Schedule - M - FORMULA
Schedule - M - FORMULA
SUBSTRUCTURE
SITE PREPARATION
EXCAVATION
Excavating
Disposal
Excavated material
DISPOSAL OF WATER
Generally
Generally
Sides of excavations
2/1/1
HARDCORE OR THE LIKE
Hardcore
Beds
ANTI-TERMITE TREATMENT
d. to backfilling 0 cm 4,500 0
Blinding
Foundations in trenches
f. irrespective of thickness 9 cm
Beds
h. generally 1 cm
Ground beams
REINFORCEMENT
In any location
d. 10 mm 0 kg 1,800 0
f. 16 mm 0 kg 1,800 0
f. 20 mm 0 kg 1,800 0
Fabric; B. S. 4483
Formwork generally
BLOCKWORK
Walls
2/1/3
DAMP PROOF COURSES
Horizontal
Horizontal
INSITU FINISHINGS
Walls
2/1/4
COLLECTION
Page 2/1/1 Tshs. 300,000
--------------
TO SUMMARY OF BILL NUMBER TWO TSHS. 4,208,100
2/1/5
d. generally 0 cm 200,000 0
Landings
REINFORCEMENT
In any location
h. 8 mm 0 kg 1,800 0
j. 10 mm 0 kg 1,800 0
k. 12 mm 0 kg 1,800 0
l. 16 mm 0 kg 1,800 0
l. 20 mm 0 kg 1,800 0
2/2/1
Formwork generally
Soffits; horizontal
Soffits; sloping
2/2/2
COLLECTION
2/2/3
EXTERNAL WALLING
BLOCKWORK
FLUSH GLAZING
Structural glass
c. generally 0 sm 320,000 0
2/3/1
INTERNAL WALLING
BLOCKWORK
Walls
a. 100 mm thick 1,000 sm 20,000 20,000,000
2/4/1
ROOF STRUCTURE
Gable-members
Z- purlins
Sagg bars
Bolts
Anchor bolts
SHEET METAL
Fascia
Barge
--------------
To Collection Tshs. 34,886,500
2/5/1
Fascia
a. 200 to 300 mm girth 55 lm 1,700 93,500
Barge
2/5/2
COLLECTION
2/5/3
ROOF COVERINGS
SARNAFIL ROOFING
2/6/1
RAINWATER INSTALLATIONS
2/7/1
GENERAL JOINERY
Mninga; selected
Skirtings
BEDS OR BACKINGS
Skirtings
-----------
TO SUMMARY OF BILL NUMBER TWO TSHS. 864,500
2/8/1
INSITU FINISHINGS
Walls
Walls
2/9/1
STRUCTURAL TIMBERS
Branderings
c. 50 x 50 mm 18 lm 5,000 90,000
Ceilings
-------------
TO SUMMARY OF BILL NUMBER TWO TSHS. 8,289,100
2/10/1
GENERAL JOINERY
Mninga; selected
Skirtings
BEDS OR BACKINGS
Skirtings
-------------
TO SUMMARY OF BILL NUMBER TWO TSHS. 35,814,000
2/11/1
INSITU FINISHINGS
200 x 300 x 6 mm; 3mm filled joints straight both ways; to cement and
sand base; generally to
b. walls 56 sm 35,000 1,960,000
BEDS OR BACKINGS
Walls
-------------
TO SUMMARY OF BILL NUMBER TWO TSHS. 9,896,000
2/12/1
2/13/1
STAIRCASE FINISHINGS
BALUSTRADES
INSITU FINISHINGS
300 x 300 x 10 mm; 3mm filled joints to diagonal pattern both ways; to
cement and sand base; generally to
GENERAL JOINERY
Mninga; selected
Skirtings
2/14/1
BEDS OR BACKINGS
Skirtings
Ceiling
Balustrades
2/14/2
COLLECTION
2/14/3
WINDOWS
PRECAST CONCRETE
Sills
SUNDRIES
Generally
-----------
TO SUMMARY OF BILL NUMBER TWO TSHS. 209,450
2/15/1
DOORS
a. 1350 x 2700 mm over all size; one top light 12 Nr 940,045 11,280,540
b. 900 x 2700 mm over all size; one top light 4 Nr 626,700 2,506,800
GENERAL JOINERY
IRONMONGERY
GLASS IN OPENINGS
-------------
TO SUMMARY OF BILL NUMBER TWO TSHS. 21,691,740
2/16/1
SANITARY INSTALLATIONS
Stainless steel sinks; B.S. 1244 part 2; satin finish; single bowl;
single drainer; 38 mm chromium plated chain waste ref 7066MO;
38 mm plastics bottle trap ref. 70238Q4; pair aluminium alloy
build - in wall brackets; pair 12 mm pillar taps ref 92514XX
-------------
To Collection Tshs. 12,590,000
2/17/1
Product No. 70150 touch less automatic soap dispensers; ABS White,
or equivalent
MIRRORS
Clear plate; SQ; silvered and primed on back with one coat
aluminium prime
-------------
To Collection T.shs 5,959,000
2/17/2
COLLECTION
2/17/3
Plinth
Reference A 142; mesh 200 x 200 mm; weight 2.22 kg per square
metre; 200 mm end laps; 200 mm side laps
Soffits; horizontal
Frames
k. 25 x 50 mm 10 lm 5,900 59,000
--------
To Collection Tshs. 355,300
2/18/1
Divisions
Shelves
Stops
f. 20 x 40 mm 13 lm 1,190 15,470
Bearers
g. 20 x 40 mm 23 lm 1,190 27,370
300 x 300 x 10 mm; butt joints; straight both ways; to cement and
sand base; generally to
--------
To Collection Tshs. 593,890
2/18/2
To concrete worktops
Three coats wash and wear vinyl paint; steel trowelled plastered
surfaces
Walls
General surfaces
2/18/3
COLLECTION
2/18/4
PIPEWORK
MANHOLES; 8 No
Excavating
Beds
Cover slabs
-----------
To collection Tshs -
2/19/1
Soffits; horizontal
b. 75 mm wide 0 lm 2,000 -
Walls
g. walls 0 sm 4,900 -
h. 610 x 457mm heavy duty single seal flat cover and frame 0 No 198,000 -
Excavating
To Collection Tshs. -
2/19/2
Disposal
Disposal of water
Sides of excavations
Beds
Suspended floors
Reinforcement;
Soffits; horizontal
2/19/3
Walls
Dip pipes
Vent pipes
j. walls 0 sm 4,900 -
2/19/4
Excavating
Disposal
Disposal of water
Sides of excavations
h. generally Item 250,000 250,000
Beds
2/19/5
Foundations
in any location
Soffits; horizontal
Walls
j. 230mm thick; curved on plan; mean radius 1865mm 0 sm 28,000 -
-----------
To Collection Tshs. -
2/19/6
Dip pipes
c. 600 x 600mm heavy duty single seal flat cover and frames 0 No 198,000 -
----------
To Collection Tshs. -
2/19/7
COLLECTION
Page 2/19/1 -
Page 2/19/2 -
Page 2/19/4 -
Page 2/19/6 -
Page 2/19/7 -
--------------
TO SUMMARY OF BILL NUMBER TWO T.SHS. 1,000,000
2/19/8
ELEMENT NUMBER
FOURTEEN - STAIRCASE FINISHINGS 2/14/3 4,743,000
ELEMENT NUMBER
FIFTEEN - WINDOWS 2/15/1 209,450
ELEMENT NUMBER
SIXTEEN - DOORS 2/16/1 21,691,740
ELEMENT NUMBER
EIGHTEEN - FIXTURES AND FITTINGS 2/18/4 1,185,740
ELEMENT NUMBER
NINETEEN - ELECTRICAL INSTALLATIONS 2/19/4 60,195,000
ELEMENT NUMBER
TWENTY - TELECOMMUNICATIONS INSTALLATIONS 2/20/1 51,150,000
ELEMENT NUMBER
TWENTY ONE - FIRE DETECTION AND ALARM SYSTEM 2/21/1 9,340,000
---------------
S/2
135.817
61.11765
9.1676475
94.02
9.402
ELEMENT NUMBER ONE
ROADS AND PARKING AREAS
EXCAVATION
Excavating
Disposal
DISPOSAL OF WATER
Generally
Generally
Sides of excavations
Sub base
Sand
Beds
4/1/1
Surfaces of sub grade
PRECAST CONCRETE
-------------
To Collection Tshs. 24,188,300
4/1/2
COLLECTION
Page 4/1/1 Tshs. 11,485,300
--------------
TO SUMMARY OF BILL NUMBER FOUR TSHS. 35,673,600
4/1/3
MANHOLES; 8 NOS
Excavating
Disposal
Disposal of water
Sides of excavations
Beds
-----------
To Collection Tshs. 1,180,250
4/2/1
Suspended floors
a. 100mm thick 6 sm 16,600 99,600
In any location
Soffits; horizontal
Walls
4/2/2
PIPEWORK
Excavating
Beds
------------
To Collection Tshs. 3,069,800
4/2/3
Suspended floors
Soffits; horizontal
Walls
------------
To Collection Tshs. 1,479,200
4/2/4
Vent pipes
------------
To Collection Tshs. 1,029,640
4/2/5
Beds
Foundations
in any location
Soffits; horizontal
-----------
To Collection Tshs. 1,563,400
4/2/6
Labours in formwork
Walls
Dip pipes
4/2/7
----------
To Collection Tshs. 195,000
4/2/8
COLLECTION
---------------
TO SUMMARY OF BILL NUMBER FOUR TSHS. 11,101,890
4/2/9
EXCAVATION
Excavating
Trenches; to receive foundations; starting from existing
ground level
Disposal
DISPOSAL OF WATER
Generally
Generally
Sides of excavations
-------------
To Collection Tshs. 1,841,000
4/3/1
Blinding
Foundation in trenches
REINFORCEMENTS
In any location
4/3/2
Formwork generally
Sides;vertical or battering
Copings
CONCRETEWORK SUNDRIES
Geneally
-------------
To Collection Tshs. 14,608,600
4/3/3
BLOCKWORK
Walls
Bolt keeps
Barrel bolts
4/3/4
Tower bolts
INSITU FINISHINGS
Walls/ columns
4/3/5
COLLECTION
4/3/6
TREES
GRASSED AREAS
-------------
To Collection Tshs. 17,015,000
4/4/1
MAINTENANCE
Generally
4/4/2
COLLECTION
4/4/3
S/4
PROVISIONAL AND PRIME COST SUMS
5/1
PROVISIONAL AND PC SUMS TSHS.
TO GENERAL SUMMARY
5/3
GENERAL SUMMARY
PAGE TSHS.
Contingencies
f. Allow for costs of insurance against injury to persons and property and insurance Sum 3,500,000
of the works against fire etc as required under clause 21,22 and 23 respectively
g. Allow cost of providing sureties for 10% of the Contract Sum Sum 2,000,000
-------------------
-------------------
TENDER SUM CARRIED TO FORM OF TENDER WITH
VAT INCLUSIVE TSHS. 759,803,856
-----------------------------------------------------------------------------
ADDRESS -----------------------------------------------------------------------------
-----------------------------------------------------------------------------
DATE -----------------------------------------------------------------------------
GS/1
544,923,470
GYPSUM BOARD CEILLING
LABOUR+nails 1,260
EMULSION PAINT
OIL PAINT
cost of material
CEMENT (per bag) 12,500
Reinforcements
HT (per tonne) 2,100,000
MS (per tonne) 1,100,000
Timber (CM)
MORTAL Cement
Sand
cost of blocks
230mm wall
150mm wall
Collection
mortar 1,913
labour 1,211
Profit 20%
To boq 3,748
REINFORCEME
NTS
1,600,000.000
55,625.680
M/WORK 1,544,374.320
PREL 55,625.680
WALL
12,500
13750
1,250
1,100
97500
30000
127500
5090.82
2409.75
15400
9900
1,820.0
1,170
plaster mix 1:4 40mm thick c&s screed 31mm thick c&s screed
5100 3952.5
1,211 1,211
20% 25%
7,573 6454.625
375
MARKUP RATE to boq
20% 285,300
25% 256,031
20% 225,480
20% 172,260
20% 163,500
22mm thick render
2805
1,211
20%
4819.44
SCHEDULE OF MATERIAL
Emulsionpaint
insert qty Cement(bgs Sand CM Aggregate CM 4L Tins
concrete grade 10 1 3.36 0.45 0.95
15 1 4.3 0.44 0.88
20 1 6.08 0.42 0.84
25 1 7.6 0.385 0.82
30
2000
2000 336
Gloss Gypsum Tiles Tiles
paint 4L board 300x300mm 150x200mm
Tins 1.2x2.4m pc (boxes) (boxes)
0.0625
0.09375
48.61111111
0.15625 48.61111111
FORMULAE SUBSTRUCTUR
Aggregate, cement, sand, mortars, bedding, reinforcements,
Ratios
1 3
1 3
Cement m3 0.048
Ratios
1 4
1 4
Cement m3 0.048
Nos bags 0.312 Trip 0.013714286
Plasters (M2)
Ratios
1 3
1 3
Cement m3 10.3576
CONCRETE M2
GRADE 10 11 3.36
(Mortar) Sand
Cement m3 0.2475 m3
CONCRETE M3
GRADE 15 10 4.3
Sand
Cement m3 4.4 m3
CONCRETE M3
GRADE 20 241 6.08
(Trenches) Sand
Cement m3 106.04 m3
GRADE 20 28 6.08
(Beds) Sand
Cement m3 1.848 m3
GRADE 20 8 6.08
(Steps or stairs) Sand
Cement m3 3.586 m3
CONCRETE M3
Cement m3 155.925 m3
Cement m3 128.205 m3
GRADE 25 39 7.6
(Ground beams) Sand
Cement m3 15.015 m3
11.7 m3 36.6
Plasters (M2)
Ratios
1 4
PAINTS M2
Gloss
3 coats U
Litres 32.625
4L Tins 8.15625
Ratios
1 5 0.2
Cement Sand
m3/bag 0.035 m3 0.27 m3
REINF - SUBSTRUCTRURE
0.001426 0.00105
x x
Nos of Blocks 1,610 no 1,035 no
Ratios
1 3 0.333333333
Cement Sand
FORMWORK
PAINTS M2
Emulsion
2 coats 3 coats
Gloss
2 coats 3 coats
GYPSUM CEILING M2
m2 140 1.2x2.4m pc
2.88
No of pcs 48.61111111
FORMULAE SUPERSTRUCTURE
Aggregate, cement, sand, mortars, bedding, reinforcements,
Ratios
1 3
1 3
Cement m3 9.08448
Ratios
1 4
1 4
Cement m3 0.048
Ratios
1 3
1 3
Cement m3 34.3882
CONCRETE M3
Cement m3 45 m3
GRADE 15 1 4.3
Sand
Cement m3 0.44 m3
GRADE 20 3 6.08
Sand
Cement m3 1.26 m3
GRADE 25 22 7.6
BED M2 Sand
Cement m3 8.47 m3
GRADE 25 24 7.6
COLUMNS Sand
Cement m3 9.24 m3
GRADE 25 19 7.6
BEAMS Sand
Cement m3 7.315 m3
GRADE 25 0 7.6
STEPS Sand
Cement m3 0 m3
Ratios
1 5 0.2
Cement Sand
FORMWORK
EXTERNAL WALLING
BLOCKS 230mm
M2 662 one block
mort factor
0.001426
x
Nos of Blocks 9,268 no
Ratios
1 5 0.2
Cement Sand
BLOCKS 150mm
M2 203 one block
mort factor
0.00105
x
Nos of Blocks 1,827 no
Cement Sand
INTERNAL WALLING
BLOCKS 230mm
M2 80 one block
mort factor
0.001426
x
Nos of Blocks 1,120 no
Ratios
1 5 0.2
Cement Sand
BLOCKS 150mm
M2 96 one block
mort factor
0.00105
x
Nos of Blocks 864 no
Ratios
1 5 0.2
Volume M3 0.91 0.18144
Cement Sand
BLOCKS 100mm
M2 1,000 one block
mort factor
0.0007
x
Nos of Blocks 9,000 no
Ratios
1 5 0.2
Cement Sand
PAINTS M2
Emulsion
2 coats 3 coats
Area M2 183.00 0.0625 Area M2 2747.00 0.09375
Gloss
2 coats 3 coats
GYPSUM CEILING M2
m2 140 1.2x2.4m pc
2.88
No of pcs 48.61111111
Rates of Price of Bms grade 30 grade 25 grade 20 grade 15
concrete
0.5225
0.149285714
Aggregates
8.8
2.514285714
Aggregates
212.08
60.59428571
Aggregates
3.696
1.056
Aggregates
7.172
2.049142857
Aggregates
332.1
94.88571429
Aggregates
273.06
78.01714286
Aggregates
31.98
9.137142857
m3
Aggregate Lime
0.54 m3 0.069
0.0007
x
1,035
0.7245
95
27.14285714
Aggregates
0.88
0.251428571
Aggregates
2.52
0.72
Aggregates
18.04
1.030857143
Aggregates
19.68
5.622857143
Aggregates
15.58
4.451428571
Aggregates
Aggregate Lime
0.54 m3 0.069
36,000 kokoto
4,500 limeston price
22,500 125,000
------------
66,150
4,500
------------
70,650
105,975
12.35
624.95
217.00
0.00140
DESCRIPTION NET ADD TOTAL UNIT
QTY WASTE QTY
1.0 SUBSTRUCTURE
. Cement 2 0 2 bag
. Sand 1 0 1 m3
. Aggregate 1 0 1 m3
1.2 REINFORCEMENTS
-1-
DESCRIPTION NET ADD TOTAL UNIT
QTY WASTE QTY
1.3 FORMWORK
. Stones (Boulders) 60 3 63 m3
to Backfilling
-2-
DESCRIPTION NET ADD TOTAL UNIT
QTY WASTE QTY
1.7 DAMP PROOF COURSES
. Cement 61 3 64 bag
. Sand 4.00 0.20 4.20 m3
. Aggregate 7 0 7 m3
-3-
DESCRIPTION NET ADD TOTAL UNIT
QTY WASTE QTY
2.2 REINFORCEMENTS
2.3 FORMWORK
3.0 WALLING
-4-
DESCRIPTION NET ADD TOTAL UNIT
QTY WASTE QTY
. 75 x 50 946 24 970 m
Hardwood
fascia boards
-5-
DESCRIPTION NET ADD TOTAL UNIT
QTY WASTE QTY
Accessories
-8-
DESCRIPTION NET ADD TOTAL UNIT
QTY WASTE QTY
Branderings
-9-
DESCRIPTION NET ADD TOTAL UNIT
QTY WASTE QTY
. Paint 70 4 74 ltr
13.0 WINDOWS
Sills
. Paint 24 1 25 ltr
14.0 DOORS
Mkongo
-10-
DESCRIPTION NET ADD TOTAL UNIT
QTY WASTE QTY
Frames
.50 x 150mm 59 1 60 m
Transomes
.50 x 150mm 3 0 3 m
Architraves/ quadrants
.Fixing beads
.15 x 38mm 7 0 7 m
14.2 IRONMONGERY
.6mm thick 3 0 3 m2
. Paint 1 0 1 ltr
14.6 POLYURETHANE
. Varnish 5 0 5 ltr
-11-
DESCRIPTION NET ADD TOTAL UNIT
QTY WASTE QTY
. Soap dish 3 0 3 Nr
. Floor drains 3 0 3 Nr
129
strip ftn
70.83
0.25
column bases 0.7
50 12.39525 (19.95) 42.61
1,596.00
233.28
89.79 59.20
2175.6
319368
321543.6
16077.18
253.92
601.00
94 0.45 42.30
411.13 1.00 411.13
3.23 15.87 102.52
4.27 15.37 65.63
(3.91) 2.60 (20.33) 558.95
24.37
569.00 50.00
6,100.00 #REF!
#REF! 1.10 3,700.00
4,082.50
6,418.00 4,611.00 4,414.00 18,396.00
448.00 3,530.00 4,414.00 18,396.00 335.00
4.05
10.80
316.54321 (8.40)
21,150.00
9,104.00
30,254.00
#REF!
69.75
S/n Materials Description Unit Qtty Price Total
1.0 Substructure
2.1 Sand ( 7tonne lorry; approximate 4.0m3 ) trip 129 120,000 15,480,000
9.1 concrete blocks (450 x 230 x 150mm) pcs 9,268 1,500 13,902,000
2.11 2400 x 1200mm formwork @ marine board pcs 220 80,000 17,600,000
--------------
-1-
3.0 Walling
4.2 50 x 150 x 3000mm timber for structure nos 835 17,000 14,195,000
Accessories
-2-
7.5 Wash ''n'' wear paint; 20litre bucket bucket 8 140,000 1,120,000
-3-
9.0 Windows
Aluminium
Grilles
-4-
10.0 Doors
-5-
S/n Materials Description Unit Qtty Price Total
-6-
128.5
67
200,000.00
80.00 5500
20 1,375.00
1,203,125.00
10000
7475 6.02
102,339,000
==========
0.9
600
33
65
16.25
40,725,000
==========
62,796,500
==========
26,982,000
==========
0.5148
1.94250194250194
13000
25252.5252525252
25252.5252525252
34,090.91
45000
15750
29250
4,716,000
==========
28000
9800
18200
3,743,600
==========
47.9166666666667
579.6
193.2
2,943,000
==========
4.69
1.17
3.52
2.50
8.80
72,900.00 414,569
0.83 4.69
2.057
1
10,237,000
==========
188,030.30
47,007.58
141,022.73
2.50
352,556.82
3,690,344
==========
4.46 365,000
609,000 2.30 188,030.30
==========
100000
100000
25000
75,000.00
3,215,000
==========
4 MATERIALS SUMMARY
CONSTRUCTION MATERIALS
-1-
Materials Description Units Total
DOORS
GLASS IN OPENINGS
GRILLE WORKS
IRONMONGERY
WINDOWS
ALUMINIUM WINDOWS
PAINTING
-2-
Materials Description Units Total
SANITARY APPLIANCES
Kitchen sink no 1
Bath Tab no 1
Handwash basin nos 3
WC complete European nos 3
Shower trays nos 3
Mirrors nos 3
Soap dish nos 3
Towel rail - chromium nos 3
Toilet roll holder nos 3
Floor drains nos 3
NB:
-3-
-3-
SUMMARY
NB:
. Electrical installation
S/1