Central Electricity Authority Go&Dwing Operation Performance Monitoring Division

The document reports that various thermal and nuclear power units went offline on July 3, 2020 for maintenance. It lists 17 units across 13 power plants in India, along with each unit's capacity and the time it went offline. For each unit, it also notes the expected date of return and reasons for the outage such as turbine vibrations, boiler issues, leakage, electrical problems, or planned maintenance. In total, nearly 6,000 MW of power production capacity was taken offline for maintenance on that date.

Uploaded by

Data Centrum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

Central Electricity Authority Go&Dwing Operation Performance Monitoring Division

The document reports that various thermal and nuclear power units went offline on July 3, 2020 for maintenance. It lists 17 units across 13 power plants in India, along with each unit's capacity and the time it went offline. For each unit, it also notes the expected date of return and reasons for the outage such as turbine vibrations, boiler issues, leakage, electrical problems, or planned maintenance. In total, nearly 6,000 MW of power production capacity was taken offline for maintenance on that date.

Uploaded by

Data Centrum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

CENTRAL ELECTRICITY AUTHORITY

G O & D WING
OPERATION PERFORMANCE MONITORING DIVISION

THERMAL/NUCLEAR UNITS WENT OUT OF GRID ON: 03-07-2020

Date of Maintanance
Unit
Station Capacity (MW)
No
DD/MM/YYYY HH:24MM

1 2 3 4

GH TPS (LEH.MOH.) 2 210.00 03/07/2020 18:12


CHHABRA TPP 1 250.00 03/07/2020 12:00

RIHAND STPS 2 500.00 03/07/2020 23:55


TANDA TPS 5 660.00 03/07/2020 16:47

PRAYAGRAJ TPP 1 660.00 03/07/2020 00:00


KORBA-WEST TPS 3 210.00 03/07/2020 21:37
KORBA-WEST TPS 5 500.00 03/07/2020 07:05

HAZIRA CCPP 1 52.00 03/07/2020 06:07


HAZIRA CCPP 2 52.00 03/07/2020 06:07

HAZIRA CCPP 3 52.10 03/07/2020 06:07

DAMODARAM SANJEEVAIAH TPS 1 800.00 03/07/2020 20:26


METTUR TPS 3 210.00 03/07/2020 09:43
TUTICORIN TPS 4 210.00 03/07/2020 22:58

KAKATIYA TPS 2 600.00 03/07/2020 19:18


BARH II 4 660.00 03/07/2020 23:12

KAMALANGA TPS 3 350.00 03/07/2020 00:00


LAKWA REPLACEMENT POWER
5 9.96 03/07/2020 02:06
PROJECT
Total 5986.07
https://npp.gov.in 08/07/2020 15:05:57
Y AUTHORITY
NG
ONITORING DIVISION

Sub-Report - 15

Expected/Sync Date of return


remarks
DD/MM/YYYY HH:24MM

5 6

TURBINE VIBRATIONS HIGH


05/07/2020 BOILER MISC. PROBLEM

WATER WALL TUBE LEAKAGE


ELECTRICAL MISCELLANEOUS PROBLEMS

06/07/2020 WATER WALL TUBE LEAKAGE


04/07/2020 REHEATER TUBE LEAKAGE
04/07/2020 ELECTRICAL MISCELLANEOUS PROBLEMS

GRID DISTURBANCE
GRID DISTURBANCE

GRID DISTURBANCE

RESERVE SHUT DOWN / STANDBY UNIT


04/07/2020 RESERVE SHUT DOWN / STANDBY UNIT
05/07/2020 RESERVE SHUT DOWN / STANDBY UNIT

L.T.SUPPLY FAILURE.
AIR PREHEATERS PROBLEM

COAL SHORTAGE

MISC. SHORT DURATION MAINTENANCE


PAGE 1