Jsa Insulation Work

1) The document provides a job safety analysis for insulation work. It identifies potential hazards such as dust, heat stress, flooding, and scaffolding collapse. 2) Control measures are outlined to manage the hazards, including installing dust suppression, prohibiting work during heavy rain or flood, and stopping high-altitude work during storms. 3) Required personal protective equipment is specified for each task, including gloves, safety shoes, helmet, and nose mask. Supervisors are responsible for ensuring the control measures and PPE use.

Uploaded by

M M PRADHAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (4 votes)
7K views

Jsa Insulation Work

1) The document provides a job safety analysis for insulation work. It identifies potential hazards such as dust, heat stress, flooding, and scaffolding collapse. 2) Control measures are outlined to manage the hazards, including installing dust suppression, prohibiting work during heavy rain or flood, and stopping high-altitude work during storms. 3) Required personal protective equipment is specified for each task, including gloves, safety shoes, helmet, and nose mask. Supervisors are responsible for ensuring the control measures and PPE use.

Uploaded by

M M PRADHAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 19

JOB SAFETY ANALYSIS

INSULATION WORK DEPT.: MECHANICAL EFFECTIVE DATE: 27.09.2019 RRC/HSE/JSA/19-20/REV-00

Sl No. Activities Hazard Criteria Associated Hazards Control Measures Required PPEs Responsibility

Safety N/A N/A

Ergonomics N/A N/A

Environment 1. Dust prone zone. 1. Dust suppression system must be installed.


2. Nose musk and safety goggles must be used. 1. Hand gloves.
2. Safety Shoe. Supervisor, Jr.
Positive Isolation & 1. During rainy season and flood condition avoid electrical works and 3. Safety Helmet. Engineer (Production,
1 the use of power tool in waterlogged areas. 4. Nose Musk. Mechanical &
Work Permit 5. HV Jacket. Electrical) and job
2. During summer season ORS drinks must be provided .
1. Water logging due to rain. 6. FR Jacket (If Supervisors
Special Climatic 2.Heat Stress during summer. 3. All height works and scafolding jobs must be stopped required)
Conditions 3. Cyclone and stormy weather
4. Structure Collapse due to earthquake 4. No Lifting of materials at height should be performed.
5. Evacuation of all workers and employees to the emergency
assembly point.
6. Follow Diaster Management Plan.
1. The glass wool must be contained in enclosed containers to
prevent the dust formation.
2. All personnels handling glass wool must wear full sleeve clothing
and hand gloves to prevent a direct contact of the glass wool with the
skin to prevent skin irritation.
3. Personnel must use safety goggles to prevent the glass wool dust
from entering the eye and causing eye irritation.
1. The glass wool dust may cause 4. The glass wool must be stored away from any source of fire to
suffocation. prevent fire hazard.
2. The glass wool may lead to skin 5. The scaffolding pipes must be stacked properly with stopper to
irritation. prevent rolling over and any injury by it.
3. Eye Irritation by the glass wool dust.
Safety 4. Glass Wool is a flamable substance
6. The aluminium paint must be stored separetely away from any
source of fire.
5. Injury by scaffolding pipes. 7. Aluminium paint must not be left open in a confined room.
6. Aluminium paint is highly flamable 8. The MSDS of the aluminium paint must be available and displayed
liquid. at site.
7. Aluminum paint is acute toxic. 9. Training on MSDS must be imparted to all the personnel.

1. Safety helmet
Storage, Handling and 2. Safety Goggles Supervisor, Jr.
3. nose musk Engineer
2 transportation of 4. Hand Gloves ( Mechanical ) and job
materials Ergonomics N/A N/A
5. HV Jacket Supervisors,
1. The glass wool must be contained in enclosed containers to 6. Safety Shoe
prevent the dust formation.
1. Glass wool dust may lead to air 2. Drink sufficient water to prevent dehydration.
contamination.
2. Coke dust prone zone 3. Aluminium paint sepage must be restricted from flowing to water
Environment 3. Aluminium paint may lead to water bodies.
contamination. 4. Area must be wetted by water to supress coke dust
4. Heat Stress.
5. Nose musk and safety goggles must be used.
Sl No. Activities Hazard Criteria Associated Hazards Control Measures Required PPEs Responsibility
1. During rainy season and flood condition avoid electrical works and
the use of power tool in waterlogged areas.
2. During summer season ORS drinks must be provided .

1. Water logging due to rain. 3. All height works and scafolding jobs must be stopped
Special Climatic 2. Heat Stress during summer. 4. Crane operation must be stopped if wind velocity is =< 48 m/sec
conditions 3. Cyclone and stormy weather square.
4. Structure Collapse during earthquake. 5. No Lifting of materials at height should be performed.
6. Evacuation of all workers and employees to the emergency
assembly point.

1. The scaffolding must be thoroughly inspected and certified by a


competent person before its use.
2. All the protruding scaffolding rods must be capped with a rubber
cap till man height or 7 Ft to prevent injury.
3. The scaffolding area must be barricaded with barrication net or
hard barrication (if scaffolding is beside a road) at a distance of 3mtrs
from the scaffolding radially.
4. Proper material lifting technique must be used for material lifting.
1. Failure of scaffolding structure due to 5. Full body Safety harness must be used by all personnels working at
poor material quality. a height of 2mtrs.
2. Injury by the protruding scaffolding rod. 6. Appropriate ladders must be installed for a safe access with the
3. Material falling from height while ladder extending at a height of atleast 1mtrs from the working
Safety scafolding installation. platform.
4. Person falling from height. 7. The working platform must be well guarded by a hand rail, mid rail
5. Vehicle coliding with scaffolding & toe guard.
structure. 8. All the materials must be properly stacked and the access area
6. Slip, Trip & Fall. must be free from any obstacles to prevent slip, trip & Fall.

1. Safety helmet
2. Safety Goggles
1. Proper posture required for the work 3. nose musk
2. Job specific tools must be used to avoid sprain and muscle fatigue. 4. Hand Gloves
1. Improper posture of work may lead to 3. Proper material lifting techniques must be used for manual lifting. 5. HV Jacket. Supervisor, Jr.
muscle sprain. 6. FR Jacket (If working
Engineer
3 Scaffolding installation Ergonomics 2. Wrong tool selection may lead to sprain 4. The maximum manual load lifting capacity for individual must not in hot zone) ( Mechanical ) and job
and muscle fatigue. be exceeded. 7. Safety Shoe
8. Welders Face Shield. Supervisors,
3. Improper technique for manual material
handling may lead to lower lumbar sprain. 9. Leg Guard.
10. Hand Sleeve.
11. Gas Cutters Face
1. FR jackets must be used. Shield.
2. Drink sufficient water to prevent dehydration.

1. Heat stress 3. Continuous working by individual worker must not be allowed.


Environment 2. Coke dust prone zone
4. Area must be wetted by water to supress coke dust
5. Nose musk and safety goggles must be used.
Sl No. Activities Hazard Criteria Associated Hazards Control Measures Required PPEs Responsibility

1. During rainy season and flood condition avoid electrical works and
the use of power tool in waterlogged areas.
2. During summer season ORS drinks must be provided .
1. Water logging due to rain.
Special Climatic 2. Heat Stress during summer. 3. All height works and scafolding jobs must be stopped
Conditions 3. Cyclone and stormy weather 4. Crane operation must be stopped if wind velocity is =< 48 m/sec
4. Structure Collapse during earthquake. square.
5. No Lifting of materials at height should be performed.
6. Evacuation of all workers and employees to the emergency
assembly point.

1. All the personnels must wear full sleeve clothing and hand gloves
to prevent any injury by the sharp edge of the aluminium sheets.
2. Personnels must use nose musk to prevent the inhalation of glass
wool dust.
3. Personels must use safety goggles to prevent eye irritation by the
glass wool dust.
4. Full sleeve clothing is a must to prevent direct skin contact of glass
wool.
5. The GI wire must be removed cautiously and not with bare hands.
6. All the tools and materials must be stacked properly on the working
platform to prevent it from falling.
1. Injury by the sharp edge of the 7. Persons working at height must use full body harness and the
dismantled aluminium sheet. anchoring must be done above the shoulder level and at two different
2. Skin Irritation by the glass wool. anchoring points.
3. Eye Irritation by the glass wool dust. 8. life line must be used where ever neccessary.
4. Saffocation caused due to the glass wool 9. Safety net must be used to arrest the falling materials and person
dust. and must be installed at a height of 4mtrs below the working
5. Injury by the GI wire. platform.
Safety 6. Tools amd materials falling from height. 10. The scaffolding must be thoroughly inspected and certified by a
7. Person falling from height. competent person and tagging must be done.
9. Scaffolding structure failure. 11. The protruding rods of scaffolding must be capped with rubber
10. Injury by the sharp protruding cap upto man height or 7ft.
scaffolding rod. 12. Hand gloves must be used while scrubbing with wire brush.
11. Injury while scrubbing with wire brush 13. All the materials must be properly stacked and the access area
for cleaning. must be free from any obstacles to prevent slip, trip & Fall.
12. Slip, Trip & Fall.

1. Safety helmet
2. Safety Goggles
3. nose musk
4. Hand Gloves
5. HV Jacket.
6. FR Jacket (If Supervisor, Jr.
Removal of old working in hot zone) Engineer
4
insulation & Cleaning 7. Safety Shoe ( Mechanical ) and
8. Welders Face job Supervisors,
1. Proper posture required for the work Shield.
2. Job specific tools must be used to avoid sprain and muscle fatigue. 9. Leg Guard.
1. Improper posture of work may lead to 3. Proper material lifting techniques must be used for manual lifting.
muscle sprain. 10. Hand Sleeve.
2. Wrong tool selection may lead to sprain 4. The maximum manual load lifting capacity for individual must not 11. Gas Cutters Face
Ergonomics and muscle fatigue. Shield.
be exceeded.
3. Improper technique for manual material
handling may lead to lower lumbar sprain.
Shield.

Sl No. Activities Hazard Criteria Associated Hazards Control Measures Required PPEs Responsibility
1. FR jackets must be used.
2. Drink sufficient water to prevent dehydration.
1. Heat stress 3. Continuous working by individual worker must not be allowed.
Environment 2. Coke dust prone zone
4. Area must be wetted by water to supress coke dust
5. Nose musk and safety goggles must be used.

1. During rainy season and flood condition avoid electrical works and
the use of power tool in waterlogged areas.
2. During summer season ORS drinks must be provided .
1. Water logging due to rain.
Special Climatic 2. Heat Stress during summer. 3. All height works and scafolding jobs must be stopped
Conditions 3. Cyclone and stormy weather 4. Crane operation must be stopped if wind velocity is =< 48 m/sec
4. Structure Collapse during earthquake. square.
5. No Lifting of materials at height should be performed.
6. Evacuation of all workers and employees to the emergency
assembly point.

1. Fire Hazard. 1. The containers of the aluminium paint must be stacked away fro
2.Toxic Fumes of Aluminium Paints. any source of flame.
3. Eye Irritation 2. All the personnels working in the vicinity of the painting area must
4. Suffocation. wear nose musk to prevent the inhalation of the paint fumes.
5. Skin Irritation. 3. All personnel must use safety goggles to prevent eye irritation.
6. Injury by the sharp edge of the 4. Use of Nose musk is neccessary to prevent saffocation by the glass
dismantled aluminium sheet. wool dust.
7. Tools amd materials falling from height. 5. All personnel must wear full sleeve clothing to restrict the
8. Person falling from height. aluminium paint and glass wool dust direct skin contact.
9. Scaffolding structure failure. 6. All the personnels must wear full sleeve clothing and hand gloves
10. Injury by the sharp protruding to prevent any injury by the sharp edge of the aluminium sheets.
scaffolding rod. 7. All the tools and materials must be stacked properly on the working
11. Slip, Trip & Fall. platform to prevent it from falling.
8. Safety net must be used to arrest the falling materials and person
and must be installed at a height of 4mtrs below the working
platform.
9. Persons working at height must use full body harness and the
anchoring must be done above the shoulder level and at two different
anchoring points.
Safety 10. life line must be used where ever neccessary.
11. The scaffolding must be thoroughly inspected and certified by a
competent person and tagging must be done.
12. The protruding rods of scaffolding must be capped with rubber
cap upto man height or 7ft.
13. All the materials must be properly stacked and the access area
must be free from any obstacles to prevent slip, trip & Fall.

1. Safety helmet
2. Safety Goggles
3. nose musk
4. Hand Gloves
5. HV Jacket.
6. FR Jacket (If working Supervisor, Jr.
5 Painting & Installation in hot zone)
Engineer
of Insulation ( Mechanical ) and job
7. Safety Shoe Supervisors,
8. Welders Face Shield.
9. Leg Guard.
10. Hand Sleeve.
11. Gas Cutters Face
Shield.
5. HV Jacket. Supervisor, Jr.
Painting & Installation 6. FR Jacket (If working Engineer
5 in hot zone) ( Mechanical ) and job
of Insulation 7. Safety Shoe
Sl No. Activities Hazard Criteria Associated Hazards Control Measures Required
8. Welders FacePPEs
Shield. Supervisors,
Responsibility
1. Proper posture required for the work 9. Leg Guard.
2. Job specific tools must be used to avoid sprain and muscle fatigue. 10. Hand Sleeve.
1. Improper posture of work may lead to 3. Proper material lifting techniques must be used for manual lifting. 11. Gas Cutters Face
muscle sprain. Shield.
2. Wrong tool selection may lead to sprain 4. The maximum manual load lifting capacity for individual must not
Ergonomics and muscle fatigue. be exceeded.
3. Improper technique for manual material
handling may lead to lower lumbar sprain.

1. FR jackets must be used.


2. Drink sufficient water to prevent dehydration.
1. Heat stress 3. Continuous working by individual worker must not be allowed.
2. Coke dust prone zone
3. Air Contamination by Aluminium paints. 4. Area must be wetted by water to supress coke dust
Environment 4. Water body contamination by
Aluminium paints leading to a long time 5. Nose musk and safety goggles must be used.
adverse effect to aquatic environment. 6. A collecting tray must be placed below the area to be painted to
prevent water body contamination.

1. During rainy season and flood condition avoid electrical works and
the use of power tool in waterlogged areas.
2. During summer season ORS drinks must be provided .
1. Water logging due to rain.
Special Climatic 2. Heat Stress during summer. 3. All height works and scafolding jobs must be stopped
Conditions 3. Cyclone and stormy weather 4. Crane operation must be stopped if wind velocity is =< 48 m/sec
4. Structure Collapse during earthquake. square.
5. No Lifting of materials at height should be performed.
6. Evacuation of all workers and employees to the emergency
assembly point.

PREPARED BY: ANJANAV ROY APPROVED BY: RAJSEKHAR PRADHAN


DESIGNATION: SAFETY OFFICER DESIGNATION: CEO

SIGNATURE: SIGNATURE:
STRUCTURAL FABRICATION, ERECTION &
JOB HAZARD ANALYSIS
DISMANTLING DEPT.: MECHANICAL SOP No.: HMC-IEM/OPC/3758/REV-01

Sl No. Activities Hazard Criteria Associated Hazards Control Measures


Safety N/A
Ergonomics N/A N/A
1. Dust suppression system must
be installed.
Environment 1. Dust prone zone.
2. Nose musk and safety goggles
must be used.
1. During rainy season and flood
condition avoid electrical works and
the use of power tool in waterlogged
areas.
Positive Isolation & 2. During summer season ORS drinks
1 Work Permit must be provided .
1. Water logging due to
rain. 3. All height works and scafolding jobs
2.Heat Stress during must be stopped
Special Climatic summer. 4. No Lifting of materials at height
3. Cyclone and stormy should be performed.
Conditions 5. Evacuation of all workers and
weather
4. Structure Collapse due employees to the emergency
to earthquake assembly point.
6. Follow Diaster Management Plan.

1. Only trained Rigger should be


involved in the rigging job.
2. All lifting tools & tackles must be
thoroughly tested and certified by a
competent person and must also be
inspected periodically internally.
3. F-15 crane must be tested and
certified and periodic fitness check
must be conducted.
4. The lifting operation area must be
1. Personal injury by sharp barricated.
edge of lifted material. 5. Materials must not projected more
2. Impact injury by the than 1 mtr and incase of projected
lifted material. materials red flag must be fixed at the
3. Falling of lifted material. end.
4. Overturning of F-15 6. Signal man must be available with
Safety crane. red & green flags.
5. Person may get hit by 7. The signal man shall maintain a
moving F-15. distance of 5 mtrs from the F-15.
6. Person hit by swinging of 8. The lifted materials must be
lifted material. supported with a guide rope while
7. Failure of F-15 crane. lifting and shifting.
9. Follow Road Safety rules.
1. Improper posture of 1. Proper posture required for the
work may lead to muscle work
sprain. 2. Job specific tools must be used to
2. Wrong tool selection avoid sprain and muscle fatigue.
may lead to sprain and 3. Proper material lifting techniques
Transportation of muscle fatigue. must be used for manual lifting.
structural (angles, Ergonomics 3. Improper technique for 4. The maximum manual load lifting
2 channels, MS & SS manual material handling capacity for individual must not be
plates, MS chequered may lead to lower lumbar exceeded.
plates, pipe, etc.) sprain.

1. FR jackets must be used.


2. Drink sufficient water to prevent
dehydration.
3. Continuous working by individual
1. Heat stress worker must not be allowed.
4. Area must be wetted by water to
Environment 2. Coke dust prone zone supress coke dust
5. Nose musk and safety goggles must
be used.

1. Water logging due to 1. During rainy season and flood


rain. condition avoid electrical works and
2. Heat Stress during the use of power tool in waterlogged
summer. areas.
3. Cyclone and stormy 2. During summer season ORS drinks
weather must be provided .
4. Structure Collapse during 3. All height works and scafolding jobs
earthquake. must be stopped
4. Crane operation must be stopped if
Special Climatic wind velocity is =< 48 m/sec square.
conditions 5. No Lifting of materials at height
should be performed.
6. Evacuation of all workers and
employees to the emergency
assembly point.
1. The working area must be
adequately barricaded.
2. Hot Work permit must be taken.
3. The Ground area above which the
gas Cutting job is being performed
must be wetted by water.
4. Any electrical lines must be covered
with fire blanket.
1. Personal injury by sharp 5. Fire Extinguisher must be installed.
edge of the dismantling 6. Sand Bucket and water bucket must
material. be used.
2. Fire hazard due to gas 7. Flash back arrestor must be
cutting. installed in both LPG & Oxygen
3. Impact injury while cylinders.
removing the old 8. The Gas Cutting hose must be
dismantled structural thoroughly checked with soap water
plate/ member. for any leakage.
4. Falling of Dismantled 9. Fire blanket must be used to source
materials from height. arrest the spatters of gas cutting.
5. Falling of tools and 10. The Lifted material must be
Safety tackles from height. supported by guide rope.
6. Person falling from 11. Safety belt must be used by all
height. persons working at height and
7. Failure of Lifting tools & anchoring of safety belt must be done
tackles. above shoulder level and the two
8. Overturning of F-15 lanyard must be anchored at two
crane. different supporting structure.
9. Person may get hit by 12. All lifting tools and tackles must be
moving F-15. thoroughly tested and certified by
10. Person hit by swinging competent person and it must be
of lifted material. inspected regularly.
11. Failure of F-15 crane. 13. The F-15 crane must be parked on
12. Slip Trip & Fall. a level land with the supporting jacks
to prevent it from toppling.
14. The F-15 crane must be tested
and certified and periodic
maintenance of the crane must be
done.
15. All Scrap materials, tools and
tackles must be properly stacked and
away from the walk way to prevent
1. Improper posture of 1. Proper posture required for the
Dismantling of old work may lead to muscle work
sprain. 2. Job specific tools must be used to
3 structural plate/ 2. Wrong tool selection avoid sprain and muscle fatigue.
member may lead to sprain and 3. Proper material lifting techniques
muscle fatigue. must be used for manual lifting.
Ergonomics 3. Improper technique for 4. The maximum manual load lifting
manual material handling capacity for individual must not be
may lead to lower lumbar exceeded.
sprain.

1. FR jackets must be used.


2. Drink sufficient water to prevent
dehydration.
3. Continuous working by individual
1. Heat stress worker must not be allowed.
4. Area must be wetted by water to
Environment 2. Coke dust prone zone supress coke dust
5. Nose musk and safety goggles must
be used.
1. Water logging due to 1. During rainy season and flood
rain. condition avoid electrical works and
2. Heat Stress during the use of power tool in waterlogged
summer. areas.
3. Cyclone and stormy 2. During summer season ORS drinks
weather must be provided .
4. Structure Collapse during 3. All height works and scafolding jobs
earthquake. must be stopped
4. Crane operation must be stopped if
Special Climatic wind velocity is =< 48 m/sec square.
Conditions 5. No Lifting of materials at height
should be performed.
6. Evacuation of all workers and
employees to the emergency
assembly point.

1. Proper PPEs must be used.


2. The job area must be effectively
barricaded.
3. Fire Extinguishers and water
bucket must be present at the
jobsite.
4. The Gas cutting set must be
fitted with flash back arrestor and
NRV and the hoses must be in
good condition without any cracks
and the hose connections must be
checked with soap wate for any
leakage before starting the job.
5. The area must be thoroughly
cleaned and no flamable
1. Personal injury by sharp substances should be kept in the
edge of the fabricated MS vicinity of hot work.
angle/channel/Plate or SS 6. FR jackets must be used by the
plate/ pipe..
2. Impact injury while gas cutter and his helper along
handling the fabricated MS with hand sleeve and leg sleeve.
angle/channel/Plate or SS 7. A gas musk must be used to
plate/ pipe. . avoid the inhallation of toxic
3. Fire hazard due to gas fumes of welding and gas cutting
cutting. specially while working in a closed
4. Burn Injury. area.
Safety 5. Chemical Hazards (toxic 8. The working platform must be
fumes from gas cutting & fitted with toe guard to prevent
welding)
5. Falling of fabricated MS the fall of tools, tackles and
angle/channel/Plate or SS fabricated materials from height
plate/ pipe from height. and safety net must also be used
5. Falling of tools and to collect the falling debris of
tackles from height. fabrication job.
6. Person falling from 9. Full body harness must be used
height. while working at height.
7. Slip Trip & Fall. 10. Effective housekeeping must
be done to prevent slip trip and
fall hazards.

4 Fabrication
checked with soap wate for any
leakage before starting the job.
5. The area must be thoroughly
cleaned and no flamable
1. Personal injury by sharp substances should be kept in the
edge of the fabricated MS vicinity of hot work.
angle/channel/Plate or SS 6. FR jackets must be used by the
plate/ pipe..
2. Impact injury while gas cutter and his helper along
handling the fabricated MS with hand sleeve and leg sleeve.
angle/channel/Plate or SS 7. A gas musk must be used to
plate/ pipe. . avoid the inhallation of toxic
3. Fire hazard due to gas fumes of welding and gas cutting
cutting. specially while working in a closed
4. Burn Injury. area.
Safety 5. Chemical Hazards (toxic 8. The working platform must be
fumes from gas cutting & fitted with toe guard to prevent
welding)
5. Falling of fabricated MS the fall of tools, tackles and
angle/channel/Plate or SS fabricated materials from height
plate/ pipe from height. and safety net must also be used
5. Falling of tools and to collect the falling debris of
tackles from height. fabrication job.
6. Person falling from 9. Full body harness must be used
height. while working at height.
7. Slip Trip & Fall. 10. Effective housekeeping must
be done to prevent slip trip and
fall hazards.

4 Fabrication

1. Proper posture required for the


work
1. Improper posture of 2. Job specific tools must be used to
work may lead to muscle avoid sprain and muscle fatigue.
sprain. 3. Proper material lifting techniques
2. Wrong tool selection must be used for manual lifting.
may lead to sprain and 4. The maximum manual load lifting
Ergonomics muscle fatigue. capacity for individual must not be
3. Improper technique for exceeded.
manual material handling
may lead to lower lumbar
sprain.

1. FR jackets must be used.


2. Drink sufficient water to prevent
dehydration.
3. Continuous working by individual
1. Heat stress worker must not be allowed.
4. Area must be wetted by water to
Environment 2. Coke dust prone zone supress coke dust
5. Nose musk and safety goggles must
be used.
1. During rainy season and flood
condition avoid electrical works and
the use of power tool in waterlogged
areas.
1. Water logging due to 2. During summer season ORS drinks
rain. must be provided .
2. Heat Stress during
Special Climatic summer. 3. All height works and scafolding jobs
3. Cyclone and stormy must be stopped
Conditions 4. Crane operation must be stopped if
weather
4. Structure Collapse during wind velocity is =< 48 m/sec square.
earthquake. 5. No Lifting of materials at height
should be performed.
6. Evacuation of all workers and
employees to the emergency
assembly point.

1. Personal injury by 1. The working area must be


Safety sharp edge of the adequately barricaded.
dismantling material. 2. Hot Work permit must be taken.
2. Fire hazard due to gas 3. The Ground area above which
1. Proper posture required for the
work
1. Improper posture of 2. Job specific tools must be used to
work may lead to muscle avoid sprain and muscle fatigue.
sprain. 3. Proper material lifting techniques
2. Wrong tool selection must be used for manual lifting.
may lead to sprain and 4. The maximum manual load lifting
Ergonomics muscle fatigue. capacity for individual must not be
3. Improper technique for exceeded.
manual material handling
may lead to lower lumbar
sprain.

1. FR jackets must be used.


2. Drink sufficient water to prevent
dehydration.
3. Continuous working by individual
1. Heat stress worker must not be allowed.
4. Area must be wetted by water to
Erecting New Environment supress coke dust
5 Structural plate/ 2. Coke dust prone zone
5. Nose musk and safety goggles must
members be used.
5 Structural plate/
members

1. During rainy season and flood


condition avoid electrical works and
the use of power tool in waterlogged
areas.
1. Water logging due to 2. During summer season ORS drinks
rain. must be provided .
2. Heat Stress during
Special Climatic summer. 3. All height works and scafolding jobs
3. Cyclone and stormy must be stopped
Conditions 4. Crane operation must be stopped if
weather
4. Structure Collapse during wind velocity is =< 48 m/sec square.
earthquake. 5. No Lifting of materials at height
should be performed.
6. Evacuation of all workers and
employees to the emergency
assembly point.

PREPARED BY: ANJANAV ROY APPROVED BY:


DESIGNATION: SAFETY OFFICER DESIGNATION:

SIGNATURE: SIGNATURE:
IS
RRC/HSE/JHA/3758/19-20

Required PPEs Responsibility

1. Electrical Hand
gloves. Supervisor, Jr.
2. Safety Shoe. Engineer
3. Safety Helmet. (Production,
4. Nose Musk. Mechanical &
5. HV Jacket. Electrical) and job
6. FR Jacket (If Supervisors
required)

1. Safety helmet Supervisor, Jr.


1. Safety helmet Supervisor, Jr.
2. Safety Goggles Engineer
3. nose musk (Production,
4. Hand Gloves Mechanical &
5. HV Jacket Electrical) and job
6. Safety Shoe Supervisors,
1. Safety helmet
2. Safety Goggles
3. nose musk
4. Hand Gloves
5. HV Jacket. Supervisor, Jr.
6. FR Jacket (If Engineer
working in hot (Production,
zone) Mechanical &
7. Safety Shoe Electrical) and job
8. Welders Face Supervisors, Gas
Shield. Cutter & Rigger.
9. Leg Guard.
10. Hand Sleeve.
11. Gas Cutters
Face Shield.
1. Safety helmet
2. Safety
Goggles
3. nose musk
4. Hand Gloves Supervisor, Jr.
5. HV Jacket. Engineer
6. FR Jacket (If (Production,
working in hot Mechanical &
zone) Electrical) and
1. Safety helmet
2. Safety
Goggles
3. nose musk
4. Hand Gloves Supervisor, Jr.
5. HV Jacket. Engineer
6. FR Jacket (If (Production,
working in hot Mechanical &
zone) Electrical) and
7. Safety Shoe job Supervisors,
8. Welders Face Gas Cutter &
Shield. Rigger.
9. Leg Guard.
10. Hand Sleeve.
11. Gas Cutters
Face Shield.
1. Safety helmet
2. Safety
Goggles
3. nose musk
4. Hand Gloves Supervisor, Jr.
5. HV Jacket. Engineer
6. FR Jacket (If (Production,
working in hot Mechanical &
zone) Electrical) and
7. Safety Shoe job Supervisors,
8. Welders Face Gas Cutter &
Shield. Rigger.
9. Leg Guard.
10. Hand Sleeve.
11. Gas Cutters
Face Shield.
zone) Electrical) and
7. Safety Shoe job Supervisors,
8. Welders Face Gas Cutter &
Shield. Rigger.
9. Leg Guard.
10. Hand Sleeve.
11. Gas Cutters
Face Shield.

RAJSEKHAR PRADHAN
CEO