Final-Term Papers Solved Mcqs With Reference
Final-Term Papers Solved Mcqs With Reference
o Design
o Code
o Requirement
o Testing
o Identifying the defect in early stages of development so that it may not be amplified
o Identifying the detect in the later stages of project
o By performing the testing activity only
o By increasing the team member in a team
4. While developing the software if the bug is caught then it is termed as
o Error
o Defect
o Fault
o Mistake
5. When a software is delivered to a client and then client reports the bug in it then that bug is termed as
o Error
o Defect
o Mistake
o Fault
6. When a software is delivered to a client and then client reports the bug in it then that bug is termed
as .
o Error
o Defect
o Failure
o Test Case
o Critical
o Physical
o Logical
o Neural
11. The ----------------- system provides a common value scale for every software task, regardless of the type of
work being performed.
o SCM
o CM
o All of the given
o Earned value PG # 102
12. Review is a type of that helps preventing the bugs to move in the next stage of software
development
13. Quality has a direct and indirect cost in the form of cost of
16. Risk Analysis and management involves addressing the following concerns except:
17. Two tools for computing critical path and project completion times from activity networks are
o 1
o 2
o 3 PG # 122
o 4
o Tester
o Developer
o Client
o None of the given options
o Maintenance
o Development
o Testing
o All of the given options
o Requirement elicitation
o Requirement, organization
o Requirement documentation
o All of the given options PG # 128
Requirement Management is defined as a systematic approach to eliciting, organizing, and documenting the
requirements of the system, and a process that establishes and maintains agreement between the customer and the
project team on the changing requirements of the system.
23. While assessing a legacy system for further decision, one should decide the following about the supplier
24. Following factors should be considered while assessing the legacy system except
25. is the process of Design recovery. At this stage the documentation of the overall functionality is
created.
o Database Engineering
o Reverse Engineering PG # 139
o Refactoring
o Forward Engineering
26. The need for business process re-engineering arrives because the
28. With a complex class you have to move data and methods around in small pieces to avoid errors, it seems slow
but it is the _ _ _ _ _ _ _ _ _because you avoid debugging
o Quickest PG # 163
o Problem
o None of the given options
o Slowest
29. integrates system and software disciplines into single process improvement framework for
introducing new disciplines as needs arise.
o SEI
o CMMI PG # 168
o CMM
o ISO
o 6
o 1
o 0
o 5 PG # 169
31. Level is the lowest capability level of CMMI in Continuous representation.
o 1
o 0 PG # 169
o 5
o 6
32. The processes at of CMM focus on continually improving process performance through both
incremental and innovative technological changes/improvements.
o Level 5 PG # 173
o Level 1
o Level 4
o Level 3
33. Quantitative process-improvement objectives for the organization are established, continually revised to reflect
changing business objectives at CMM
o Level 3
o Level 2
o Level 5 PG # 173
o Level 1
o Business processes
o System hardware
o Marketing PG # 134
o Application software
35. In which stage of software development loop, we try to find the solution of the problem on technical grounds
and base our actual implementation on it.
o Technical Development PG # 10
o Technical Design
o Implementation
o Testing
36. Which of the following is not one of the characteristics to describe a KPA?
o Resources PG # 13
o Goals
o Activities
o Commitments
o McCabe
o Barry Boehm PG # 20
o Robert Cazeman
o William Smith
38. Which of the following is NOT one of the 5 steps defined by Reel to improve the chances of success?
40. In the potential for new technology or new business idea is explored.
41. When more than one users interpret the same requirement in different ways then we can say that the
requirement is:
o Unambiguous
o Incomplete
o Incorrect
o Ambiguous PG # 71
45. The goal of software development is to develop --------------- software, on time and on budget.
o Quality PG # 127
o Budgeted
o User friendly
o Complete
46. requires application of SE principles, methods, and concepts to re-create an existing application.
o Reverse Engineering
o Business Engineering
o Business Process Engineering
o Forward Engineering PG # 140
47. A process is "a set of logically related tasks performed to achieve a defined business outcome”.
o Business PG # 141
o Software
o CMM
o ISO
o Waterfall Model PG # 15
o Incremental Model
o RAD Model
o Spiral Model
49. Which of the following concepts is not associated with extreme programming?
o Pair Programming
o Iteration
o Release
o Large Projects
50. Software project management primarily deals with metrics related to:
o Development process
o Defects
o Availability
o Productivity and quality PG # 65
51. In the spiral model ' risk analysis' is performed
o In the first
o in the first and second loop
o In every loop
o before using spiral mode
52. If we plot a graph between defects reported, and defects fixed then:
o This graph will show that the defect detection process is not accurate
o Difference between defects reported and fixed will show the defects yet to be fixed PG # 78
o This graph will show that some requirements are ambiguous
o We can not draw any information from that graph
54. is a document driven model because a set of documents is produced at each level of the model.
o Waterfall model PG # 16
o Rapid Prototyping Model
o Build and Fix Model
o None of the given
55. is a SQA activity that focuses on identification of potential hazards which may affect software
negatively and cause an entire system to fail.
56. A Software Requirement Specification (SRS) is traced if the origin of its requirements is .
o Clear PG # 133
o Uncertain
o Ambiguous
o Confusing
57. is a bad smell in code, when a change requires lots of little changes in many different classes.
58. A major issue in requirements engineering is the rate at which requirements change once the requirements
phase has “officially” .
o Opened
o Approved
o Ended PG # 131
o extended
59. engineering does not simply create a modern-equivalent of an older program, rather new user and
technology requirements are integrated into the reengineering effort.
o Busiess Process
o Enterprise
o Forward PG # 140
o Reverse
Note: Give me a feedback and your Suggestion also If you find any mistake in mcqz plz
inform me Via Contact us Page on our Site. And tell me your answer with references.
For More Solved Papers By Arslan Visit Our Website:
Www.pakeducation4u.com