Scope of Works

The memorandum requests preparation of a contract for replacing 45 fire exit doors at the Expansion Area of Festival Supermall. The scope of work includes dismantling existing doors and frames, replacing door closers and panic devices, installing new stainless steel doors and frames, and restoring affected areas. The contractor will conduct site inspections, provide necessary insurance and permits, safety equipment, and submit a schedule and methodology. Upon completion, the contractor will provide a 1-year warranty and conduct a final inspection with mall engineering personnel.

Uploaded by

Eug
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
113 views

Scope of Works

The memorandum requests preparation of a contract for replacing 45 fire exit doors at the Expansion Area of Festival Supermall. The scope of work includes dismantling existing doors and frames, replacing door closers and panic devices, installing new stainless steel doors and frames, and restoring affected areas. The contractor will conduct site inspections, provide necessary insurance and permits, safety equipment, and submit a schedule and methodology. Upon completion, the contractor will provide a 1-year warranty and conduct a final inspection with mall engineering personnel.

Uploaded by

Eug
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Festival Supermall, Inc.

, Filinvest Corporate City


Alabang, Muntinlupa City

M E M O R A N D U M
MR. ROMEO T. BAUTISTA
TO : DATE : 01/25/2020
FVP – FAI CPCAD
CC : BMCS/FILE
FROM : BMCS – ENGINEERING
REF. NO. COM-BMCS-M-003-2020
SCOPE OF WORKS FOR THE REPLACEMENT OF (45) FIRE EXIT DOOR AT EXPANSION
SUBJECT:
AREA

We would like to request preparation of contract for the completion of the above mentioned project to wit;

SCOPE OF WORKS:

Supply of labor, materials, tools, equipment and technical supervision for the ff;

Ι. AREA COVERAGE:

 Festival Mall Expansion – 45units


(Please see attached file)

II. MOBILIZATION:

 Contractor to conduct a site inspection for the actual condition and measurements
 Contractor to provide Contractor All Risk Insurance (CARI) and necessary Government
permits (if required).
 Contractor to provide safety equipments, signage’s, safety gears for manpower, and
caution signage’s to ensure public safety.
 Contractor to submit methodology and bar chart for schedule of works.

III.CIVIL WORKS:

 Dismantling of existing fire exit door and jambs,


 Replacement of defective door closer and panic device. (Same specs or equivalent)
 Alignment of doors
 Installation of stainless steel door jamb and stainless steel door panel
 Others: Restoration/Repainting of affected areas

IV. OTHER TERMS AND CONDITIONS:

 Contractor to submit Technical Properties of the materials to be applied or use.


 Contractor to conduct joint inspection with Engineering Personnel prior to turn over and
acceptance.
 Manual corrections of deficiencies listed on the punch list.
 Contractor to maintain cleanliness at all times particularly every after the scheduled
works.
 Contractor to haul debris outside FCC premises daily.
V. Warranty:

 Contractor to provide warranty on the project for (1) year from the date of final acceptance in
workmanship and damaged due to faulty materials.

Prepared by: Checked by:

Engr. Joezel C. Pante/ Ar. Arianne Rodriguez Aaron B. Pera


BMCS – Project Engineer/ Project Architect BMCS – Officer

Noted by:

Arch. Paolo V. Perez


Sr. Manager – Engineering