0% found this document useful (0 votes)
223 views

Subcontractor Production Report: Job Safety

This document is a subcontractor production report template used to track daily work hours, safety inspections, materials used, and equipment on a construction site. It requires listing the project details, subcontractor information, employee work hours and tasks, safety meetings and inspections, equipment and materials, and remarks. The subcontractor foreman must sign off on the report before submitting it to the general contractor's site superintendent each day.

Uploaded by

zubair nawaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
223 views

Subcontractor Production Report: Job Safety

This document is a subcontractor production report template used to track daily work hours, safety inspections, materials used, and equipment on a construction site. It requires listing the project details, subcontractor information, employee work hours and tasks, safety meetings and inspections, equipment and materials, and remarks. The subcontractor foreman must sign off on the report before submitting it to the general contractor's site superintendent each day.

Uploaded by

zubair nawaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

SUBCONTRACTOR PRODUCTION REPORT Date:

(ATTACH ADDITIONAL SHEETS IF NECESSARY)


STRONGHOLD PROJECT # PROJECT TITLE AND LOCATION REPORT NO.

SUBCONTRACTOR SUBCONTRACTOR - FOREMAN

WORK PERFORMED TODAY WORK


WORK LOCATION AND DESCRIPTION EMPLOYEE CLASSIFICATION HOURS

WAS A JOB SAFETY MEETING HELD THIS DATE? YES NO TOTAL WORK HOURS ON
JOB SAFETY
JOB SAFETY (IF YES, ATTACH COPY OF THE MEETING MINUTES) JOB SITE THIS DATE:
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE? YES NO CUMULATIVE TOTAL OF
(IF YES, ATTACH A COPY OF COMPLETED OSHA REPORTS) WORK HOURS FROM
WAS TRENCHING/SCAFFOLD/HV ELECTRICAL/HIGH WORK DONE? YES NO PREVIOUS REPORT:
(IF YES, ATTACH STATEMENT OR CHECKLIST SHOWING INSPECTION PERFORMED) TOTAL WORK HOURS
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT? YES NO FROM START OF CONST.
(IF YES, ATTACH DESCRIPTION OF INCIDENT AND PROPOSED ACTION)

LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTION CONDUCTED SAFETY REQUIREMENTS


HAVE BEEN MET
(YES OR NO)

EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INCLUDE NUMBER OF HOURS USED TODAY

REMARKS

SUBCONTRACTOR/FOREMAN DATE
FORM 1400-1 9/96

* Please complete daily before leaving the job site. Submit paperwork to your Stronghold Site Superintendent.
Hours reported on your Daily Production Report must match certified payrolls. It is recommended that a copy of
this report be submitted to your company payroll department. ONLY REPORT HOURS WORKED ON SITE.