0% found this document useful (0 votes)
35 views

Needle Gate (MS01-NG02) : Key Date Description Workcenter Usage Planner Group 01.01.2020 Task List For Hopper 11MECH 2 010

The document provides a task list for January 1st, 2020 for the Hopper workcenter 11MECH with planner group 010. It includes a maintenance task for the Needle Gate MS01-NG02 with an overall status of 2 and maintenance strategy of CEMZA along with description of tasks including oiling, greasing, belt change and pulley check to be performed on that date.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views

Needle Gate (MS01-NG02) : Key Date Description Workcenter Usage Planner Group 01.01.2020 Task List For Hopper 11MECH 2 010

The document provides a task list for January 1st, 2020 for the Hopper workcenter 11MECH with planner group 010. It includes a maintenance task for the Needle Gate MS01-NG02 with an overall status of 2 and maintenance strategy of CEMZA along with description of tasks including oiling, greasing, belt change and pulley check to be performed on that date.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

KEY DATE DESCRIPTION WORKCENTER USAGE PLANNER GROUP

01.01.2020 TASK LIST FOR HOPPER 11MECH 2 010

Needle Gate (MS01-NG02)


OVERALL STATUS MAINTENANCE STRATEGY OPERATION
2 CEMZA
10
20
30
40
10
20
30
DESCRIPTION

OILING
GREASING
BELT CHANGE
PULLY CHECK