0% found this document useful (0 votes)
37 views

LG&CD Department

The document provides information for enlisting a construction firm in the LG&CD department, including technical staff requirements, machinery requirements, financial capacity, and general requirements. The firm is applying for category C-4 up to 100 million. Details on minimum required and available project managers, engineers, technicians, machinery, financial assets, and completed projects are given.

Uploaded by

faisal malook
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views

LG&CD Department

The document provides information for enlisting a construction firm in the LG&CD department, including technical staff requirements, machinery requirements, financial capacity, and general requirements. The firm is applying for category C-4 up to 100 million. Details on minimum required and available project managers, engineers, technicians, machinery, financial assets, and completed projects are given.

Uploaded by

faisal malook
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

LG&CD DEPARTMENT

Name of Firm:

Existing Enlistment in LG&CD: C-4 PEC Category C-4 (Valid Till____________

Category Applied: C-4 upto 100.000 Million

TECHNICAL STAFF

REQUIRE AVAILABLE WITH


Sr. No STAFF REMARKS / RECOMMENDATION
D THE FIRM
HEAD OFFICE STAFF
1 Project Manager 1
2 Quantity Surveyors 1
3 Accountant 1
4 Draftsman 1
FIELD STAFF
For Each Project Minim.
REQUIRE AVAILABLE WITH
STAFF List of staff is attached
D FIRM
5 Project Engineer (Bsc Civil) 1
Surveyors (Diploma 1
6
Holders)
Material Inspectors (Bsc 1
7
Engineer / Msc Geology)
Site Inspector (Bsc 1
8
Engineer / Diploma Holder)
9 Technician 3
Operators (Matching to the 3
10
no of equipments)

Assistant Engineer, Executive Engineer


LG&CD, District LG&CD, Circle
2

LG&CD DEPARTMENT
Name of Firm:

Existing Enlistment in LG&CD: C-4 PEC Category C-4 (Valid Till_____________)

Category Applied: C-4 upto 100.000 Million

MACHINERY

AVAILABLE WITH
Sr. No Name of Machinery REQUIRED REMARKS / RECOMMENDATION
THE FIRM
1 Static Road Rollers 4 List of Machinery / Documents is attached
2 Sheep Foot Rollers 4
3 Vibratory Rollers 2
4 Water Pumps 3
5 Tractor With Trollies 5
6 Tar Boilers 3
Tractor with front end
7 2
blade
8 Water Tanker 2
Concrete Mixer (one bag
9 2
minimum)

Assistant Engineer, Executive Engineer


LG&CD, District LG&CD, Circle
3

LG&CD DEPARTMENT
Name of Firm :
Existing Enlistment in LG&CD: C-4 PEC Category C-4 (Valid Till_________)
Category Applied: C-4 upto 100.000 Million
FINANCIAL CAPACITY
Sr.
Criteria REQUIRED AVAILABLE WITH THE FIRM REMARKS
No
Balance sheet must indicate a circulation money of minimum
Rs. 2.50 M (minimum 50% of circulation money always Name of Bank / upto
1 2.500 (M)
remain in reserve of total works allotted to a particular ______
contractor)
EXPENSES

Works executed Tender participated


REMARKS
Sr. (9.0 Million or above) (9 Million or above)
Criteria
No
Accomplished Accomplished
Required Required
by the Firm by the Firm
Executed one work amounting to Rs. 5.0 – 9.0 M
approximately and participated in tendering for two such
works. No contractor should be allotted works 2 times its
1 approved limit. In case where works are allotted more than
the limit then proportional increase in above stated sub
heads will be an essential condition.

General Requirement Attached Yes No


Attested Photocopy of CNIC
Affidavit
Partnership Deed in case of Firm
Income Tax return for last year
Contact Nos. of Firm / Contractor’s Staff
Performance Certificate Report from concerned Assistant
Engineer
Fee Receipt (Enlistment / Renewal)

Assistant Engineer, Executive Engineer


LG&CD, District LG&CD, Circle