Daily Activity Report: - KSA Team

The daily activity report provides a summary of tasks completed by the KSA Team on June 1, 2020 working from home. Key activities included submitting technical offers for various service projects, reviewing service case bids with the sales team, preparing revised delivery notes, following up with suppliers on deliveries, and completing online training modules. Issues reported were delivery delays of industrial switches from China and postponed site surveys due to COVID-19 restrictions.

Uploaded by

Haidar Ali Zaidi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views2 pages

Daily Activity Report: - KSA Team

The daily activity report provides a summary of tasks completed by the KSA Team on June 1, 2020 working from home. Key activities included submitting technical offers for various service projects, reviewing service case bids with the sales team, preparing revised delivery notes, following up with suppliers on deliveries, and completing online training modules. Issues reported were delivery delays of industrial switches from China and postponed site surveys due to COVID-19 restrictions.

Uploaded by

Haidar Ali Zaidi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

- KSA Team

Daily Activity Report


Dated 6/1/2020 Report No. 43

Team Lead Haidar Ali Zaidi Location Work From Home

Team Members Haidar

Project Name Services, Sakaka, Marjan TCF, Sabic HQ

Weekly Planned Activities Daily Planned Activities

S.No Description Status Activities Planned Activities Performed

Services : On-call discussion with GCIR Client


Services : On-call discussion with GCIR
for upcoming Service cases for upgradation of
Services : Submission of techno-commercial offer Client for upcoming Service cases for
1 PLC panel & Engineering workstations. RFQ
to Sinopec for Telecom Systems upgradation of PLC panel & Engineering
received on mail for GE system upgradation &
workstations
Mistubishi Controller replacement

Services : Submission of revised techno-


Services : Review with Sales team for Services : Review with Sales team for Service
2 commercial offer to Ma'aden Aluminium Smelter
Service cases bid till date cases bid till date.
Plant as per comments received

Marjan : Submission of invoices for April & May Marjan : Preparation of revised Delivery Marjan : Preparation of revised Delivery note
3
(advance) note for Cisco Firewall for Cisco Firewall

Marjan : Services PR creation & release for OEM


Training : Successfully completed Nokia
4 services required at site during commissioning Training : Schneider/Nokia Online Training
Training on LTE Radio Interface - Physical Layer
stage

Marjan : Follow up with DHL team for FEC


Sabic HQ : Preparation of S-Curve for Master log Marjan : Follow up with DHL team for FEC
5 cabinet delivery in Marjan. Details of Client
to review Procurement & Projects progress cabinet delivery in Marjan
team at site updated with DHL

Training : Successfully completed Nokia


Services : Finalization with MAPA with regards to
6 Training on 1830 Photonic Service Switch 4
Ihsa Water Improvement Project
R7.0 Architecture Hardware

Services : Submission of AMC & Spares Supply Training : Successfully completed Schneider
7
offer to NOMAC for Sakaka Power Plant module on Networking
Issues & Bottlenecks Being Faced Work From Home Inputs

S.No Description On Hold With Particulars Yes/No

Industrial switches for Marjan to be re-ordered, previously


My IS and I know what deliverables we have
1 considered OTS switches having deilvery issues since manufacturing Projects Yes
planned to complete today
work being done in China

I was able to adhere to my normal work timings


Yes
today

I have attended to & returned all phone calls


and have responded to all my internal and Yes
external official mails

There is no action pending with me regarding


my business responsibilities including with a Yes
customer

I have not left my home today Yes

REMARKS :
*Site surveys to Maaden & SWCC , with regards to Services cases, have been postponed by Client due to Covid19 Pandemic. No outsiders are being allowed
presently to visit industrial zones.