F.17(85)/Engg./DERC/2017-18/5767
In the matter of: Schedule of Charges and the procedure under Delhi Electricity
Regulatory Commission (Supply Code and Performance
Standards) Regulations, 2017.
Order
(Date of Order: 31.8.2017)
Sl.
Classification System of Supply
No.
(i) Low Tension
a. Single phase at
Load upto 10 kW
230/240V
b. Load above 10 kW and upto 200 kW/215 3 phase 4 wire at
kVA 400/415V
(ii) High Tension
a. Load exceeding 100kW /108kVA and
3 phase at 11kV
upto 4000kVA
(iii) Extra High Tension
a. 3 phase at 33kV or
Load exceeding 4000kVA
above
Page 1 of 58
(2) The applicant having load exceeding 100kW/108 kVA and upto
200kW/215kVA shall have the choice to opt for receiving supply at low
tension or high tension.
(3) The developer shall have the option to receive supply at lower voltage
levels for its members as per applicable classification of supply
irrespective of whether the aggregated demand of developer requires
supply at high tension or extra high tension level.
(4) In case where supply, depending upon the technical conditions of the
system, has to be given at voltage other than those specified above,
the Licensee may give the same subject to the approval of the
Commission.
(2) The distribution licensee shall establish separate counters for senior
citizens, women and differently abled persons for submission of
application and for receipt of payments:
Provided that the distribution licensee shall also provide the requisite
infrastructure facilities as required for differently abled persons.
Page 2 of 58
S. No. Tariff Category (as per Security Deposit for
Tariff Order) Permanent Connection (Rs.
Per kW or per kVA as the case
may be)
(1) (2) (3)
1 Domestic
(i) Upto 2kW 600
(ii) Above 2kW upto 5kW 900
(iii) Above 5kW 1200
2 Non-Domestic 4500
3 Industrial 4500
4 Agriculture 300
5 Public Lighting 3000
6 Railway, DMRC, DIAL, DJB 3000
7 Mushroom Cultivation 600
8 Advertisement and 4500
Hoardings
9 Any other category not To be decided by the
specified above Commission
Provided that the Bank Guarantee shall be renewed atleast one month in
advance from the date of its expiry:
Provided further that if the Bank Guarantee is not renewed one month
prior to its date of expiry, the distribution licensee may encash the bank
guarantee and keep the money received as security deposit.
(1) The distribution licensee shall pay interest on security deposit annually
to the consumer from the date of such security deposit at Marginal
Cost of Fund based Lending Rate (MCLR) as notified by State Bank of
India prevailing on the 1st (first) April of that financial year:
Provided that for the period prior to the date of applicability of this
Order, the interest on security deposit shall be payable as per Delhi
Electricity Supply Code and Performance Standards Regulations, 2007.
(i) Above EHT Actual cost Not Not 15% cost of Actual 4+7
4MVA and the applicable applicable Labour &
Page 3 of 58
requisite Transportati +8
space for the on
purpose of
housing
metering and
other
equipment
(ii) Above HT (i) a)50% of Not 15% cost of Actual 4+5
1MVA Where new cost towards applicable Labour & +7+
grid HT system Transportati 8
substation including civil on
is required work, as
to be applicable
established upto the point
a) Rs. 75 of supply;
lakhs per and
MVA; and
b) provide
b) provide the space for
the space for installation of
installation switchgear,
of new grid metering
sub-station. cubicle, etc
(ii)
Where
supply is to
be
extended
from the
existing
grid sub-
station and
new grid
substation
is not
required to
be
established
a) Rs. 1.25
crore per
MVA
b) provide
the space for
installation of
switchgear,
metering
cubicle, etc
Page 4 of 58
(iv) Above LT (i) a)50% of a) 50% 15% cost of Actual 4+5
1MVA Where new cost towards LT Labour & +6+
grid HT system system Transportati 7+8
substation including civil including on
is required work, as civil cost,
to be applicable 100%
established upto the point cost
a) Rs. 75 of supply; towards
lakhs per and service
MVA; and line,
street
b) provide b) provide lights, as
the space for the space for applicabl
installation installation of e upto
of new grid switchgear, the point
sub-station. metering of
cubicle, etc supply;
(ii) and
Where
supply is to b) provide
be extended the space
from the for
existing grid installation
sub-station of
and new distribution
grid transfor-
substation mers,
is not switch-
required to gear,
be metering
established cubicle,
a) Rs. 1.25 service line
crore per etc
MVA
b) provide
the space
for
installation
of
distribution
trans-
Page 5 of 58
formers,
switch-
gear,
metering
cubicle,
service line
etc
Note:- Developers falling under category at Sr. No. (ii) & (iv) above who have
provided the land for installation of grid substation for release of connection for first
time and demands the load subsequently from the distribution licensee shall be
required to pay Rs. 0.75 Crore per MVA for the cost towards EHT system and other
costs as applicable.
(i) Above EHT Actual cost Not Not 15% cost of Actual 4+7
4MVA and the applicable applicable Labour & +8
requisite Transportati
space for the on
purpose of
housing,
metering and
other
equipment
(ii) Above HT (i) a)50% of Not 15% cost of Actual 4+5
1MVA Where new cost towards applicable Labour & +7+
grid HT system Transportati 8
substation including civil on
is required work, as
to be applicable
established upto the point
a) Rs. 75 of supply;
lakhs per and
MVA; and
b) provide
b) provide the space for
the space for installation of
installation switchgear,
of new grid metering
sub-station. cubicle, etc
(ii)
Where
supply is to
be
extended
from the
existing
grid sub-
station and
new grid
substation
is not
Page 6 of 58
required to
be
established
a) Rs. 1.25
crore per
MVA
b) provide
the space for
installation of
switchgear,
metering
cubicle, etc
Note:-Consumers falling under category at Sr. No. (ii) above who have provided
the land for installation of grid substation for release of connection for first time and
demands the load subsequently from the distribution licensee shall be required to
pay Rs. 0.75 Crore per MVA for the cost towards EHT system and other costs as
applicable.
(i) The normative SLD charges shall be payable by the applicant for taking new
electricity connection at LT supply for the connections upto 200kW/215 kVA
as under:
Sl. Type of Area Sanctioned Amount Road Total
No. Load (Rs.) Restoration
charges
1 2 3 4 5 6
Page 7 of 58
(iii) More than Rs.25000 + Actual RR 4+5
150kW to Rs.400 per charges for
200kW/ kW or per service line
215kVA kVA as the
case may be
for load
beyond
150kW
(i) Un- Load upto 4kW, Rs. 8000 per Actual RR 4+5
Electrified other than kW charges for
Area as on agriculture service line
31.7.2017* connection
(ii) The applicant taking load upto 10kW in un-electrified areas shall have the
option to pay the SLD charges in twelve equal monthly installments.
Page 8 of 58
(iii) Air- Insulated Sub-station-33/11 45Mx35M
kV Grid substation with 2PTR
(3) The developer /applicant taking supply at High Tension level shall
provide space for installation of switchgear and metering cubicle of
requisite dimensions as agreed with the Licensee.
(4) The developer/applicant taking supply at Low Tension level for any
premises or for re-constructed premises, requiring LT Service
connections whose:
(i) total cumulative demand of all floors in the plot/ building for LT
service connection exceeds 100 kW/108 kVA; or
(ii) total cumulative built up area of the premises in the
plot/building exceeds 1000 sqm; or
(iii) plot of size above 300 sqm or above;
Page 9 of 58
Provided also that if the required space is not provided by the
applicant or the developer, the distribution Licensee may refuse the
grant of additional load:
(5) The cost incurred for acquisition of space including the annual license
fee if any shall be borne by the developer or the applicant.
Page 10 of 58
(ii) Three phase connection 500
(9) Meter testing charges 32 (2) (ii)
(i) Single phase 200
(ii) Three phase 500
(iii) CT meter 1000
(iv) HT meter 4000
(10) Meter Testing charges in case of As per 32 (8) (vii) (b)
tampered meter Actuals
(11) Copy of duplicate bill 20 per bill 38 (9)
(12) Dishonoured cheque 200 47 (3)
1
If shifting requires new service line, the consumer shall pay the applicable
Service Line cum development (SLD) charges to the distribution licensee as
per the Regulations.
(1) The distribution licensee shall schedule a date and time for the testing
of meter in the accredited laboratory referred at Regulation 32 (8) (i)
of Supply Code Regulations and shall give at-least 3 (three) days prior
notice to the consumer, intimating the date & time and place of testing
so that the consumer or his authorized representative, if so desires,
may be present during such testing.
(2) The meter shall generally be tested on the scheduled date and time as
intimated to the consumer:
Provided further that such rescheduled date of meter testing shall not
be later than 30 days from the original scheduled date.
(3) In case for any reason, if the meter could not be tested on scheduled
date and time, the distribution licensee shall reschedule the date and
time not later than 30 (thirty) days from such last scheduled date,
with the consent of consumer.
(1) The following particulars shall be indicated in the bill as per the form at
Annexure X:
(i) Bill Number
(ii) Billing period
(iii) Consumer number, name and address
(iv) Bill type - Provisional or actual
(v) Meter Number (In case meter was replaced during the billing
cycle, the bill shall indicate the meter number of new as well
as old meter, date of replacement, final reading of old meter
and initial reading of new meter at the time of replacement of
meter.)
(vi) Meter type
Page 11 of 58
(vii) Supply type
(viii) Applicable tariff Category
(ix) Status of meter (Visual Inspection)
(x) Security deposit with the Licensee
(xi) Service Line cum Development charges along with
corresponding load
(xii) Sanctioned Load
(xiii) Maximum Demand (MD)
(xiv) Power Factor
(xv) Fixed charges
(xvi) Meter Reading of previous billing cycle and date of reading
(xvii) Current Meter Reading and date of reading
(xviii) Multiplying factor of the meter, if any
(xix) Details of unit consumed slot-wise for ToD Tariff along with its
charges.
(xx) Billed Units- This shows the total units consumed for the
particular billing cycle.
(xxi) Slab Calculation (units, rate, amount) - This gives the breakup
of charges for the billed units for each slab of tariff.
(xxii) Energy charge
(xxiii) Arrear amount
(xxiv) Due Date including last date before which the bill has to be
paid.
(xxv) Late Payment Surcharge
(xxvi) Amount payable (rounded off) within the due date- net
amount to be paid before the due date.
(xxvii) Government subsidy, if any
(xxviii) Compensation to the consumer, if any
(xxix) Previous Consumption Pattern (Bill Month, Units, Status)- This
shows the consumption pattern for last six months
(xxx) Other information as applicable to kVAh billing and HT
consumers to be appropriately added and unrelated items to
be deleted.
(xxxi) Address and Contact Number of Forum.
(xxxii) Address and contact number of billing office/distribution centre
(xxxiii) Date of printing of bill
(xxxiv) Any other information which the Licensee deems fit.
(2) On the request of consumer, the distribution licensee shall provide the
statement of duration of each instance of no current for more than 30
minutes for last 30 days from the date of request of consumer, on
payment of Rs. 20 per statement by the consumer, within 15 days of
receipt of request:
Page 12 of 58
11. Manner of Preparation of Report under Regulation 57(1) and
Regulation 61(1) of Supply Code Regulations:-
12. Procedure for filing appeal before the Appellate Authority under
Section 127 of the Act under Regulation 59(1) of Supply Code
Regulations:
(1) The appeal shall be made in the form specified at Schedule II to this
Order.
(2) The Memorandum of Appeal shall be accompanied by a documentary
evidence for deposit of a sum with the licensee, as provided under
sub-section (2) of Section 127 of the Act.
(3) In addition to the deposit of sum as per sub-section (2) of Section 127
of the Act, the memorandum of appeal shall be accompanied by the
following fee:
(4) The fee shall be paid in such form as the Appellate Authority may
direct.
Page 13 of 58
13. Manner for providing information on scheduled outages under
Regulation 70(5) of Supply Code Regulations:-
(1) The Licensee shall upload the information in advance of the anticipated
schedule of power outages along with reasons thereof for next 15 days
on their website.
(3) The anticipated schedule of power outages for 15 days from the 1st day
of the month to 15th day of month shall be uploaded by 22nd day of the
preceding month and for remaining days of the month i.e. from 16th day
to end of the month shall be uploaded by 8th day of the current month:
Provided that the Licensee shall update the information and confirm the
schedule of power outages or any change thereof at least 7 days in
advance:
The Licensee shall furnish the information as per the Formats I-XVI prescribed
with this Order.
This Order shall be applicable from the date of applicability of Delhi Electricity
Regulatory Commission (Supply Code and Performance Standards)
Regulations, 2017 and shall remain in force till revised.
Sd/-
(B.P.Singh)
Member
Page 14 of 58
ANNEXURE -I
Format of application form – New Connection
2. Name of
father/husband/director/partner/trustee:
3. Address:
Street
Area/colony
Pin Code
Telephone No.:
Mobile:
E-mail:
Street
Area/colony
Pin Code
Telephone No.:
Mobile:
E-mail:
Page 15 of 58
(iii) Industrial
(iv)Agricultural/(v)
Mushroom/(vi) Public
Lighting/(vii)DJB/(viii)DIAL/(ix)
Railway Traction/(x) DMRC/(xi)
Advertising/Temporary Supply
Note: the applicant shall refer the applicable tariff schedule for correct tariff category. In
case of any doubt, the applicant shall seek help of the licensee.
6. Purpose of supply
Place: Name:
Declaration
Or
Or
Page 16 of 58
THAT the Applicant has requested the licensee to provide a service connection at the above-
mentioned premises in the Applicant’s name for the purpose mentioned in the application form.
THAT in furnishing the present Declaration, the Applicant has clearly understood that should any
of the statements in this declaration prove to be false or incorrect at any later stage, the
licensee shall be within his lawful rights to disconnect supply to the premises without any prior
notice and proceed to adjust electricity supply dues payable by the applicant against consumer
security deposit and /or recover the same in accordance with Law.
THAT the Applicant has complied with all requirements under all statute for the time being in
force and the Applicant himself/herself shall be held legally responsible for any issue arising out
of any such noncompliance for which the licensee may initiate action in accordance with
applicable law.
1. That in case the applicant is not the sole owner of the premises, no objection certificate
for seeking electricity connection from the co-owner has been obtained.
2. To indemnify the licensee against all proceedings, claims, demands, costs, damages,
expenses that the licensee may incur by reason of a fresh service connection given to the
Applicant.
3. That to the best of applicant’s knowledge, all electrical works done within the premises
are as per Central Electricity Authority (Measures relating to Safety and Electricity Supply)
Regulations, 2010 as amended from time to time.
4. That the internal Wiring at the premises has been tested by a Licensed Electrical
Contractor and the test certificate is available with the applicant:
Provided that in case of Government quarters/ offices, the certificate issued by the
designated officer of the Government may be accepted by the distribution licensee.
5. *That the building has been constructed as per prevalent building Bye-Laws and the total
height of the building
(i) does not exceed 15 (fifteen) meters on the date of seeking service connection; Or
(ii) is more than 15 (fifteen) meters and Fire Clearance certificate is available with the
applicant.
6. *That there is a provision of lift in premises and the applicant has obtained the lift fitness
certificate from the Electrical Inspector for the lift in the said premises and the same is
available with the applicant.
7. That the applicant has applied for the correct category of tariff as per the applicable tariff
schedule. For either of the following categories of connection, the applicant has the
relevant documents available with him.
a. Industrial
Valid Industrial License/Factory License/Lal Dora Certificate in case of rural village
b. Agricultural Consumers
i. Certificate of Residence from Block Development Officer
ii. No Objection Certificate from Development Commissioner/Block Development
Officer Delhi Jal Board for tube wells
ii. No Objection Certificate for Khokha/Temporary Structure for single delivery supply
Page 17 of 58
d. Charging station for electric vehicles
An undertaking by the applicant that the charging station for electric vehicles is as per
the specifications as may be specified by Central Electricity Authority or Bureau of
Indian Standards from time to time.
9. That I will provide a copy of any of above applicable documents to the licensee pursuant
to request of any external government agency, judicial forum or any other authority
seeking such information.
11.The applicant further agrees to indemnify and hold harmless, the licensee, in case of any
injury or incident on account of any fault in electrical work in the premises. The licensee
shall not be liable for any mishap or incident occurring at the premises to the applicant on
account of any faulty/defective/inferior quality wiring at the premises for which the
connection is being applied.
12.To pay the electricity consumption bills and all other charges at the rates set out in the
licensee’s Tariff Schedule and miscellaneous charges for supply as may be in force from
time to time, regularly as and when the same becomes due for payment.
13.To deposit the additional security deposit and additional service line cum development
(SLD) charges, if any from time to time based on the prevailing Orders/rules, directions
and Regulations of the Commission.
14.To abide by the provisions of the Electricity Act, 2003, all applicable laws, conditions of
Supply/Tariff Orders and any other Rules or Regulations as may be notified by the
Commission, as applicable from time to time.
16.That as per Delhi Electricity Regulatory Commission (Supply Code and Performance
Standards) Regulations, 2017 or as amended from time to time, I shall provide suitable
and adequate space for installation of the meter/electrical equipments where the licensee
may have ready access to the same.
17.To allow clear and un-encumbered access to the meters for the purpose of meter reading
and it’s checking etc.
18.That the Applicant would let the licensee disconnect the service connection under
reference, in the event of any default, non-compliance of statutory provisions and in the
event of a legally binding directive by Statutory Authority (ies) to effect such an order.
Page 18 of 58
This shall be without prejudice to any other rights of the licensee including that of getting
its payment as on the date of disconnection.
19.All the above declaration given by the Applicant shall be construed to an Agreement
between the licensee and the Applicant.
Page 19 of 58
ANNEXURE -II
Format of application form – Temporary connection
2. Name of
father/husband/director/partner/trustee:
3. Address:
Street
Area/colony
Pin Code
Telephone No.:
Mobile:
E-mail:
Street
Area/colony
Pin Code
Telephone No.:
Mobile:
E-mail:
Page 20 of 58
6. Period of Temporary Connection
Place: Name:
Page 21 of 58
ANNEXURE -III
Format of application form – Name change of registered consumer
Photograph
Licensee name M/s….
Application No._________________
Street
Area/colony
Pin Code
Telephone No.:
Mobile:
E-mail:
Indicate landmarks (Pole
No./Feeder Pillar No./Nearest
House No.) to identify the
location
4. Name
5. Telephone No.
6. Mobile Number
7. E-mail Id
Place: Name:
Page 22 of 58
ANNEXURE - IV
Format of application form – Load Enhancement
after enhancement
Area /Colony
Pin Code
Telephone No.:
Mobile No.:
E-mail:
5 List of Documents:
(i) Identity Proof
(ii) Declaration
Signature of Applicant
Declaration
Or
Or
A Sole proprietorship/ a partnership firm having its office at
_____________________________ (hereinafter referred to as the applicant which unless
the context otherwise provides includes its successors and assigns), through
Mr.___________________, who is a partner or an authorized representative do hereby
swear and declare as under:
THAT the Applicant is a lawful occupant of the premises at
____________________________________ (hereinafter the “Premises”).
THAT the Applicant has requested the licensee to provide a service connection at the above-
mentioned premises in the Applicant’s name for the purpose mentioned in the application
form.
Page 23 of 58
THAT in furnishing the present Declaration, the Applicant has clearly understood that should
any of the statements in this declaration prove to be false or incorrect at any later stage,
the licensee shall be within his lawful rights to disconnect supply to the premises without
any prior notice and proceed to adjust electricity supply dues payable by the applicant
against consumer security deposit and /or recover the same in accordance with Law.
THAT the Applicant has complied with all requirements under all statute for the time being
in force and the Applicant himself/herself shall be held legally responsible for any issue
arising out of any such noncompliance for which the licensee may initiate action in
accordance with applicable law.
1. That in case the applicant is not the sole owner of the premises, no objection
certificate for seeking electricity connection from the co-owner has been
obtained.
3. That to the best of applicant’s knowledge, all electrical works done within the
premises are as per Central Electricity Authority (Measures relating to Safety
and Electricity Supply) Regulations, 2010 as amended from time to time.
4. That the internal Wiring at the premises has been tested by a Licensed
Electrical Contractor and the test certificate is available with the applicant:
5. *That the building has been constructed as per prevalent building Bye-Laws
and the total height of the building
(i) does not exceed 15 (fifteen) meters on the date of seeking service
connection; Or
(ii) is more than 15 (fifteen) meters and Fire Clearance certificate is available
with the applicant.
6. *That there is a provision of lift in premises and the applicant has obtained
the lift fitness certificate from the Electrical Inspector for the lift in the said
premises and the same is available with the applicant.
7. That the applicant has applied for the correct category of tariff as per the
applicable tariff schedule. For either of the following categories of connection,
the applicant has the relevant documents available with him.
a. Industrial
Valid Industrial License/Factory License/Lal Dora Certificate in case of
rural village
b. Agricultural Consumers
i. Certificate of Residence from Block Development Officer
ii. No Objection Certificate from Development Commissioner/Block
Development Officer Delhi Jal Board for tube wells
Page 24 of 58
ii. No Objection Certificate for Khokha/Temporary Structure for single delivery
supply
11.The applicant further agrees to indemnify and hold harmless, the licensee, in
case of any injury or incident on account of any fault in electrical work in the
premises. The licensee shall not be liable for any mishap or incident
occurring at the premises to the applicant on account of any
faulty/defective/inferior quality wiring at the premises for which the
connection is being applied.
12.To pay the electricity consumption bills and all other charges at the rates set
out in the licensee’s Tariff Schedule and miscellaneous charges for supply as
may be in force from time to time, regularly as and when the same becomes
due for payment.
13.To deposit the additional security deposit and additional service line cum
development (SLD) charges, if any from time to time based on the prevailing
Orders/rules, directions and Regulations of the Commission.
14.To abide by the provisions of the Electricity Act, 2003, all applicable laws,
conditions of Supply/Tariff Orders and any other Rules or Regulations as may
be notified by the Commission, as applicable from time to time.
Page 25 of 58
17.To allow clear and un-encumbered access to the meters for the purpose of
meter reading and it’s checking etc.
18.That the Applicant would let the licensee disconnect the service connection
under reference, in the event of any default, non-compliance of statutory
provisions and in the event of a legally binding directive by Statutory
Authority (ies) to effect such an order. This shall be without prejudice to any
other rights of the licensee including that of getting its payment as on the
date of disconnection.
Page 26 of 58
ANNEXURE - V
Format of application form – Load Reduction
Load Reduction
after reduction
Area /Colony
Pin Code
Telephone No.:
Mobile No.:
E-mail:
5 List of Documents:
Signature of Applicant
Page 27 of 58
ANNEXURE - VI
Street
Area /Colony
Pin Code
Telephone No.:
Mobile No.:
E-mail:
ii. No Objection Certificate for Khokha/Temporary Structure for single delivery supply
Signature of Applicant
Page 28 of 58
ANNEXURE VII
Format of application form – Meter Testing Report
Licensee Name M/s____________________________________
Application No. _________________________________
1. CONSUMER PARTICULARS:
K. No.:
Name of the applicant/organization:
Address: House/plot/premises No.
Street
Area /Colony
Pin Code
Telephone No.:
Mobile No.:
E-mail:
Sanctioned Load:
2. METER PARTICULARS:
Dial No.:
Size:
Type: C. T. Ratio:
C. T. Ratio:
3. REVOLUTION/PULSE TEST:
Load:
Error:
Page 29 of 58
4. RESULT:
(i) Results are within Limits
It is to certify that the testing has been carried out as per the procedure prescribed by the
Commission. An external load of …… kW was used for testing for 1 kWh and total time taken
was……..min. The testing was carried out by using optical scanner for counting the
pulses/revolutions. Before entering the premises the Identity Card was shown and Visiting
Note 1: Observations, if any, of the party shall also be recorded in the report.
2: Approximate time taken for test for different external loads is as under:
1 kW 60
2 kW 30
4 kW 15
5 kW 12
Page 30 of 58
ANNEXURE -VIII
Format of application form – Disconnection
Application No.___________________________
Street
Area/colony
Pin Code
Telephone No.:
Mobile:
E-mail:
Place: Name:
Page 31 of 58
ANNEXURE -IX
Format of application form – Inspection Report
Street
Area/colony
Pin Code
Telephone No.:
Mobile:
E-mail:
6. Sanctioned Load
a. Summer
b. Winter
c. Petty load
Page 32 of 58
Reading Meter Terminal Seal Found__________________
(KWH)_________________ No_____________
_______________________
_______________________
_______________________
Reading Working
(KVARH)_______________ meter__________________
MDI)__________________ Cable
__________ Status__________________
Power
Factor)_________________
Size)__________________
Type)__________________
CT Ratio)
__________________
Page 33 of 58
ANNEXURE - X
DISCOM NAME
Due Date:----------------------
Cycle No.:
Bill Amount SLD charges Interest Present Meter Previous Meter MF Unit
Unit of paid on Reading Reading Consumed
Security alongwith security (C=A-B)
deposit corresponding deposit
load Date Reading Date Reading
(A) (B)
Bill Calculations
Page 34 of 58
(Rs/KW/Month) month (Rs/Unit) Consumed (Rs.) (Rs.)
Surcharge(D)@...%
of ……
charges
Details of compensation:-
Compensation Claimed Compensation paid whether claimed or suo-motu or on
direction of competent authority
IMPORTANT MESSAGE
ON REVERSE OF BILL
Page 35 of 58
Schedule-I
Page 36 of 58
Page 37 of 58
Page 38 of 58
Schedule II
Between
Appellant
AND
Respondents
1. Details of Applicant:
Fax Number(s):
E-mail ID:
a. Name:
b. Address:
a. Name/Designation:
b. Address:
6. Sanctioned load:
Page 39 of 58
7. Particulars of the meter installed:
8. Date of Inspection:
PRAYER
Appellant
VERIFICATION
I, ………………………… the Appellant declare that the facts stated in the above
Memorandum of Appeal are true to my knowledge (or based on information from ……….
and believed by me to be true); no part of the same are false and nothing material has
been concealed therefrom.
Verified at …………….. on this ……… day of ………
Appellant
Place:
Date:
Page 40 of 58
Format I
Fatal and non-fatal accident report
Name of Company:
Period of Report:
Year:
Page 41 of 58
Format II
Action taken report for safety measures complied for the accidents occurred
Name of Company:
Period of Report:
Year:
Sl. Locatio Date of Type of Cause Findings Remedi Whethe Action Amount
No. n of occurre accide of of es r the taken to paid as
acciden nce nt accide CEI/EI sugges remedy avoid compensa
t and nt /AEI ted by suggest recurren tion
details CEI/EI ed is ce of
of /AEI in complie such
victim various d accident
cases s
Page 42 of 58
Format III
Restoration of Power Supply
Name of Company:
Period of Report:
Year:
Continuous
power failure
affecting
individual
consumer
and group of
consumer
upto 100
connected at
Low voltage
supply,
excluding
the failure
where
distribution
transformer
requires
replacement.
Continuous
power failure
affecting
more than
100
consumers
connected at
Low voltage
supply
excluding
the failure
where
distribution
transformer
requires
replacement.
Continuous
power
supply
failure
requiring
replacement
of
distribution
transformer.
Continuous
power failure
affecting
consumers
connected
Page 43 of 58
through High
Voltage
Distribution
System
(HVDS) and
not covered
under (i) &
(ii) above
Continuous
scheduled
power
outages
Replacement
of burnt
meter or
stolen meter
Page 44 of 58
Format IV
Quality of Power Supply
Name of Company:
Period of Report:
Year:
Local
Problem
Tap setting
of
transformer
Repair of
Distribution
Line/transfo
rmer/
capacitor
Installation
and Up
gradation of
High
Tension/
Low
Tension
System
Page 45 of 58
Format V
Complaint about meters
Name of Company:
Period of Report:
Year:
Complaint
lodged for
accuracy
test of
meter-Fast
Complaint
lodged for
accuracy
test of
meter-
Slow
Complaint
lodged for
defective /
stuck
meter
Complaint
lodged for
burnt
meter
Complaint
lodged for
stolen
meter
Page 46 of 58
Format VI
Name of Company:
Period of Report:
Year:
Where no
RoW or road
cutting
permission is
required
Where RoW
or road
cutting
permission is
required
Page 47 of 58
Format VII
Applications for New connections/Additional Load, where power supply requires
extension of distribution system
Name of Company:
Period of Report:
Year:
1. Electrified
Areas (where
extension of
line upto five
poles is
required)
2. Electrified
Areas (Where
extension of
lines or
augmentation
of
Distribution
Transformati
on capacity ,
where peak
load of
transformer
has reached
90% of its
rated
capacity)
3. Electrified
Areas (Where
new
Distribution
Transformer
is required)
4. Electrified
Areas (Where
existing 11
KV network
needs to be
augmented)
5. Electrified
Areas (Where
existing
66/33 kV grid
sub-station
needs to be
augmented)
Page 48 of 58
Format VIII
Connection in un-electrified areas
Name of Company:
Period of Report:
Year:
Service Standard Pending Complaint Total Complaints attended during Balance
Area complaint received Complaint the month complaint
of the during to be
previous the Within Beyond Total attended
month month Specified specified
Time time
Un-
Electrified
Areas
(Where
connection
from
nearby
existing
network is
possible)
Un-
Electrified
Areas/
Green Field
Projects
(Where new
network is
to be laid or
grid station
needs to be
established)
Page 49 of 58
Format IX
Transfer of Consumer’s connection and conversion of services
Name of Company:
Period of Report:
Year:
Transfer of
Name
Load
reduction
Change of
category
In case
connection
is denied
after
receipt of
payment
against
demand
note
Connection
energized
through
loop
If notice for
downward
revision if
any is not
sent
Page 50 of 58
Format X
Complaints about consumer’s bills, disconnection, reconnection of supply
Name of Company:
Period of Report:
Year:
1 2 3 4 5=3+4 6 7 8= 9=5-8
6+7
Complaints
on billing
Non-
payment of
dues by the
consumer
Request for
reconnection
Consumer
wanting
disconnection
Page 51 of 58
Format XI
Failure of Distribution Transformer
Name of Company:
Period of Report:
Year:
1 2 3=1+2 4 5=(4)*100/(3)%
Page 52 of 58
Format XII
Failure of Power Transformer
Name of Company:
Period of Report:
Year:
1 2 3=1+2 4 5=(4)*100/(3)%
Page 53 of 58
Format XIII
Summary of Overall Standards of Performance
Name of Company:
Period of Report:
Year:
(v) Continuous
scheduled power
outages
Page 54 of 58
meter
2. Maximum duration in
a single stretch
Restoration of supply
by 6:00 PM
Reliability Indices
4. SAIFI
SAIDI
CAIDI
5. Frequency variation
6. Voltage imbalance
7. Percentage billing
mistakes
Page 55 of 58
Format XIV
Compensation Details
Name of Company:
Period of Report:
Year:
11. Total
Page 56 of 58
Format XV
Unauthorised Use of Electricity
Name of Company:
Period of Report:
Year:
No. of cases No. of cases No. of cases No. of cases No. of cases
booked where UUE is where appeal decided by decided by
established filed by the the Appellate the Appellate
by the consumer Authority in Authority in
Licensee before the favour of the favour of the
Appellate Licensee consumer
Authority
Page 57 of 58
Format XVI
Theft of Electricity
Name of Company:
Period of Report:
Year:
Page 58 of 58