100% found this document useful (1 vote)
6K views

Requirements For CNC Applications

The document lists the requirements for applying for a CNC permit, which include submitting a transmittal letter, application form, zoning certification, proof of ownership documents, site development plan, photos of the site, payment of P100, and geographical coordinates. Additional requirements for poultry farms with less than 10,000 heads include a barangay resolution and supplier certification of bird numbers. Additional requirements for gasoline stations with less than 20,000 liters include a barangay resolution and supplier certification of tank capacity and gasoline amounts. All documents must be submitted in duplicate folders.

Uploaded by

Nina Arra Rivera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
6K views

Requirements For CNC Applications

The document lists the requirements for applying for a CNC permit, which include submitting a transmittal letter, application form, zoning certification, proof of ownership documents, site development plan, photos of the site, payment of P100, and geographical coordinates. Additional requirements for poultry farms with less than 10,000 heads include a barangay resolution and supplier certification of bird numbers. Additional requirements for gasoline stations with less than 20,000 liters include a barangay resolution and supplier certification of tank capacity and gasoline amounts. All documents must be submitted in duplicate folders.

Uploaded by

Nina Arra Rivera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

REQUIREMENTS FOR CNC APPLICATIONS

1. Transmittal letter addressed to the Regional Director


2. CNC Application Form (EMB)
3. Zoning Certification (Certified True Copy)
4. Proof of Ownership TCT or OCT (attached lease contract, Deed of Sale,
SPA, Consent, Memorandum of Agreement, etc.)
5. Site Development Plan/Vicinity Map
6. Pictures of the site
7. CNC Payment P100.00 In cash or in Manager’s check/cashier’s check
8. Geographical Coordinates (latitude, longitude)
(sample: 7o 35’ 24.5” latitude; 125 o 33’ 31.41” longitude)

For POULTRY (less than 10,000 heads)

Additional Requirements

1. Barangay Resolution
2. Certification from the Supplier stating the exact number of birds to be
supplied.

For GASOLINE STATION: (less than 20,000 liters)

Additional Requirements

1. Barangay Resolution
2. Certification from the supplier the exact capacity of the tanks and
gasoline to be supplied.

Note: ALL DOCUMENTS SHALL BE SUBMITTED IN 2 COPIES TO


BE PLACE IN 2 FOLDERS

You might also like