This document provides a schedule of reinforced concrete (R.C.C.) columns and footings. It lists 13 columns (C1 through C13) with their sizes, reinforcement details, and footing sizes. The footing sizes range from 1.3595m x 1.3595m to 10.37m x 5.0994m. Reinforcement includes rebar sizes ranging from 8mm to 20mm placed with specified spacing and lap lengths.

Uploaded by

Pratik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views

A2 PHC PIU COL FOOTING PLINTH Revised - 15.07.2020-Model

This document provides a schedule of reinforced concrete (R.C.C.) columns and footings. It lists 13 columns (C1 through C13) with their sizes, reinforcement details, and footing sizes. The footing sizes range from 1.3595m x 1.3595m to 10.37m x 5.0994m. Reinforcement includes rebar sizes ranging from 8mm to 20mm placed with specified spacing and lap lengths.

Uploaded by

Pratik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

2.0000 12.

0138
C33 4.0000
C1 C2 C3
B1
Notes
1.5000
SCHEDULE OF R.C.C. COLUMNS & FOOTINGS Concrete Grade M-25
8mm#5" C/C
B1

COLUMN R.C.C. FOOTINGS R.C.C. COLUMNS STIRRUPS C4

DEPTH SIZE (For Rectangular Column) 4.4600


4.7650
NO. SIZE
d D
REINFORCEMENT
B D
STEEL STEEL END CENTRE 14nos. of Bars

C1 460 300 16MM # 10 #8MM 125 150 C6 C7 7.4312 C8

C4 --- 530 10MM @ 125MM C/C BOTTOM STEEL 460 300 16MM # 10 #8MM 125 150
C5 B1
3.0000
¾"
COMBINED 8MM @ 150MM C/C TOP STEEL 1.3595
C7 AS PER DRAWING 460 300 16MM # 10 #8MM 125 150
5.0994 10.3700
16MM # 6 + 125 150
C10 530 300 #8MM
C2 530 300
20MM # 6
16MM # 12 #8MM 125 150 C9
C10 C11
2.5000
C12
B1
C13
Schedule of Lap Length
8mm#5" C/C
C3 460 300 16MM # 10 #8MM 125 150
530 10MM @ 125MM C/C BOTTOM STEEL
---
4M X 7.43M 8MM @ 150MM C/C TOP STEEL #8MM 3.0000
C8 COMBINED 530 300 16MM # 12 125 150 3.0000
(For Rectangular Column) 3.0000
x x

C12 530 300 16MM # 12 #8MM 125 150 12nos. of Bars


4.4600
C13 530 300 16MM # 12 #8MM 125 150
C14 2.5000 C15 2.5000
C5 300 460 #8MM 125 150
16MM # 10
10MM @ 150MM C/C BOTTOM STEEL #8MM 4.4345
C6 COMBINEDAS PER DRAWING - - - 530 460 300 16MM # 10 125 150 C16
8MM @ 150MM C/C TOP STEEL
C9 300 600 16MM # 4 + #8MM 125 150 B1 4.2550
20MM # 10
C11 3M X 2.5M 300 600 10MM @ 125MM C/C B/W
530 300 16MM # 12 #8MM 125 150 8mm#5" C/C 3.0000
C18
C19
3.0000
C20
Notes
Double C17

C14 3M X 2.5M 300 600 10MM @ 125MM C/C B/W 530 300 16MM # 8 + #8MM 125 150
20MM # 6
C15 530 300 16MM # 8 + #8MM 125 150 (For Rectangular Column)
3M X 2.5M 300 600 10MM @ 125MM C/C B/W 20MM # 6 2.4500
16MM # 8 + 10nos. of Bars 2.5000
300 530 #8MM 125 150
C16 20MM # 6
--- 530 10MM @ 125MM C/C BOTTOM STEEL
COMBINED 4.46M X 4.26M
8MM @ 150MM C/C TOP STEEL 16MM # 6 + #8MM 125 150
C17 600 300 2.4500
10mm 150mm C/C 10mm 150mm C/C
20MM # 8 2.5000
2.5000
BW Double Jali BW Double Jali
C18 2.45M X 3M 300 680 380 600 25MM # 8 + #8MM 125 150
10MM @ 125MM C/C B/W 20MM # 6
C19 2.45M X 3M 300 680 10MM @ 125MM C/C B/W 380 600 25MM # 8 + #8MM 125 150 C22
20MM # 6 C21 C23
3.0000 3.0250 C24
C20 300 600 10MM @ 125MM C/C B/W 300 600 25MM # 4 + #8MM 125 150
2.5M X 3M 20MM # 10 3.0000

C21 2.5M X 3M 680 10MM @ 125MM C/C B/W 680 300 16MM # 6 + #8MM 125 150 2.5000
300
20MM # 8
C22 300 680 10MM @ 125MM C/C B/W 380 600 25MM # 8 + #8MM 3.0000
2.45M X 3M 20MM # 6 125 150
C23 300 680 380 600 25MM # 8 + #8MM 125 150
2.45M X 3M 10MM @ 125MM C/C B/W 20MM # 6 C27
530 C25 C26 C28
2.9000 3.0000
C24 2.5M X 3.025M 300 600 10MM @ 125MM C/C B/W 300 600 25MM # 4 + #8MM 125 150 2.5000 2.5000
20MM # 10
C25 3M X 2.5M 10MM @ 125MM C/C B/W 20MM # 6 + #8MM 125 150
300 600 600 300 16MM # 6 10mm 125mm C/C
C26 3M X 2.5M 300 680 10MM @ 125MM C/C B/W 680 300 25MM # 4 + #8MM 125 150 Top Steel Bottom steel 2.5000
20MM # 10 3.0000
3.0000
25MM # 14 #8MM 3.0000
C27 2.5M X 2.9M 125 150
300 680 10MM @ 125MM C/C B/W 380 680
SECTION X-X 3.0000

C28 3M X 2.5M 300 680 25MM # 4 + #8MM 125 150


300 680 10MM @ 125MM C/C B/W 20MM # 10
C29 10MM @ 125MM C/C B/W 600 300 20MM # 12 #8MM 125 150 3.1500
3M X 2.5M 300 600
#8MM
C29
2.5000
C30 C31
2.6586
C32
2.5000
FOR:- P.I.U
C30 2.5M X 3.15M 300 600 10MM @ 125MM C/C B/W 300 600 20MM # 12 125 150

C31 3M X 2.65M 300 600 600 300 20MM # 12 #8MM 125 150
10MM @ 125MM C/C B/W
C32 3M X 2.5M 300 600 10MM @ 125MM C/C B/W 600 300 20MM # 12 #8MM 125 150 LOCATION:- MODHUKA
C33 2M X 1.5M 300 530 10MM @ 125MM C/C B/W 460 300 16MM # 10 #8MM 125 125
12MM- 4 NOS. CROSS BARS NOTE : CONTINUE THE STEEL BARS OF FOOTING BETWEEN COLUMN NO. C18-C19, C15-C20,
NOTE: COMMON P.C.C. OFFSET OF 75MM AS PER DRAWING
C22-C23, C21-C25, C24-C28, C30-C31.

GL
PROJECT:- P.H.C
3" PEDESTAL
H/4

2" COVER SCHEDULE OF R.C.C BEAM (M - 25)


FLOOR LEVEL Column
SIZE BOTTOM STEEL TOP STEEL STIRRUPS
TITLE : LAYOUT OF
3" 3" SHORT BARS
BEAM NO
B D FULL BAR MID BAR
CURTAIL
FULL BAR
LEFT RIGHT
CURTAIL BAR CURTAIL BAR
STEEL SUPPORT CENTER
C/C C/C
R.C.C. FOOTINGS & COLUMNS
18" LONG BARS
Long Span Steel
B1 230530 4 # 16 MM - - - - - - - - 4 # 16 MM -------- - - - - - - - - 8 MM Ø 125 125
@ FOUNDATION LEVEL
≥12"
H/4

TIES-8#@5"C/C Short Span Steel CROSS BAR


4" PCC 1:3:6
'D'

18" Layout of R.C.C.Beams


HARD STRATA A B
'd'

3"
DRAWN CHECKED DATE SCALE
4"TH

P.C.C(1:3:6)
TIES-8#@ 6" C/C

Typical Regular footing detail 15/07/20 NTS

Y Y
Beam-B1 A B
Typical Details of Beam
Beam-B2

Sheet No.-1 REV NO.


H/4

TIES-8#@5"C/C
16MM #10
FLOOR LEVEL. Y Y STRUCTURAL ENGINEERS
Section A-A Section B-B
530

OSR & ASSOCIATES


H/4

10mm 125mm C/C


Top Steel 8mm 150mm c/c Bottom steel
MILAN H. MANEK 99090 32322
COLUMN DETAILING FOOTING DETAIL TYPICAL SECTION OF RAFT SANDEEP D. CHANDNANI 91061 92319
DIMESIONS ARE NTS.