Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
100%
(1)
100% found this document useful (1 vote)
358 views
5 pages
Daihatsu FUEL PUMP STICKING
Uploaded by
Виктор Медведев
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save Daihatsu FUEL PUMP STICKING For Later
100%
100% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
100%
(1)
100% found this document useful (1 vote)
358 views
5 pages
Daihatsu FUEL PUMP STICKING
Uploaded by
Виктор Медведев
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save Daihatsu FUEL PUMP STICKING For Later
100%
100% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 5
Search
Fullscreen
No.s16-008 eae BBR me OSAKA, 92076 APAN ae 4 SBME F OMB OUT susvect Plunger Stick of FO. Injection Pump aA ae HFO 380~700 cSt {#8 DK, DC, DE WORM lapeticaace enaane | DK. DC, DE type GENERATOR ENGINE with KFO 380~700 e8t FUEL OIL ne NOTE SEER AY 7 OR EEN SAGEM SREY, Recently we have experienced daroge ofthe puro tat seems to be MY KY FOMAOREAKICONT bEMEL TED, ZO os Pa CORT LOS LAMM SLORRE FE LTE ROR! ZOMREELO TBO ET, PALIT ILI RAEI TF YP BRDEROOMRERN TORT, BRELELTAS OWS, HRRMOLE FIC D Mat AEC EDRMORME, 7977 OAC ERB EO RELI 70 > 7 AMREN TED ET, Uae) 7 oMRORRL RE) WEED REEL ALONE AT LERER, HALO PPL DEBOBKE LCE FRO 2B ame 4 1H Mane LTO eM KE STE 2 Sanat ; Pee SURO RMTSME LCoS HELE LARUE, caused by stick of the plunger of the F.O nection pump. Ax the result of nepaction, we found thatthe stick ofthe plungar is caused by varias tnd diferent factors. This Technical Information summaries the ‘heromenon and eauses based on our experiences that has beon gained ‘rough Feed back from the feld as well a various investigation rests, We have recsived reports about Plunger Stick of FO injection purp (coating type plunge) The incdents were mostly acknowledged by the excessive devation ofthe exhaust gas {amporature (alarming), krocking sound when the plunger sick was occurred and ticking ofthe rack bar ofthe F-0. jection ‘bump that is found when the engine was stopped |LLPhenomenon and Factors of the Plunger Stick] We ean classify the factors of Plinger Stck in two categories of followings in accordance withthe analysis report ofthe failures, 1) Seizure occurred mainly at phnger body The damage tock place at the center pat of the plunger with wide area, The surface the barrel becomes rough and the {2p between the plunger snd the barel becomes worn fe wel, When the HO isnot completely replenished «and Femained inside of the pump, the residual remains and Ceeled down by MDO oF MGO, increase the resistance and reduce the clearance and finaly cause the seizure, Daphee Gre sms O77 LPL AC ORME 125797 Fe BE 8, DBE, 997 iS Bhi BA. ET FY Acmsint Ebene, BRULEE Y We AMICAL HY SHEN RUHL SMC AMGIC LB eM eR WAYNE SUTRR LOC WO ETO OBS ORT, LORE IV TY EAL AOMNMIR 1207929 val LIRR ORE HAPS I PMB WEL CHRON C20 BY, 2) Even if the plungor and barel do not have soratches and/or Seizure, Ue gap batween plunger and bara smaller, and the plunger shows the same damage tke the stick In this ease, although the FO rack show stuck condtion, but ‘may move again after the ar running or the worst case ‘the rack bar is kopt in stick condition. As forthe factor, {2 thinefm ike coating is formed with Zine and Sulfur adhesive tothe inner surface of the barrel and the outer surface of the plingERI ERS RRGMRT IIT, Monica RIL COE AO CHE RIDIL ETE Sv MRO 2 teROmR] Rao OBA 2 L-CS Nt AAR ARSE EOMEH 8 eA x OME ARSE ATL REVEL SLL LT Io ORME 1297971 OSAMGSRET, QoS —7 4 MERI IY PrORaNt, 2 DRERMAE BLY HIE Heese, DMRS MS OR < 22, ARRAS HAARE AD Eee 7 977 aL ET, Ae Leeann 7 eo CM LAER, MRE READ (Oc BUA LEE LE, PARC LORIE, Chime rea BUA BER, BHI Y AORN ORI RMSRRRCA TENS LBMETS = LAME OEY, mre i eo | == eRe aRe aoe Bn nner mi om ° it Come i «fet me “The tin-flm ke coating grows a6 thick a8 meron proportional to the operation hours In the ease. once te plunger and the barrels cleaned and ound no ertches or sezuro, te plunger and the Barel can bo used further Inner Surface of Baro 2 [Consideration for formation of the thin-film lke coating J ‘Aa a tendency of the recent malfunction, wen the thin-fm Ike costing i formed inside ofthe barrel, grows vp and ts thickness exceeds more than 6 merons andthe thin-film lke coating i generated at more than half ofthe tircunference of the barre the clearance between the barre! andthe pliner decreases jeopardizing the movement lof the plunger. The plunger withthe carbon coatng featur low friction by ‘the coating, thus it ean stand with stick in short tme however ifthe clearance between the plunger and the barel decreases tue to formation ofthe thir-filn tae costing, the plunger finaly stuck and as general tendency, sticks atthe top ofthe F.0. tam stroke, [As a result of vestigation of damaged ful injection pumps, ie was identified that the thin-film like costing fe made of compound of zine and sub. ‘The auf is derived from the fuel oll hile zine and calcium are derived from additives ofthe lubricating oi The bench test that i conducted by lsboratory confns that these elements forms thin-film Ike coating under higher temperature condition. BOD KLLATDO NR MOM ER SBME *) FX analysis result of thin film-like coating3. [HawREOA = XA] LRnEmORE sn Sak TARE CH LIER, 1, ARLE RY RROD 7 ine 25 2. HAODTRR, 792 Ir Me wich Lo URE RCL HRRR Efe CH Ree LT 8, ARIE C18 LAAN LRAT S BH mn, ERODED R O79 Pa REA ORAS RUM LBS RSWIMB SRE, BLT IZ Te DEIIDOTEC ERAS HL ZOE AMET BOONE RAT CHAO ERIM E NTS LUE TH, eRLEY. ees COS EAOPAMIRAOSOTICSRT SE tat 4 77 v exon LO 2 BOI CORE LE LCRA L-CISAR Wy BA EEO AICIY Bb GHW EU MESH EEN RIT I rT 8 AR ET, FERNS REIS 8 ELC I EN CES, RAE FEICRLET, ft 1. MARMROB OH AMMMNRE TINE EEN, ARNRR:5~ 100/89 2. EOL 9NDORUAGOICHD HX SMO TAUTE APRAEBL LORS EORVRREDN CHM, LORD, WOKE 3 OBELED DIARY TREE ARTES OMELET 2, EO1K 5 ALUNICRRBNELET D PLEIN 709 7 OMS EMTS, MEY AP IC ko CASSEL LORRAIN 72 AAbHETO, TOMAR MAETICY MDM ome ROLES, 8. AREY 7 oat: SETAE 7-309 000~ G0 CO EAA LORIMER TRITIYI, ROEM OLTD RENEE, Leow Hi eeR UCOET 27972 veo SEN OGUR LB, tie 9 04) Leese L CHa BRL, MeOH kis ZOM SH COs ET. ZOE DI MMIC NRT OY EBT S. ERD IRE, MAORI Y CARD D ET, AL HaORe THI Fee RAT, 1 ABER OTOANNLE SOREL LAP Zu, rT 2 RL FIRM ES, ODMR | DHS IE LCM ERS SL RIPE GAIN? 4 kel ISH 7 ORR UNIONS DMI MI=Wwo, MoOIcHID ABE “cht ‘8.[Mechaniom of formation of the thin-fim lice coating) “The reel that wat confirmed by «sane king exaination to elucidate the gneraton mechariom ofthe thir fin tke svt se mentioned above ies follows {Dn the sae! coking examination, the sample geace (SCM#80 mates) teat haated up an the thin fm le coating i generate when a heating ferrgeratare reached 230°, 2) Ana result of analyse of adhsion the nradont constitution was the sune as forthe fl that was found the Pinger and Baral {DR wae confnred that longor the testi perio. thixer the coating ‘thane ie confirmed Wren the temperature ofa pings and the bral rgher th tn-fim tho coat becomes ticker However, tte beleve that he tompersture ofthe pang doesnt ineease at Fig a 250°C and we judged tet coud be accelerated under ie ign pressure 4. [Countermeasures for Plunger Stick] ‘As emlaied nthe above“ L{Phenorenon and Factors of the unger Stil tere are two factors for fares such asthe ace which longer sick occur atthe tine af «changing the ‘oll thus HFO is net bing corpletely replaced and ether fave winch» plunger stick occur fer uae of reulrntoral, “Therefore we wows The you to cerry out the fuel ol chenge ver correcty'naseardance with the engine natruction ‘eanual (rts! points are shown as foows Juin the oate of fue changes. ‘Temperature Inclination Rate: §-10°C/in. 2 When changing the fuel ol to MDO or MGO from HFO, apply the load ‘more than the lower loa lint higher a possible of the engine ‘output and carry out clearing operation with th load more than 80 Ininutes wth MDO or MGO. Stop the engine afterwards within fve minutos. Confer the movement ofthe rack af the fuel ijection pump afer stop ofthe engine ‘The required tine of complete replenishment from the HFO to MDO ‘or MGO subject tothe actual capacty ofthe fuel ol supply system, £0 please confirm the actual tine required for the complete replenishment. hange over, avoid any sudien temperature Fuel jection Purp shall be martamed at each 4000~6000 engine running hours. The cleaning of a plunger and the barrel are recommended whenever you do the maintenance a5 Shaveng fin the next page In doing 30, the clearing of the plangor and the barrel is recommended as shown inthe rext page When fuel oi of more than $80 oSt as chown in the above is used, adattves (ze, calium) those elamants are Served from the ibriating ol and sulfur derived from the FO react and generate tin-fim ike costing and its thickness inreases with engine running hours. ‘Thatefore itis effective to prevent the stick by the thir-flm lice coating by removing such coating wth the cleaning procedure forthe bara and the plunger regularly atthe ‘maintenance of FO. injection pump. In adétion, followings {re recommanded to decrease the adhesion ofthis Ike ‘eating 1) FO heating temperature shall nt be more than required ‘The FO temperature tobe as low as possible tobe kept vithin the allowable lower it. 2) HFO shal be circulated stale and constant fow with enough quant {9 FO circulation flow shall not be stopped even if engine is atthe stopping condition For example, when you re the fuel line and /or the plumbing werk i necessary, ‘change the fuel oi fom HFO t2 MDO/MGO before hand‘Seitehing trom Diesel Fusl Ol te Heavy Ful Os Vecuty at egg et ‘5. [RECOMMENDED CHANGE OVER PROCEDURE 1 4 LOAD to be applied at the time of the fuel oll change over period $ _ Hm (kWe) LowLoad Limit ii lEngine Type ‘Output (ke) tke) sf [nine speed [7207750 min-1] 900min-1 [720/780 min-]_ S00min1 rH fsoc-1710) NA 85 WA > 100 ~ [sOC-171A) N/A 580. NAL > 120 = fox-20 0 70 | > 0 | > 160 | Se ce | te | ome | ca | sam oven san ey fox-z6 1720 wa | >250 | Wa af of nL Woe es | wa | >a50 | wa 2 foxze 7015 wa >«o | Wa 1) (sae, | [cna ene ee ox-za ao wa | >50 | wa B] [Seteerme| [stommeem te joe-1e 5 aio [_> 129] > 0 ° [sor-29 140 1425 > 230 > 300 Say | ocnse 205 wa | >s00 | wa eoc-ae seo wa | >e00 | wa Taihchang fom Paavy Poa Gi a iawat Fost OF si a abate hy Sm outta a 3 = Smad i — ' Cases simi zs \ eee 5 Scronwcneattol a | — i i 6. L792 91 RMI4 07 409-O8% 1 De-S2MIRRIIC CARMA L NRA FRIe Le, BEAL RIL CRO CAP BUR TORE IET ZH ELE ombewa conn, iret cid LORRET IY Ty OBROMBE SA GET. ERED AY hOGMLTHSHED LSD eat [osor3] EBA, 9. Damage ofthe ftar eloment for the plunger hérication J “The attached dela shows the damage ofthe flr netald on Do-82 “The serene deform and its fitration sen has gone hes iso lng working a theft forthe alanger ication ne “The element was deformed so i was not aopery ted, and caused pungs sek Refer to tochical information (6507-18)1 79724 ALOM MEL PRIN 7RRBLES 279 2 rR AURORE RIC SLAF OCIEMCE RO, ‘SIMONE: 4000~6000 EMIS (792 oe eT PS OC COMMER 7 EARL, TIL TT RULER AE, Om REM 8, 1) eR (seam Yt 2) ABYFLIA b (BBO OF: BM Ay Ke. 748) 3) me QAaYFTI4 PERU, BERD EY AAO NT, AOD AIRE HD, QAA FIFE HEBER IEA LANIBIMAL RU aeRO, 93 OI) SURE L FICUhL aaa, OFFI YMAWTH, ABV FIFE KEATS MRE AT RECHT, MRR, MOURMET Ty REMUS A ALS PRE LEED AYDEN MS CRIT 8, ‘Thin ike coating 7 Cteaning method of the Pinger and Barrel] The clearina method explained as follows shal be raferred when ou carry oUt inspection ofthe plunger stick and leo {atthe time oF the fuel ol injection pump maintenance. Mairtanance interval: At every 4000~8000 operation hours {Clearing method of the plunger barel inner surface) (Doicmartle the fuel injection pump and remove the slunger and the barrel. @ Prepare the clearing took. 1) Barrel clearing bar forthe electri ding machine) 2) Scotch Bright (# 800 or equivalent: 3M pad No.7448) 3) leaning Oil (Kerosene) @ lnmarse Scotch Brite to kerosene, and wrap ito the tip of ‘the bar and then attach the bar tothe electric dling machin @ Wan above Scotch Brite around the bar and insert it to the barrel inside and starts dell and then move itup and down for abovt 30 seconds ‘As forthe Plunger, Wrap the plunger wth the Scotch Brite and sorb the surface gently © Use clean washing ol so theta smal lion substance isnot left inthe pnger surface and barel ater clearing “Tool name Bar, barel cleaning Parts No.NWOOBO1O8«A ‘Seoweh Bite Parts No. NWO0EO22144 (GM: No.74¢8) #800 ofthe barrel {Lut the pad 50 to 60 mm length 2.lnsert the pad inthe sit and wrap around the bar aso fallow the turing rotation ofthe cil 3. The lamete of the padi adjusted soasto sightly exceed the inner bore
You might also like
RT-123 - A3 - Issue4 - Inspection and Over
PDF
No ratings yet
RT-123 - A3 - Issue4 - Inspection and Over
7 pages
SKF Thap 030
PDF
No ratings yet
SKF Thap 030
102 pages
RT-221 Glogging of Main Fuel Injector Nozzle Tip Operation Instruction
PDF
No ratings yet
RT-221 Glogging of Main Fuel Injector Nozzle Tip Operation Instruction
7 pages
Honing Deglazing 4 Stroke Engines Dec 2018
PDF
No ratings yet
Honing Deglazing 4 Stroke Engines Dec 2018
5 pages
4611V015 - 01gb Big End Bearing Bore
PDF
No ratings yet
4611V015 - 01gb Big End Bearing Bore
1 page
HTTP Bulletins - Wartsila.com Bulletins File Wfi ws07q287 01gb
PDF
No ratings yet
HTTP Bulletins - Wartsila.com Bulletins File Wfi ws07q287 01gb
4 pages
Bulletin #D4E
PDF
No ratings yet
Bulletin #D4E
2 pages
Bulletin #D19E
PDF
No ratings yet
Bulletin #D19E
2 pages
Service Info No. 0016 - Com
PDF
No ratings yet
Service Info No. 0016 - Com
1 page
Nohab Acceptance Criteria For The Usability of Plunger and Barrel Assemblies
PDF
No ratings yet
Nohab Acceptance Criteria For The Usability of Plunger and Barrel Assemblies
1 page
Service Bulletin - (IO00-0000-12) - Fuel Oil Specification
PDF
No ratings yet
Service Bulletin - (IO00-0000-12) - Fuel Oil Specification
2 pages
Bulletin #D1 E
PDF
No ratings yet
Bulletin #D1 E
4 pages
Notes On Cylinder Head Packings: Bulletin #D3f - English
PDF
No ratings yet
Notes On Cylinder Head Packings: Bulletin #D3f - English
2 pages
Support Surfaces For The Piston Crown-3211V025GB
PDF
No ratings yet
Support Surfaces For The Piston Crown-3211V025GB
2 pages
SL2018 656
PDF
100% (1)
SL2018 656
2 pages
Damper 15.3
PDF
No ratings yet
Damper 15.3
44 pages
Wartsila 32 - Instruction - Fretting On Support Surfaces
PDF
No ratings yet
Wartsila 32 - Instruction - Fretting On Support Surfaces
5 pages
Att DSTA00012745 - c48 10 5u 1 - A - en
PDF
No ratings yet
Att DSTA00012745 - c48 10 5u 1 - A - en
41 pages
Pci 413
PDF
No ratings yet
Pci 413
3 pages
Nohab Polar Cylinder Heads Modification
PDF
No ratings yet
Nohab Polar Cylinder Heads Modification
1 page
Maintenance Manual ZAL40S Int Use
PDF
No ratings yet
Maintenance Manual ZAL40S Int Use
313 pages
RTA-42 - 1 - Templates For Exhaust Valve Seat and Spindle
PDF
No ratings yet
RTA-42 - 1 - Templates For Exhaust Valve Seat and Spindle
6 pages
Cylinder Head Safety Valve: Pbosf'b Ibqqbo
PDF
No ratings yet
Cylinder Head Safety Valve: Pbosf'b Ibqqbo
4 pages
M1-6 With BHP
PDF
100% (1)
M1-6 With BHP
33 pages
Service Bulletin S - 3: Technical Information To All The Owners of Sulzer S 20 Type Diesel Engines 01.09.94
PDF
No ratings yet
Service Bulletin S - 3: Technical Information To All The Owners of Sulzer S 20 Type Diesel Engines 01.09.94
4 pages
TM410 Leaflet
PDF
100% (1)
TM410 Leaflet
4 pages
Service Bulletin S - 10.2: Technical Information To All Owners / Operators of Sulzer S20 Engines 26.03.99
PDF
No ratings yet
Service Bulletin S - 10.2: Technical Information To All Owners / Operators of Sulzer S20 Engines 26.03.99
6 pages
Sulzer-Rta76.part 2
PDF
No ratings yet
Sulzer-Rta76.part 2
206 pages
Wartsila Vasa 32 - Service Letter - Camshaft Driving Gear & Intermediate Wheels
PDF
No ratings yet
Wartsila Vasa 32 - Service Letter - Camshaft Driving Gear & Intermediate Wheels
2 pages
F10 Oversize Piston Rings
PDF
No ratings yet
F10 Oversize Piston Rings
2 pages
Wartsila Vasa 32 - Instructions - Wear Criteria For The Connecting Rod Small End Bearing Bush
PDF
No ratings yet
Wartsila Vasa 32 - Instructions - Wear Criteria For The Connecting Rod Small End Bearing Bush
2 pages
Ss-đã Chuyển Đổi
PDF
No ratings yet
Ss-đã Chuyển Đổi
10 pages
6r32 SPC 380pages Contents
PDF
No ratings yet
6r32 SPC 380pages Contents
27 pages
Working Instructions
PDF
No ratings yet
Working Instructions
666 pages
RT-161 A1 PDF
PDF
100% (1)
RT-161 A1 PDF
8 pages
Assembly and Replacement of Connecting Rod Bolts - Supplement
PDF
No ratings yet
Assembly and Replacement of Connecting Rod Bolts - Supplement
7 pages
sl2023 744
PDF
No ratings yet
sl2023 744
27 pages
WS16T003 - 03 - Injector Test Rig Improvement
PDF
No ratings yet
WS16T003 - 03 - Injector Test Rig Improvement
5 pages
Nohab Polar Charge Air Cooler Cleaning System
PDF
No ratings yet
Nohab Polar Charge Air Cooler Cleaning System
2 pages
Records: Big End Bearing Bore
PDF
No ratings yet
Records: Big End Bearing Bore
1 page
ISO Metric Threads: 5. Use of ISO Metric Threads On PS-26D (E) Engine Parts DAIHATSU Has Marketed The PS-26H Engine, An
PDF
No ratings yet
ISO Metric Threads: 5. Use of ISO Metric Threads On PS-26D (E) Engine Parts DAIHATSU Has Marketed The PS-26H Engine, An
1 page
MAN Prospekt
PDF
No ratings yet
MAN Prospekt
35 pages
раздел 11
PDF
No ratings yet
раздел 11
29 pages
Wartsila 46 - Technical Bulletins - Upgrading of Schaller Oil Mist Detectors
PDF
No ratings yet
Wartsila 46 - Technical Bulletins - Upgrading of Schaller Oil Mist Detectors
1 page
WARTSILA - Crankshaft Measurement Record
PDF
No ratings yet
WARTSILA - Crankshaft Measurement Record
1 page
Techno News: Spray Shielding of Flammable Oil
PDF
No ratings yet
Techno News: Spray Shielding of Flammable Oil
3 pages
Rta62u-B - 03
PDF
No ratings yet
Rta62u-B - 03
66 pages
Lubricating Oils rt-138 - A1 - Issue2
PDF
100% (1)
Lubricating Oils rt-138 - A1 - Issue2
18 pages
Evaluation of Operation data-0-000R04CBA101A001L - 01en
PDF
No ratings yet
Evaluation of Operation data-0-000R04CBA101A001L - 01en
33 pages
RTA-65 Daros Chromium-Ceramic Piston Rings
PDF
No ratings yet
RTA-65 Daros Chromium-Ceramic Piston Rings
6 pages
Piston Bolts WS11T301 - 01gb
PDF
No ratings yet
Piston Bolts WS11T301 - 01gb
3 pages
M-28-3 Main Engine (3-6)
PDF
No ratings yet
M-28-3 Main Engine (3-6)
623 pages
Data & Specifications: Wärtsilä Low-Speed Engines
PDF
No ratings yet
Data & Specifications: Wärtsilä Low-Speed Engines
3 pages
3211 T035 GB
PDF
No ratings yet
3211 T035 GB
2 pages
RTA Series Piston Rod Service Bulletin
PDF
No ratings yet
RTA Series Piston Rod Service Bulletin
7 pages
A - 15 Service Bulletin: 03.02.97 Technical Information To All Owners of Sulzer A Type Diesel Engines
PDF
No ratings yet
A - 15 Service Bulletin: 03.02.97 Technical Information To All Owners of Sulzer A Type Diesel Engines
4 pages
RT-96 - Exhaust Valve Spindle Lubrication
PDF
No ratings yet
RT-96 - Exhaust Valve Spindle Lubrication
6 pages
CAV Fuel Injection Nozzles PDF
PDF
No ratings yet
CAV Fuel Injection Nozzles PDF
11 pages
ME Fuel Pumps Timing Adjustment
PDF
No ratings yet
ME Fuel Pumps Timing Adjustment
9 pages
Aircraft-Power Plants
PDF
No ratings yet
Aircraft-Power Plants
116 pages