0% found this document useful (0 votes)
78 views1 page

092-26-0002-3-08 - Utilities Pipe Bridge Plan & Elevation

The document appears to be an engineering plan for a proposed material recovery facility. It includes a key plan and elevations at scales of 1:350 meters and 1:30 meters. The facility will have a building footprint of 108 square meters and include a waste water treatment area, biomass fuel receiving area, and mezzanine and ground floor levels connected by a pipe bridge to transfer utilities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views1 page

092-26-0002-3-08 - Utilities Pipe Bridge Plan & Elevation

The document appears to be an engineering plan for a proposed material recovery facility. It includes a key plan and elevations at scales of 1:350 meters and 1:30 meters. The facility will have a building footprint of 108 square meters and include a waste water treatment area, biomass fuel receiving area, and mezzanine and ground floor levels connected by a pipe bridge to transfer utilities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A B C D E F G

7 1

PROPOSED
MATERIAL RECOVERY
FACILITY TOP OF
6 BLDG. FOOT PRINT ROOF BEAM

= 108.00 SQM.
5 TOP OF
ROOF BEAM
C'

3
WASTE WATER TREATMENT
2 BIOMASS FUEL
RECEIVING AREA
SECOND FLR.
1 LEVEL.

2
PIPE BRIDGE -
1 K E Y P L A N
- SCALE: 1:350 MTS

D E F G MEZZANINE
FLOOR LVL.

GROUND FLR.
LEVEL.

GROUND FLR.
LEVEL.

SIDEWALK SIDEWALK
LEVEL. LEVEL.

ACCESS ROAD
LEVEL.

PIPE BRIDGE (UTILITIES TO PROCESSING)


3 E L E V A T I O N
- SCALE: 1:30 MTS

3
-

Q R S T
PIPE BRIDGE (UTILITIES TO PROCESSING) BERMA PROCESYS CORP.
2 B L O W - U P P L A N ISSUED FOR CONSTRUCTION
- SCALE: 1:60 MTS APPROVED BY: DATE:

REF: -

DESIGNER: PRC No.: REVIEWED BY: PRC No.: 0029278 PROJECT: OWNER: COMMENTS DRAWING CODE: DWG3 SHEET CONTENT SHEET NO.

VALIDITY: VALIDITY: 09-05-21 PROP/ PROJ NO.: 092


TIN: TIN: 231-629-577 REF NO.: 26 DWG NO.: 0002

PTR No.: ARCHITECT PTR No.: 9264908 REVISION NUMBER: 08


PROJECT LEAD
DATE: PLACE: -IAPOA No.:25092-0 OR No.:149782 DATE:09-29-15 DATE:01-08-20 PLACE: QC REV. NO.: 07 DRAWN BY: JML2 DATE: 08-21-20 DRAWN BY:JML2 DATE: 08-25-20
T HIS DOCUME NT I S S TRICT LY CONFI DENTI AL, A ND IT S CONT ENTS ARE THE EXCL USIVE PROPE RTY OF BE RMA PROCESY S CORP. AND MUS T NOT BE REPRODUCED, T RANSM IT TED, OR COM MUNI CATE D WI THOUT PRIOR WRIT TEN APPROV AL OF B ERMA PROCES YS CORP.

You might also like