A2 PHC PIU COL FOOTING PLINTH Revised - 15.07.2020-Model
A2 PHC PIU COL FOOTING PLINTH Revised - 15.07.2020-Model
0138
C33 4.0000
C1 C2 C3
B1
Notes
1.5000
SCHEDULE OF R.C.C. COLUMNS & FOOTINGS Concrete Grade M-25
8mm#5" C/C
B1
C4 --- 530 10MM @ 125MM C/C BOTTOM STEEL 460 300 16MM # 10 #8MM 125 150
C5 B1
3.0000
¾"
COMBINED 8MM @ 150MM C/C TOP STEEL 1.3595
C7 AS PER DRAWING 460 300 16MM # 10 #8MM 125 150
5.0994 10.3700
16MM # 6 + 125 150
C10 530 300 #8MM
C2 530 300
20MM # 6
16MM # 12 #8MM 125 150 C9
C10 C11
2.5000
C12
B1
C13
Schedule of Lap Length
8mm#5" C/C
C3 460 300 16MM # 10 #8MM 125 150
530 10MM @ 125MM C/C BOTTOM STEEL
---
4M X 7.43M 8MM @ 150MM C/C TOP STEEL #8MM 3.0000
C8 COMBINED 530 300 16MM # 12 125 150 3.0000
(For Rectangular Column) 3.0000
x x
C14 3M X 2.5M 300 600 10MM @ 125MM C/C B/W 530 300 16MM # 8 + #8MM 125 150
20MM # 6
C15 530 300 16MM # 8 + #8MM 125 150 (For Rectangular Column)
3M X 2.5M 300 600 10MM @ 125MM C/C B/W 20MM # 6 2.4500
16MM # 8 + 10nos. of Bars 2.5000
300 530 #8MM 125 150
C16 20MM # 6
--- 530 10MM @ 125MM C/C BOTTOM STEEL
COMBINED 4.46M X 4.26M
8MM @ 150MM C/C TOP STEEL 16MM # 6 + #8MM 125 150
C17 600 300 2.4500
10mm 150mm C/C 10mm 150mm C/C
20MM # 8 2.5000
2.5000
BW Double Jali BW Double Jali
C18 2.45M X 3M 300 680 380 600 25MM # 8 + #8MM 125 150
10MM @ 125MM C/C B/W 20MM # 6
C19 2.45M X 3M 300 680 10MM @ 125MM C/C B/W 380 600 25MM # 8 + #8MM 125 150 C22
20MM # 6 C21 C23
3.0000 3.0250 C24
C20 300 600 10MM @ 125MM C/C B/W 300 600 25MM # 4 + #8MM 125 150
2.5M X 3M 20MM # 10 3.0000
C21 2.5M X 3M 680 10MM @ 125MM C/C B/W 680 300 16MM # 6 + #8MM 125 150 2.5000
300
20MM # 8
C22 300 680 10MM @ 125MM C/C B/W 380 600 25MM # 8 + #8MM 3.0000
2.45M X 3M 20MM # 6 125 150
C23 300 680 380 600 25MM # 8 + #8MM 125 150
2.45M X 3M 10MM @ 125MM C/C B/W 20MM # 6 C27
530 C25 C26 C28
2.9000 3.0000
C24 2.5M X 3.025M 300 600 10MM @ 125MM C/C B/W 300 600 25MM # 4 + #8MM 125 150 2.5000 2.5000
20MM # 10
C25 3M X 2.5M 10MM @ 125MM C/C B/W 20MM # 6 + #8MM 125 150
300 600 600 300 16MM # 6 10mm 125mm C/C
C26 3M X 2.5M 300 680 10MM @ 125MM C/C B/W 680 300 25MM # 4 + #8MM 125 150 Top Steel Bottom steel 2.5000
20MM # 10 3.0000
3.0000
25MM # 14 #8MM 3.0000
C27 2.5M X 2.9M 125 150
300 680 10MM @ 125MM C/C B/W 380 680
SECTION X-X 3.0000
C31 3M X 2.65M 300 600 600 300 20MM # 12 #8MM 125 150
10MM @ 125MM C/C B/W
C32 3M X 2.5M 300 600 10MM @ 125MM C/C B/W 600 300 20MM # 12 #8MM 125 150 LOCATION:- MODHUKA
C33 2M X 1.5M 300 530 10MM @ 125MM C/C B/W 460 300 16MM # 10 #8MM 125 125
12MM- 4 NOS. CROSS BARS NOTE : CONTINUE THE STEEL BARS OF FOOTING BETWEEN COLUMN NO. C18-C19, C15-C20,
NOTE: COMMON P.C.C. OFFSET OF 75MM AS PER DRAWING
C22-C23, C21-C25, C24-C28, C30-C31.
GL
PROJECT:- P.H.C
3" PEDESTAL
H/4
3"
DRAWN CHECKED DATE SCALE
4"TH
P.C.C(1:3:6)
TIES-8#@ 6" C/C
Y Y
Beam-B1 A B
Typical Details of Beam
Beam-B2
TIES-8#@5"C/C
16MM #10
FLOOR LEVEL. Y Y STRUCTURAL ENGINEERS
Section A-A Section B-B
530