Problem Prioritization
Problem Prioritization
Impaired Walking related to limited This has been the last priority because
endurance the previous problems must be solving
first before continuing to this problem.
Subjective : The solution of the previous problems
• The client mentioned that she cannot can lead to the solution of this problem.
walk around the room without
assistance; she said that her legs
cannot endure her anymore.
Objective:
• The client was sitting all the time and
it was observed that she cannot walk
around the area without the
assistance of her daughter.