This document provides specifications for gypsum board installation at an ANZ Royal Bank construction project in Cambodia. It outlines requirements for metal stud framing, ceiling framing, gypsum board materials, accessories and installation procedures. Key details include specifying 12mm thick moisture resistant or standard gypsum panels, 0.55mm galvanized steel studs and tracks spaced 400mm on center, and fastening gypsum board to framing with screws driven slightly below the surface.

Uploaded by

Im Chinith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views

Section 09250

This document provides specifications for gypsum board installation at an ANZ Royal Bank construction project in Cambodia. It outlines requirements for metal stud framing, ceiling framing, gypsum board materials, accessories and installation procedures. Key details include specifying 12mm thick moisture resistant or standard gypsum panels, 0.55mm galvanized steel studs and tracks spaced 400mm on center, and fastening gypsum board to framing with screws driven slightly below the surface.

Uploaded by

Im Chinith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

ANZ Royal Bank (Cambodia) LTD.

Mao Tse Tung Blvd Branch


Construction New Building June 2008

SECTION 09250

GYPSUM BOARD

PART 1 – GENERAL

1.1 GENERAL REQUIREMENTS

A. Work of this Section shall be governed by the Contract Documents. Provide


materials, labor, equipment and services necessary to furnish, deliver and install
all work of this Section as shown in the drawings, as specified herein, and/or as
required by the job conditions.

1.2 SECTION INCLUDES

A. Metal stud wall framing.

B. Metal channel ceiling framing.

C. Gypsum board.

D. Taped and sanded joint treatment.

1.3 SUBMITAILS

A. Product Data: Provide data on metal framing, gypsum board, joint, tape and
batten.

B. Shop Drawings: Indicate special details associated with metal suspension system
and supports.

1.4 QUALITY ASSURANCE

A. Perform Work in accordance with all applicable local codes.

B. Maintain one copy of each document on site.

1.5 QUALIFICATIONS
A. Applicator: Company specializing in performing the work of this section with
minimum three years documented experience.

B. Use only skilled and experienced gypsum drywall installers for laying up the

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

gypsum board, fastening, taping and finishing.

C. Helpers and apprentices used for such work shall be under full and constant
supervision at all times by thoroughly skilled gypsum drywall installers.

D. In the acceptance or rejection of installed gypsum drywall, no allowance will be


made for lack of skill on the part of installers.

1.6 PRODUCT HANDLING


A. Protection :-

Use all means necessary to protect gypsum drywall materials before, during,
and after installation and to protect the installed work and materials of all
other trades.

B. Replacements :-

In the event of damage, immediately made all repairs and replacement


necessary to the approval of the Architect and at no additional cost to the
Owner.

PART 2 - PRODUCTS
2.1 MANUFACTURERS – GYPSUM BOARD SYSTEM
A. Thai Gypsum Products Co., Ltd.

B. The-Siam Gypsum Industry Co., Ltd.

C. Other acceptable manufacturers offering equivalent products, accepted by the


Architect.

2.2 GYPSUM BOARD MATERIALS


A. Moisture resistant panels: All moisture resistant gypsum panels indicated on the
Drawings shall be 12.0 mm. thick panels, clearly labeled as moisture resistant, and
conforming with the requirements of T.I.S. 219-2521.

B. Other gypsum panels: All other interior gypsum panels shall be the product of one
manufacturer, shall be tapered edge for finished surfaces and butt edge for
concealed surfaces,12.0 mm. thick, and shall conform with the requirements of
T.I.S. 219-2520.

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

2.3 FRAMING MATERIALS

A. Studs and Tracks: ASTM C645; galvanized sheet steel, 0.55 mm. thick, C shape,
with knurled faces.

B. Anchorage to Substrate: Tie wire, nails, screws and other metal supports, of type
and size to suit application; to rigidly secure materials in place.

C. Ceiling Framing Members shall be as shown the drawings or the follows:

1 Hangers for the suspended ceilings: 1-l/4" x 1-1/4" x 1/&," steel angles, 1-
114" x 1/8", steel straps or l/4" diameter threaded steel rods with
lockwasher and nuts, bolted to the channel runner. Bolted connections shall
be capable of supporting 200 lb. plus the dead load of the ceiling.

2 Furring channel clips shall be the galvanized steel made especially for the
purpose.

Clips shall be capable of supporting a 200 lb. load plus the dead load of the
ceiling.

3 Main runners: 1-1/2" cold-rolled steel, 4751bs. per 1,000 lin.ft.

4 Furring channels: rolled-formed, hat-shaped steel section, 7/8" depth.

D. Acceptable Manufacturers

1 Donn. Far East SDN. BIID.

2 Arcon Type

3 Thanakoon Bangkok Co., Ltd.

4 TO Rondo

5 or equivalent accepted by the Architect.

2.4 ACCESSORIES
A. Fasteners: All fasteners shall be metal screws specially designed for
application of gypsum panels to metal studs and shall be the length and pattern
recommended by the manufacturer of the gypsum panels used.

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

B. Metal Cornerbead and Trim : All metal cornerbead and trim, and all accessory
items, shall be a system recommended by the manufacturer of the gypsum
panels used as being compatible with the gypsum panels.

PART 3 - EXECUTI0N
3.1 EXAMINATION
A. Prior to all work of this Section, carefully inspect the installed work of all other
trades and verify that all such work is complete to the point where this
installation may properly commence.

B. Verify that gypsum drywall may be installed in accordance with the original
design, all pertinent codes and regulations, and the manufacturers'
recommendations as approved by the Architect.

C. In the event of discrepancy, immediately notify the Architect.

D. Do not proceed with installation in areas of discrepancy until all such


discrepancies have been fully resolved.

3.2 CEILING FRAMING INSTALLATION


A. Coordinate location of hangers with other work.

B. Install ceiling framing independent of walls, columns, and above ceiling work.

C. Reinforce opening in ceiling suspension system which interrupt main carrying


channels or furring channels, with lateral channel bracing. Extend bracing
minimum 600 mm. past each end of openings.

D. Laterally brace entire suspension system.

3.3 METAL STUD INSTALLATION

A. Install studs in accordance with manufacturer's instructions.

B. Metal Stud Spacing: 400 mm. on center.

C. Refer to Drawings for indication of partitions extend stud framing through the
ceiling to the structure above. Maintain clearance under structural building
members to avoid deflection transfer to studs. Provide extended leg ceiling

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

runners.

D. Door Opening Framing: Install double studs at door frame jambs.

E. Blocking: Install blocking for support of plumbing fixtures, toilet partitions, and
toilet accessories.

3.4 WALL FURRING INSTALLATION

A. Erect wall furring for direct attachment to concrete walls.

B. Erect furring channels vertically; space 400 mm. on center from floor and ceiling
lines.

C. Erect free-standing metal stud framing tight to concrete walls, attached by


adjustable furring brackets in accordance with manufacturer's instructions.

3.5 GYPSUM BOARD INSTALLATION

A. Erect single layer board in most economical direction, with ends and edges
occurring over firm bearing.

B. When cutting gypsum drywall is required, cut by scoring and breaking or by


sawing, working from the face side.

C. When cutting by scoring, cut through the face paper and then snap the panel back
away from the cut face; then break the back paper by snapping the gypsum board
in the reverse direction or by cutting the back paper.

D. Smooth all cut ends and edges of panels as necessary to obtain a smooth joint.

E. For cut-outs in panels for pipes, fixtures, and other small openings, make holes
and cut-outs by sawing or by such other method as will not fracture the core or
tear the covering and with such accuracy that plates, escutcheons, or trim will
cover the edges.

F. The use of score and knockout method' will not be permitted.

G. Use screws when fastening gypsum board to metal furring or framing.

H. Drive the fasteners slightly below the surface of the board, with heads forming a

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

slight depression below the surface of the drywall. Fasteners shall not be driven
closer than 3/8" from the edges and the ends of the boards. Hold the drywall
adjacent to the fastening joint tightly against the framing members while driving
fasteners. Dependence on the fasteners to draw the drywall against the framing
shall not be acceptable.

3.5 GYPSUM BOARD INSTALLATION

A. Install gypsum board in accordance with manufacturer's instructions.

B. Erect single layer board in most economical direction, with ends and edges
occurring over firm bearing.

C. When cutting gypsum drywall is required, cut by scoring and breaking or by


sawing, working from the face side.

D. When cutting by scoring, cut through the face paper and then snap the panel back
away from the cut face; then break the back paper by snapping the gypsum board
in the reverse direction or by cutting the back paper.

E. Smooth all cut ends and edges of panels as necessary to obtain a smooth joint.

F. For cut-outs in panels for pipes, fixtures, and other small openings, make holes
and cut-outs by sawing or by such other method as will not fracture the core or
tear the covering and with such accuracy that plates, escutcheons, or trim will
cover the edges.

G. The use of score and knockout method' will not be permitted.

H. Use screws when fastening gypsum board to metal furring or framing.

I. Drive the fasteners slightly below the surface of the board, with heads forming a
slight depression below the surface of the drywall. Fasteners shall not be driven
closer than 3/8" from the edges and the ends of the boards. Hold the drywall
adjacent to the fastening joint tightly against the framing members while driving
fasteners. Dependence on the fasteners to draw the drywall against the framing
shall not be acceptable.

J. All boards shall fit tightly against the supporting framework before applying the

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

joint treatment and the concealing screw depressions.

3.6 JOINT TREATMENT

A. Treatment for Joints


1. Tape, fill, and exposed joints, edges, and comers to produce smooth surface
ready to receive finishes.

2. Feather coats onto adjoining surfaces so that camber is maximum 1.6 mm.

3. Taping, filling, and sanding is not required at surfaces behind adhesive applied
ceramic tile.

B. Joint Compound and Taping

1. Mix the joint compound in strict accordance with the manufacturer’s


recommendations.

2. Apply the taping or the embedding compound in a thin uniform layer to


all joints and angles for be the reinforcement. Immediately apply the
reinforcing tape centered over the joint and seated in the compound.
Sufficient compound-approx. 1/64" to 1/32" must remain under the tape
to provide the proper bond. Follow immediately with a thin coat to
embed the tape, but not to function as a second coat. Fold and embed
tape properly in all interior angles to provide a true angle. The tape and
the embedding coat must be thoroughly dry prior to the application of the
second coat.

3. Apply the second coat of the joint compound over the embedding coat,
filling the panel tape flush with the surface: cover the tape and feather
slightly beyond the first coat. On the joints with no tapes, cover the tape
and feather at least 4" on either side of the tape. Allow the second coat to
dry thoroughly prior to the application of the finishing coat.

4. Spread the finishing coat evenly over and extensively somewhat beyond
the second coat on all joints and feather to a smooth uniform finish. On
the tapered edges, do not allow the finished joints to protrude beyond the

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

plane of the surface. Apply a finishing coat to cover the tape and taping
the compound at all tapered angles to provide a true angle. Where
necessary, sand between the coats and after the final application of the
compound to provide a smooth surface ready for the decoration.

C. Finishing Fasteners

1. Apply taping compound or an all-purpose type compound to the fastener


depressions as the first coat. Follow with a minimum of two additional
coats of topping or all-purpose compound, leaving all depressions level
with the plane of the surface.

D. Finishing Beads and Trims

1. Apply the first coat to all beads and trims and properly feather them
from the ground to the plane of the surface. The compound must be
thoroughly dry prior to the application of the second coat.

2. Apply the second coat in the same way as the first coat, extending the
compound slightly beyond the first coat. The compound must be
thoroughly dry prior to the application of the finishing coat.

3. Apply the finishing coat to all beads and trims, and the compound
slightly beyond the second coat and properly feathering them from the
ground to the plane of the surface. Sand the finish as necessary to
provide a flat smooth surface ready for the decoration.

3.7 TOLERANCES

A. Maximum Variation of Finished Gypsum Board Surface from True Flatness: 3


rom. in 3 m. in any direction.

3.8 PREPARATION FOR FINISHES

A. Fill, spackle and sand gypsum drywall surfaces having the depressions, gouges,
cuts and dimples to present a smooth level surface acceptable for painting by
other trades.
B. Spackle the openings around the pipes, the switches and other framed openings.

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

3.9 CLEANING
A. Upon the completion of each phase and area, remove the rubbish from the site,
leaving the floors broom clean. Excess materials, scaffolding, tools, and other
equipment shall be removed from the building and the job site.
B. Remove the joint compound from the doors, the door frames, the windows, the
floors and all other surfaces not scheduled to receive its application promptly
upon its accumulation.