05  : 3.14
53.37 -4313.06 1206.05
53.35 -43020.65 1206.05
53.34 -42848.23 1206.05 Str.Dia. (in)
51.75 8320.18 15350.52 0.60
4.40 12214.8 1168.44
31.15 -187.22 -4228.26
12.86 -4550.37 -801.34 ANC. d (mm)
1.05 -2471.10 623.78 1 150
-6.60 0.00 741.33 2 150
36.12 4432.00 15350.52 3 150
4 150
5 150
-10000.0

10000.0

15000.0

20000.0
-5000.0

5000.0

6 150
0.0

0.0 7 150
8 150
-5.0  150

-10.0

-15.0

-20.0

-25.0

-30.0

SHEAR (kN) -35.0


3.00
300 Nm2
300.0 N (Project Load)

L = P . sf    . d . T 

P : Anchor Load
L : Load transfer length
d : Diameter of grout annulus
T : Woring ond stress
sf : Safety factor

Aps (mm2) fpu (Nmm2) 0.60 .fpu.Aps


182 1863 203.

Pult (N) L.(m) select L L Strands


662.08 147.74 147.74 164.07 35
0.00 0.00 0.80 17.17 0
0.00 6.37 6.37 22.78 2
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0

Material >>
Strut Beam Design

Strut Beam Material :

Anchorage Plan :

Beam Dimensions :
Strut Beam Design

Strut Beam Material :


Concrete fcd-Seam = 16700 Nm
fcdt-Seam = 111 Nm Material >>

Steel fyd-Seam = 365000 Nm

Anchorage Plan :

S = 1.80 m.

Strut Beam Analysis >>

Beam Dimensions :

 = 30 cm.
h = 70 cm.
d = 30 mm. Side of the Pile
Longitudinal Reinforcement OK
Numer Diameter AreaSel. AreaCalc.
(#) ( mm ) ( cm ) ( cm )
7 18 17.8 5.6

Side of the Excavation


Longitudinal Reinforcement OK
Numer Diameter AreaSel. AreaCalc.
(#) ( mm ) ( cm ) ( cm )
5 18 12.7 3.7

Transverse Reinforcement OK
Diameter Spacing Vd Vd
( mm ) ( cm ) ( N ) ( N )
8 15 -100872.8 366.8
Pile Design

Pile Material :
Concrete fcd-pile = 16700 Nm
fctd-pile = 1118. Nm
Material >>
Steel fyd-pile = 365000 Nm

Pile Analysis >>

d pl = 50 mm

Longitudinal Reinforcement NO
Numer Diameter AreaSel. AreaCalc.
( #) ( mm ) ( cm ) ( cm )
10 18 25.4 2024.7

Transverse Reinforcement NO
Diameter Spacing Vd Vd
( mm ) ( cm ) ( N ) ( N )
8 15 24426.8 614.8

Concrete Strength NO
D Md M
( cm ) ( Nm ) ( Nm )
0 66511.0 61.7 M < Md
Material

Concrete fcd
Class Nm
BS14 (C14) 10000
BS16 (C16) 10700
BS20 (C20) 13300
BS25 (C25) 16700
BS30 (C30) 20000
BS35 (C35) 23300
BS40 (C40) 26700
BS45 (C44) 30000
BS50 (C50) 33300

Steel fyd
Class Nm
S220 (BC I) 220000
S420 (BC III) 420000
S500(BC III) 500000

Soil  Roc Type Empirical Bond Stress Value 


Cohesive Soil
Sand
Gravel
Weathered Marl, Chal, Soft Shales
Soft Limestone, Slates, Hard Shales, Sandstone
Dolomite Limestone
Granite, Basalt
fctd
Nm << Pile Design
8696
9304 << Strut Beam Design
11565
14522 << Head Beam Design
17391
20261
23217
26087
28957

Type Empirical Bond Stress Value  T  Nm2


100.0
150.0
200.0
arl, Chal, Soft Shales 150 - 800
ne, Slates, Hard Shales, Sandstone 800 - 1700
1400 - 2100
1700 - 3100

<< Anchor Design

<< D Check
D CHECK

Dcalc. = Pv . Sf   Aph . T 

Pv : Uplift Load
D : Load transfer length
R : Diameter of Pile
T : Woring ond stress
Sf : Safety factor

Sf = 3.00
T= 155 Nm2

No Pv.fem Psel.
anc1 4527.36 244.0
anc2 0.00 0.00
anc3 0.00 15.0
anc4 0.00 0.00
anc5 0.00 0.00
anc6 0.00 0.00
anc7 0.00 0.00
anc8 0.00 0.00
anc 0.00 0.00
313.17

Dsel = 20.00 m
R= 0.0 m
Aph = 56.55 m²

Dcalc. = 1.07 m
Dsel > Dcalc

OK

Material >>
Strut Beam Analysis
Longitudinal Reinforcement
Failure Anchor Position

ult = Rmax  (2S.H23) = -37360.3 N

2S= 3.6 m.

Vmax = ult .S = ###### N


Side of the Pile
Calc. As =
Select As =

Mmax =Vmax S - ult S2 = ###### Nm Side of the Excavation


Calc. As =
Select As =

Transverse Reinforcement
Vd = Vmax a 1.5
A = 1.00 m.
Vmax = -67248.56 Nm
Vd = ###### N
Vcr = 0.65 fctd Ac
fctd = 1118.0 Nm
Vcr = 152.73 N
Vc = 0.80 Vcr
Vc = 122.18 N
Vws = Asw d fywd  s
Vws = 244.63 N
Vd = Vws + Vc
Vd = 366.81 N

815 OK
Pile Analysis
Longitudinal Reinforcement
Beam = 30.00 cm
Heam = 70.00 cm
d = 3.00 cm
d = 27.00 cm
Ac = 0.210 m
Rmax = 6724.86 Nm
d = -37360.31 Nm
Md = -87423.13 Nm
md = -120.6
ρm = 0.08
Side of the Pile
Calc. As = 5.56 cm
Select As = 17.81 cm

718 OK

Side of the Excavation


Calc. As = 3.70 cm
Select As = 12.72 cm

518 OK

<< Strut Beam Design


Pile Analysis

Pile Reinforcement Concrete Calculations


Longitudinal Reinforcement
dpl = Dpl - dpl
Dpl = 0 cm
Dpl = 5 cm
dpl = 85 cm
Md = MPmax a 1.5
MPmax = Mmax + Mfailure = 44340.67 Nmm
a= 1 m
Md = 66511.01 Nm
md = Md  (0.85 fcd Ac D)
p = Max ( pm ; md )
Acp = 0.636173 m
fcd = 16700 Nm
md = 8.183531
m = 0.34047
As =  Ac  ( fyd  (0.85 fcd ))
fyd = 365000 Nm
CalculationAsc = 2024.688 cm
Selection Ass = 25.446 cm 1018 NO
 = 0.004
M = 61.6843 Nm

Transverse Reinforcement
Vd = VPmax a 1.5
VPmax = Vmax + Vfail.anc = 16284.53 Nm
Vd = 24426.8 N
Vcr = 0.65 fctd Ac
fctd = 1118. Nm
Vcr = 462.6787 N
Vc = 0.80 Vcr
Vc = 370.143 N
Vws = Asw d fywd  s
Vws = 244.6253 N
Vd = Vws + Vc
Vd = 614.7683 N 815 NO

<< Pile design


Head Beam Design

Head Beam Material :


Concrete

Steel

d h = 50 mm

1400

1200
fcd-Heam = 16700 Nm
fcdt-Heam = 111 Nm
Material >>
fyd-Heam = 365000 Nm

Head Beam Analysis >>

TopBottom ofThe Head Beam


Longitudinal Reinforcement NO
Numer Diameter AreaSel. AreaCalc.
( #) ( mm ) ( cm ) ( cm )
 18 22. 100.8

18

Transverse Reinforcement NO
Diameter Spacing Vd Vd
( mm ) ( cm ) ( N ) ( N )
8 15 1177.2 366.8
Head Beam Analysis

* 1 Rov Anchors Failure !


* 3 Pile Uplift Pozition !

Pv = 313.172

1.80 1.80

2S = 3.60

Vmax = 156.586

Mmax = 2825.255

Transverse Reinforcement
Vd = Vmax 1.5
Vmax = 784.8 Nm
Vd = 1177.2 N
Vcr = 0.65 fctd Ac
fctd = 1118. Nm
Vcr = 152.7 N
Vc = 0.80 Vcr
Vc = 122.2 N
Vws = Asw d fywd  s
Vws = 244.6 N
Vd = Vws + Vc
Vd = 366.8 N
Longitudinal Reinforcement
Beam = 140.00 cm
Heam = 120.00 cm
d = 5.00 cm
d = 115.00 cm
Ac = 0.21 m
Rmax = 313.17 Nm

Md = 2825.26 Nm
md = 0.11
ρm = 0.16

Top of the Beam


Calc. As = 100.81 cm
Select As = 17.81 cm

18 OK

Bottom of The Beam


Calc. As = 100.81 cm
Select As = 17.81 cm

18 OK

815 NO

<< Head Beam Design