1. The document provides a bill of quantities for construction projects including two trusses, two buildings, and toilets. It includes quantities of materials like concrete, rebar, bricks, etc. 2. The quantities are provided in units like cubic meters, square meters, numbers, and kilograms. Rates and amounts are also provided for each item. 3. The total estimated cost for all items is Rs. 695.87 lakhs.

Uploaded by

kanagarajodisha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
178 views

Sensitivity: LNT Construction Internal Use

1. The document provides a bill of quantities for construction projects including two trusses, two buildings, and toilets. It includes quantities of materials like concrete, rebar, bricks, etc. 2. The quantities are provided in units like cubic meters, square meters, numbers, and kilograms. Rates and amounts are also provided for each item. 3. The total estimated cost for all items is Rs. 695.87 lakhs.

Uploaded by

kanagarajodisha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

S No Description Unit one item

truss 1 1 Excavation for footing m^3 8.5


2 Excavation for slab m^3 760
3 Backfilling for footing m^3 5.1
4 RC footing concrete + pedestal m^3 7.625
5 Lintel Beam m^3 38
6 PCC for floor m^3 190
7 Structural Steel kg 64600
8 HYSD bar kg 20100

truss 2 1 Excavation for footing m^3 8.5


2 Excavation for slab m^3 550
3 Backfilling for footing m^3 5.1
4 RC footing concrete + pedestal m^3 7.625
5 Lintel Beam m^3 25
6 PCC for floor m^3 137.5
7 Structural Steel kg 46750
8 HYSD bar kg 13320

Building 1 1 Excavation for footing m^3 6


2 Backfilling for footing m^3 3.6
3 RC footing m^3 2
4 RC Lintel beams m^3 240
5 RC columns m^3 3.24
6 RC Beams m^3 240
7 RC slab m^3 120
8 HYSD rebar kg 146200
9 Brickwork m^2 720
cement plaster m^2

Building 2 1 Excavation for footing m^3 6


2 Backfilling for footing m^3 3.6
3 RC footing m^3 2
4 RC Lintel beams m^3 160
5 RC columns m^3 1.44
6 RC Beams m^3 160
7 RC slab m^3 18.375
8 HYSD rebar kg 49176.875
9 Brickwork m^2 720
cement plaster m^2

# Sensitivity: LNT Construction Internal Use


Toilet 1 tiles m^2 80
2 Doors (std dim) nos
3 windows (std dim) nos
cement plaster m^2

Brickwork truss 1 m^2 1760


Brickwork truss 2 m^2 1776
cement plaster m^2

# Sensitivity: LNT Construction Internal Use


Quantity Total Quantity Rate Amount

12 102 192.96 19682 Truss 1


760 192.96 146650 Area considered 20*38m
12 61.2 2183.01 133600 footing dimension 3*2.5*.75
12 91.5 9590.70 877549 Pedestal 1*1*2m ht
2 76 9706.30 737679 lintel beam 1*1 cross section
190 6322.05 1201190 grad slab thick 0.25m
64600 110.0 7106000 Rebar ratio 120kg/m^3
20100 77.0 1548416 Str. Steel 85kg/m^3
0
8 68 192.96 13121
550 192.96 106128 Truss 2
8 40.8 2183.01 89067 Area considered 25*22m
8 61 9590.70 585033 footing dimension 3*2.5*.75
2 50 9706.30 485315 Pedestal 1*1*2m ht
137.5 6322.05 869282 lintel beam 1*1 cross section
46750 110.00 5142500 grad slab thick 0.25m
13320 77.04 1026114 Rebar ratio 120kg/m^3
0 Str. Steel 85kg/m^3
0
40 240 192.96 46310
40 144 192.96 27786 Area considered 20*20m
40 80 9590.70 767256 footing dimension 2*2*.5
240 9706.30 2329512 colum dim 0.6*0.6*9m ht
40 129.6 9706.30 1257936 lintel beam 1*1 cross section
2 480 9706.30 4659024 slab thick 0.3m
2 240 9706.30 2329512 Rebar ratio 125kg/m^3
146200 77.04 11262605
2 331.2 7755.21 2568526
1440 289.94 417514
0
16 96 192.96 18524
40 144 192.96 27786 Area considered 3.5*3.5m (5nos)
16 32 9590.70 306902 footing dimension 2*2*.5
160 9706.30 1553008 colum dim 0.6*0.6*4m ht
16 23.04 9706.30 223633 lintel beam 1*1 cross section
1 160 9706.30 1553008 slab thick 0.3m
1 18.375 9706.30 178353 Rebar ratio 125kg/m^3
49176.875 77.04 3788370
2 1440 7755.21 11167502
1440 289.94 417514

# Sensitivity: LNT Construction Internal Use


0
28 2240 1177.34 2637242 Toilet area considere 4*4*4 m ht
50 3500 175000 No of toilets (total) 28
75 1500 112500
2240 289.94 649466
0
1760 0
1776 0
3536 289.94 1025228
69587342