CONSENT ORDER
Sub : Consent under Section 25/26 of The Water (Prevention and control of Pollution) Act, 1974
(as amended) for discharge of effluent to M/s. KALPAKAARU PROJECTS PRIVATE
LIMITED
1. For disposal of effluent into water body or drain or land under The Water (Prevention and control of
Pollution) Act,1974 as amended (here in after referred as the act ) M/s. KALPAKAARU PROJECTS
PRIVATE LIMITED is hereby authorized by the board for discharge of their industrial effluent
generated through ETP for irrigation/river through drain and disposal of domestic effluent through
septic tant/soak pit subject to general and special conditions mentioned in the annexure ,in refrence
to their foresaid application .
2. This consent is valid for the period from 01/08/2020 to 31/07/2025 .
3. In spite of the conditions and provisions mentioned in this consent order UP Pollution Control Board
reserves its right and powers to reconsider/amend any or all conditions under section 27(2) of the
Water (Previntion and Controt of Pollution) Act, 1974 as amended .
This consent is being issued with the permission of competent authority .
Enclosed : As above
(condition of consent):
Regional Officer
U.P. POLLUTION CONTROL BOARD, LUCKNOW
1. This consent is valid only for the approved production capacity of Wooden Furniture.
2. The quantity of maximum daily effluent discharge should not be more than the following :
Effluent Discharge Details
S.No Kind of Effulant Maximum daily Treatment facility and
discharge,KL/day discharge point
1 Domestic 3.5 KLD STP
3. Arrangement should be made for collection of water used in process and domestic effluent
separately in closed water supply system. The treated domestic and industrial effluent if discharged
outside the premises, if meets at the end of final discharge point, arrangement should be made for
measurement of effluent and for collecting its sample. Except the effluent informed in the
application for consent no other effluent should enter in the said arrangements for collection of
effluent. It should also be ensured that domestic effluent should not be discharged in storm water
drain .
4(a) The domestic effluent should be treated in treatment plant so that the should be in conformity with
the following norms dated treated effluent .
Domestic Effulant
S.No Parameter Standard
1 Total Suspended Solids As per norms
2 BOD As per norms
3 COD As per norms
4 Oil & Grease As per norms
4(b). The industrial effluent should be treated in treatment plant so that the treated effluent should be in
conformity with the following norms. .
Industrial Effulant
S.No Parameter Standard
5. Effluent generated in all the processes, bleed water, cooling effluent and the effluent generated from
washing of floor and equipments etc should be treated before its disposal with treated industrial
effluent so that it should be according to the norms prescribed under The Environment (Protection)
Act,1986 or otherwise mandatory .
6. The other pollutant for which norms have not been prescribed, the same should not be more than the
norms prescribed for the water used in manufacturing process of the industry .
7. The method for collecting industrial and domestic effluent and its analysis should be as per legal
Indian standards and its subsequent amendments/standards prescribed under The Environment
(Protection) Act, 1986.
8. The treated domestic and industrial effluent be mixed (as per the provisions of Condition No. 2) and
disposed of on one disposal point. This common effluent disposal point should have arrangement for
flow meter/V Notch for measuring effluent and its log book be maintained .
Specific Conditions:
1.It is NOT ALLOWED to dig BORE-WELL in the UNIT without CGWA NOC. In case of
violation, Environmental Compensation shall be imposed and legal proceedings will be initiated
against the industry.
2.Industry shall ensure adequate plantation and green belt within its premises. Green cover shall be
in compliance of approved map from concerned Authority.
3.Industry shall comply with various Waste Management Rules as notified by MoEf&CC i.e. Plastic
Waste Management Rules, 2016, Solid Waste Management Rules, 2016, Hazardous and Other
Wastes (Management and Transboundary) Rules, 2016, E-waste (Management) Rules, 2016,
Construction and Demolition Waste Management Rules, 2016
4.Industry shall submit annual returns as per above mentioned rules. Also, Environmental Statement
in prescribed form as per Rule 14 of Environment (Protection) Act, 1986.
5.This consent is valid only for products and quantity mentioned above. Industry shall obtain prior
approval before making any modification in product/process/discharge/plant machinery failing
which consent would be deemed void.
6.Industry shall make rain water water harvesting on the premises as per map approved by concerned
Authority. Pre-monsoon and Post- monsoon maintenance of rain water harvesting pit shall be done
annually.
7.Industry shall abide by directions given by Hon'ble Supreme Court, High Court, National Green
Tribunals, Central Pollution Control Board and Uttar Pradesh Pollution Control Board for protection
and safeguard of environment from time to time.
8.Industry shall develop green belt in accordance with Government Order 07/55-02-
2018/09(writ)/2016 dated 26/02/2018 and UPPCB Office order issued vide letter no.
H16405/220/2018/02 dated 16/02/2018
9.Industry shall ensure carbon offsetting as per Government Order (Environment Department) issued
vide letter no. H17259/ 183/55-2-2018/09(writ)/2016 dated 15.03.2018
10.Industry shall ensure compliance of CPCB Directions dated 02.07.2019 issued u/s 18(1)(b) of Air
Act, 1981 to SPCBs of NCR, regarding conversion of industrial units in NCR to PNG.