Appendix 10 Technical Specification
Appendix 10 Technical Specification
RFQ-Technical Specification
Technical Specification
1. CABLE / WIRE.............................................................................................................33
2. CONDUIT......................................................................................................................66
0. Common Application
1) All tools and materials for installation are included in the scope of supply of
subcontractor.
2) Set/Chemical Anchor Bolt & Nut, Washer, Shim, Liner, Taper Liner for the
installation of all the equipments and materials are included in the scope of supply
of subcontractor.
3) Subcontractor should carry out self-test and accomplish the inspection of 3rd party
/ Owner / Contractor.
4) Subcontractor should submit the certificate of performance guarantee for the all
equipments and materials.
5) Subcontractor should accomplish all concerned inspection and test at the site
6) Subcontractor should obtain all necessary license of government office.
7) Components of Transformer, Switchgear and other Panels must be used as the
imported from foreign maker and can be assembled in Bangladesh.
8) All Cable and Wire’s terminal/connection works and test are included in the scope
of supply of subcontractor.
9) All Accessories / Sub-Materials /Components for each item’s supply and
installation are in the scope of supply of subcontractor.
10) The all Material of Steel should be Hot Dip Galvanized or SUS304/316, if it is
not specified in this specification or drawing.
11) Cables and cable trays have to fulfill the all necessary number plates for
identifying the cables
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
1. Cable / Wire
- HFIX Wire
: Fire Resistant, Low Smoke and Halogen Free Thermosetting Polyolefin
INSULATED WIRE (HFIX) for Building including terminal lug, Terminal cap,
insulation tube, sleeve, cable tie, Pull Box, Outlet Box, Cable Glands(BRASS &
RUBBER PACKING), WIRE CONNECTOR, etc
- GV Wire
: Fire Resistant GREEN PVC INSULATED, STRANDED COPPER WIRE including
Compression type terminal lug, Compression Type Connector, Sleeve, Clamp,
Earth Terminal/Test Box(with Busbar), Pull Box, Outlet Box, Bolt & Nut, cable tie,
sleeve, Cable Glands(BRASS & RUBBER PACKING), etc
- BC Wire
: BARE STRANDED ANNEALED COPPER WIRE, Including Compression type
terminal lug, Compression Type Connector, Heavy Duty Cast Cable Saddle(Copper),
One Hole Clip with Round head Steel Screw, Test Clamp with Countersunk Steel
Screw, Sleeve/clamp, Grounding Box(with Busbar), TEST WELL(with Busbar),
Rubber Expansion Anchor, Earth pad, cable tie, Pull Box, Outlet Box, Earthing BAR,
Steel Plate(Hot dip galvanized), Bolt&Nut,Washer, etc
1) CVV
: Fire Resistant, 0.6/1KV FR-CVV (CONTROL CABLE, OVERALL SHIELD),
UNARMOURED, 0.6/1kV XLPE Insulated and Tray Flame-Retardant PVC
Sheathed Control Cable(TFR-CVV), including terminal lug, Terminal cap,
insulation tube, sleeve, cable tie, Pull Box, Outlet Box, Cable Glands(BRASS &
RUBBER PACKING), etc
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
2) CVVS
: Fire Resistant, 0.6/1KV FR-CVVS (SIGNAL CABLE, INDIVIDUAL+OVERALL
SHIELD), UNARMOURED/PVC INSULATION/COPPER TAPE SHIELD/FLAME-
RETARDANT PVC SHEATH, including terminal lug, Terminal cap, insulation tube,
sleeve, cable tie, Pull Box, Outlet Box, Cable Glands(BRASS & RUBBER
PACKING), etc
3) CVV-SB
: Fire Resistant, 0.6/1KV Tray Flame-Retardant PVC Sheathed Copper. Braid
Shield Control Cable, including terminal lug, Terminal cap, insulation tube, sleeve,
cable tie, Pull Box, Outlet Box, Cable Glands(BRASS & RUBBER PACKING), etc
4) CPEV
: Fire Resistant, City Pair Polyethylene PVC, UNARMOURED, Polyethylene
insulated Polyvinyl Chloride sheathed pair cable for telephone, shielding consists
of a combination of aluminum foil laminated polyester tape and drain wire, for easy
grounding, Flame retardant and weather resistant, including terminal lug, Terminal
cap, insulation tube, sleeve, cable tie, Pull Box, Outlet Box, Cable Glands(BRASS
& RUBBER PACKING), etc
5) UTP Cable
: UNSHIELDED TWISTED PAIR Cable, SOLID ANNEALED COPPER 1/0.5mm
CONDUCTOR, CAT.7-4/25/50/100P, PVC INSULATION, SCREENED AND PE
SHEATH, Including Pull Box, Outlet Box, terminal/Splicing/Connection kits &
communication test, Cable Glands(BRASS & RUBBER PACKING), etc
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
6) F/O Cable
: Fiber Optic Cable 12C(or24C), Loose Tube Optic Cable - Direct buried, 6hairs/
tube, 2 tubes, outdoor type, including Pull Box, Outlet Box, terminal kits and
Splicing/Connection work & communication test, Cable Glands(BRASS &
RUBBER PACKING), etc
7) FR-3 Cable
: Fire Resistant and Heat Resistant Cable, XLPE Insulated and PVC Sheathed
Heat-Resistant Control and Signal Cable, Solid or Circular stranded annealed
copper conductor, , Multi Cores or Twisted Pairs of cable shall be assembled to
form a circular cable with a fire-protect layer including terminal lug, Terminal cap,
insulation tube, sleeve, cable tie, Pull Box, Outlet Box, Cable Glands(BRASS &
RUBBER PACKING), etc
2. Conduit
2.2 CD CONDUIT
1) Fire Resistant Polyethylene Corrugated Conduit
2) Including accessories such as Coupling, Coupling Socket, Saddle, Spacer,
Saddle Spacer, End-Bell, Outlet Box, Junction Box(Square, Circle, octangle,
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
2way, 3way, 4way, etc), Mounting Block Box, Box Connector, Conduit Clamp,
Conduit Bushing, Reducer, Pipe Mounting Bracket, Corn Sleeve, End Cover,
Other pipe fittings, Warning tape, etc
Conduits and conduit fittings shall be used Class 4 protection against corrosion.
The protective coatings on conduits and associated fittings shall be identical. No
conduits having an outside diameter of less than 15mm shall be used. Conduit
boxes mounted outside a building shall have external fixing lugs. Boxes shall be
of malleable cast iron and shall have a protective coating of zinc. Box covers shall
have a machined surface around the perimeter matching with similar machined
surface on the box. The cover fixing screws shall be of brass.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
Weather Proof
Cast iron mounting box & Cast aluminum alloy body
High Power Factor & High Efficiency Electronic Ballast
Heat resistant hard glass globe
Stainless steel guard, extra pure aluminum reflector
240V AC, 50HZ, LED BULB(130W).
8) LED Lighting Fixture (Pipe pendant mounting Type, Explosion Proof type)
Pipe pendant mounting type, Explosion Proof type IP65
Weather Proof
High Power Factor & High Efficiency Electronic Ballast
Cast iron mounting box & Cast aluminum alloy body
Heat resistant hard glass globe
Stainless steel guard, extra pure aluminum reflector
240V AC, 50HZ, LED BULB(130W).
10) LED Lighting Fixture(Food lighting, Stanchion mounting, Explosion Proof Type)
Explosion Proof Type
Stanchion mounting(5M) & junction box
Weather Proof, IP65
High Power Factor & High Efficiency Electronic Ballast
Cast iron mounting box & Cast aluminum alloy body
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
12) LED Lighting Fixture(Food lighting, Bracket mounting type, Explosion Proof Type)
Bracket mounting type, Explosion Proof Type
Weather Proof, IP65
High Power Factor & High Efficiency Electronic Ballast
Cast iron mounting box & Cast aluminum alloy body
Heat resistant hard glass globe
Stainless steel guard, extra pure aluminum reflector
240V AC, 50HZ, LED BULB(400W).
14) LED Lighting Fixture(Road lighting with Pole, Explosion Proof Type)
Explosion Proof Type
Weather Proof, IP65
Photo Electrically Controlled Type
Die-cast aluminum housing w/anodized aluminum mirror
Heat resistant clear acryl bowl
High Power Factor & High Efficiency Electronic Ballast
240V AC, 50HZ, LED BULB(130W)
Pole(Hot Dip Galvanized, 8m) and Concrete Base
Distribution Board
The Contractor shall provide the distribution board to supply power to the warning
lights, interior lighting and small power. The distribution board shall be mounted on
the wall inside the windshield with the top of the board being 1,800 mm above the
ground floor level.
Marine(jetty, intake and outfall etc.) Warning Signs, Lights and Signals
Marine (Jetty, Intake and Outfall etc.), warning signs, lights and signals shall be in
accordance with port authority and local regulations.
spring-return flap cover, including ELB Box(for load disconnector switch and
residual current protection device rated at 30 mA).
The plug and socket shall be interlocked such that the unit cannot be switched
on until the matching plug is fully inserted, nor can the plug be withdrawn with
the switch closed.
Facility for incoming supply cable looping, and Provision for padlocking the
switch in the off position.
4) System Box
FLOOR/WALL FLUSH MOUNTED type, weather proof type
AC 240V, 16A , 3P(Single phase+E), two outlets for power receptacletwo
outlets(Data & Voice) for communication(8pin module, RJ-45) with Cover(brass)
6. Communication System
Classes of service:
The IP-PABX shall provide various classes of service. The classes of service shall,
at minimum,
as follows:
1) internal calls only
2) internal calls plus outside calls set up by the operator
3) internal and local outside calls.
4) unrestricted calling.
Automatic call back on busy:
When a called line or subscriber is busy it shall be possible to execute a call back.
When the busy line or subscriber becomes free the system shall automatically
alert the user that the extension has become free. Once the line is picked up it
shall automatically redial the line / subscriber that were initially busy.
multiple trunk access codes:
Assignment of the trunk access codes shall be flexible, accommodating one or
two digit access codes
Automatic Route Selection (ARS):
The equipment shall allow for automatic selection of the best available trunk route
for outgoing calls. If the primary route is blocked, the PABX switches shall be able
to select a secondary route.
Night answer service:
Manual or automatic transfer or answering of incoming calls from a specified
subscriber number or energizing a common signal. Any user shall be able to
answer the call by entering a single digit code.
programmable function keys:
The telephone sets shall have programmable function keys for direct or speed
dialing of subscribers
Call forwarding:
Calls to an unattended user shall be forwarded automatically to another telephone
of the unattended user’s choice. At least three types of call forwarding shall be
supported: all calls, busy and no answer.
Call transfer:
Transferring of calls to another user shall be possible.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
Call on hold:
The telephone system shall permit users to place a call on hold and be able to
dial a third party either local or external. The user shall be able to release or hold
the call, establish a second consultation call, return to the original call or connect
the original call and the consulted party together.
Abbreviated dialing:
Abbreviated dialing of frequently dialed numbers within or outside the Plant. A
minimum of 50 numbers is required.
Call waiting:
A busy user shall receive a distinctive tone indicating that a second call is waiting.
The user
shall be able to put the first call on hold to answer the second call and be able to
return to the
original call. Call waiting shall have a visual indication on the telephone.
Camp-on:
If the called user is busy when a call is made, call- back ringing shall inform the
caller when the user becomes free by using this feature. After the extension
answers the call-back ringing, the dialed number shall be automatically redialed.
Caller ID / call logging:
The incoming caller’s phone number, or name and number shall be displayed at
system display phones, which are sent from a trunk. Answered and not answered
calls shall be logged. Logged calls shall be called back by selecting the relevant
call and pushing the redial button / key.
Conferencing:
The IP-PABX shall allow setting up multiple conference calls from 3-party up to 8-
party at the same time.
The voice recording system must provide the following functionality and features
as a minimum requirement:
configurable phone numbers (extension numbers) for voice recording
Voice recording shall start immediately when the call is established.
Start and end of voice recording shall be stored with a date and time stamp.
For all answered and unanswered calls (incoming and outgoing) the call setup
time from ringing tone issue to call connection shall be stored with a date and time
stamp.
All data, date and time stamps and the correlated voice recordings must be
locally stored within the voice recorder for at least one (1) week.
Suitable automatic back up functionality must assure:
that data or voice recording isn’t possible due to storage capacity of the voice
recorder.
that a regular back up of data or voice recordings to external storage media
takes place.
Suitable functionality shall be provided for search and playback of voice
recordings.
Statistical analysis functionality shall be provided for:
1) recorded voice calls
2) duration of individual voice recordings in average
3) voice recordings per day, week and month
4) amount of successful / unsuccessful operator call (incoming and out-going)
5) graphical presentation of the statistical analysis data.
Telephone sets
Depending on the location different kinds of telephone sets shall be foreseen (e.g.
desk telephone set, handsets, wall mounted telephone sets, explosion poof type,
special heavy duty types with telephone booths and alarm bells).
All IP-PABX switches and subscriber locations shall be equipped with IP
telephone sets with builtin display and IP to analogue bridges for the stand alone
mobile DECT handsets.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
For the selected persons at the power station advanced IP telephone sets
allowing for all exchange features shall be supplied. Pushbutton extensions
attached to these telephone sets shall contain a single push-button facility for
important contacts (e.g. NLDC, etc.). Pressing a button shall automatically
establish a call with the relevant attendant. These telephone sets shall be
connected to the existing exchange if the services described in this specification
are available.
For each workshop, storage etc. (size until 25 m²) at least 2 outlets and further
outlets one for each additional 25 m² shall be provided (2 outlets for 25 m², 3
outlets for 50 m², etc.). The network system shall be according to the Category 6
or better of the Standard ISI/ IEC IS 11801 (EN50173) with RJ 45 Western type
connectors. The design aspects of the equipment room are specified in the
TIA/EIA-569-A standard. Equipment rooms usually house equipment of higher
complexity than telecommunications closets. The star shape cabling shall go to
common marshalling places containing among others the following equipment:
marshalling racks for star shaped telephone system and data network with the
connected star shaped cables
marshalling racks for multicore telephone cables, included in the scope of the
Telephone system
spare place of at least 100% of the installed capacity and racks for the future
servers, data switches, etc. of the intended Office LAN system
power supply in a computer room of the administration building for the future
installation of computer room equipment like servers, workstations, PCs and
peripheral equipment provided by others. An Uninterruptible Power Supply (UPS)
shall be provided and shall be located at the administration building to support all
essential computing and net-working equipment. All design drawings and
diagrams for the LAN/WAN system have to be submitted for approval prior
to any implementation.
Network redundancy to be highly considered in the design on the levels of power
supplies, cable route, switches, communication cabinets location and servers
network adapters in order to guarantee 100% network availability with no single
point of failure for the LAN/WAN. Minimum 24 core armoured multi-mode fiber
optic cables shall be laid for any route (outdoor/indoor).
Minimum 10 Gigabit Ethernet standard proven technologies shall be provided in
the LAN to build high-speed redundant connections between switches and
between switches and servers. No redundant connection is required for
Employer’s PCs. Minimum 100 Mbit/sec Ethernet to the desktop shall be provided
for all PCs. Number of ports on network switches shall be determined from the
structured cabling formula used for the buildings in order for covering the entire
work area. All switches shall comply with the standard of Layer3 and Layer4
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
3) SWITCH HUB
- Switch 24Port
- FDF : 4 PORT
- FiberOptic-LAN Converter
- Lan-Lan, Internet working Equipment
- PATCH PANEL - 24PORT / PATCH CORD
- Pig tail(SC TYPE)
- RACK CABINET
4) Server
- INTEL XEON TM PROCESSORS 3.0GHZ
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
7) Telephone (Indoor)
- SIP based Digital Telephone set with digital monitor
- Desktop or Wall-Mount or stand-alone cordless telephone type
- Including Telephone Outlet(RJ-45 for Voice and Data)
- Desk telephone sets shall be used only in air-conditioned rooms and offices,
and shall have high impact, dust-tight and temperature-resistant plastic cases.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
8) Telephone (Outdoor)
- SIP based Digital Telephone set with digital monitor
- Wall-Mount, splash proof type
- Including Telephone Outlet(RJ-45 for Voice and Data)
- Wall-mounted telephone sets for use in rooms that are not air-conditioned
shall have water-and dust-tight (degree of protection at least IP 54)
temperature-resistant plastic cases or to be contained in weatherproof
container.
6.2 PA SYSTEM
The complete IP based public address (PA) system shall conform to the latest
state of art in the field of PA system engineering.
The purpose of the loudspeaker system is to inform by loudspeakers either a
particular group of people on the whole power station area (incl. GIS area) from a
central point, or to issue suitable instructions to any of these in the event of the
development of any alarm conditions, therefore all areas in the Plant containing
personnel shall be effectively reached by the loudspeaker system.
It must be possible to switch on the following different tone and frequency signals
with the appropriate alarm buttons:
1 – fire alarm
2 – major, large-scale breakdown
3 – gas alarm
4 – all-clear signal (for resetting of alarm).
The PA system shall also be supplied with a siren based annunciation system to
cover all areas within the power station (incl. GIS area).
The following call types shall be signaled by a tone:
selective call (e.g. only the loudspeakers in the switchgear building will be
switched in)
group call of several loudspeaker lines
collective call of all loudspeaker lines.
A central amplifier station shall be set up for broadcast of instructions and
information by plant personnel.
The loudspeaker lines shall be organized for the following zones (minimum)
inclusive of the rooms, which belong to them:
administration building / workshops / offices
turbine house / boiler house
CCR/ LCCs/ electronic rooms
water and waste water treatment plants
Plant water pretreatment area
coal handling plant
jetty area
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
GIS
other outdoor areas.
The instructions and broadcast announcements shall be initiated from a control
unit with microphone on the shift supervisor's desk in the central control room or
from the gatehouse.
Additionally the PA system shall be suitably interfaced to the telephone system to
enable PA announcements from each telephone (depending on the granted
permission of the dedicated telephone set).
The number and placing of the respective loudspeakers shall suit the conditions
of operation and of the environment in such a way that broad cast announcements
can be clearly understood by the operating personnel at every corner of the plant
including the GIS area and non-technical buildings,
etc. The PA system shall serve the whole plant complex, including non-technical
areas. The Contractor shall provide all necessary line balancing assemblies
required in accordance with manufacturer’s recommendations.
Except for speakers in office and similar area, all speakers shall be of the heavy-
duty industrial type with permanent magnet drivers. The speakers shall be
provided with brackets for directional adjustment. Speakers in office and
administration areas shall be ceiling mounted. The speakers in control rooms shall
be concealed above the louvered ceiling in such a manner that they do not cast
objectionable shadows.
The raceways for the PA system shall be separate from those used for other
purposes. Under no circumstances shall communications systems cables be
installed in the same cable trays or conduits with power or control cables unless
so specified.
Build-in loudspeaker
Slave units with build-in loudspeaker and microphone.
Junction boxes and auxiliaries.
The complete Potable radio system as specified under this Chapter 6.9.5.8.
This system shall include, but not limited to;
Base station tower
portable UHF transceivers and rechargeable batteries as well as additional
spare batteries with charger unit
carrying cases for above transceivers with shoulder strap
portable UHF transceivers with carrying case for use in hazardous areas
transceivers for mounting in cars
Eight (8) desk mounted radio stations
Repeater stations.
Spare capacity after completion of commissioning
At least 15% free space shall be available in all cubicles, junction boxes and
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
marshaling racks after final commissioning. This free space shall be distributed
inside the cubicles in such a way that additional terminals, equipment or modules
may be added to any group of controls.
At least 15% spare cores shall be provided in each control and monitoring cable
(above 4pairs). All spare cores have to be terminated.
At least 10% spare capacity shall be available for defining new analog signals
in long term data storage under fast and slow scanning time.
The complete clock system (IP based) as specified under this Chapter 6.9.5.5.
The clock system shall consist of:
Redundant master clock (GPS based)
Slave clocks
Standalone independent cabinet for clock system
All required cables, equipment, antennas and accessories.
All required software
Interfaces to other systems for time synchronization.
The Clock System shall be state of the art and as a minimum include a redundant
master clock, necessary number of slave clocks, independent power supply
equipment and specified interfaces for synchronizing all control and protection
systems, installed at Site.
The master clock shall provide for highly reliable, accurate and stable real time
information according NTP and Irig B protocol (or any other protocol as required
by systems to be synchronized) especially for the synchronization of the DCS in
order to ensure that time accuracy less than 1 msec. It shall be provided with
necessary interface for synchronizing form external standard time signals e.g.
GPS.
The master clock in turn shall provide necessary safe synchronizing signals to the
following:
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
7. SECURITY SYSTEM
In order to increase and enhance the level access security to the power plant
(incl. GIS) area, plant buildings, building sections and dedicated rooms an access
security system shall be provided as specified. The Access Security System shall
be fully automatic and shall provide for secure access to the specified locations.
The Access Security System shall be state of the art and as a minimum include a
master server, necessary number of control and data gathering panels, card
reader, magnetic locks, printers for ID cards, ID cards, push buttons, independent
power supply back up equipment and all software programs for the access
security system.
The Access Security System shall be based on a real time operating system and
have functions, but not limited to the following:
Management software
Software used for managing the cardholder access privileges and the policy with
at minimum listed
features:
password protection against unauthorized tampering with the system
card blocking functionality to allow access permissions to be withdrawn at any
time and that the entire key system do not need to be replaced
freely definable closed days and blocked
groups of exempted time zones
real time monitoring of events
logging of all error messages
ability of retrieving messages/alarm that indicates incidents
online analyses off personnel movements
expandable and upgradeable
automatic backup and restore facilities for at least one (1) year
history of past movements with extensive query filters
no limit for number of employees
data should be recorded and saved in printable format
report generation.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
The complete CCTV system (IP based) as specified under this Chapter 6.9.5.4.
The CCTV system shall be provided to overview complete plant, in particular:
: Sufficient number of color cameras including lenses (fixed and zoom lenses),
outings and housings to cover the whole power station (incl. GIS) area
Pan/ tilt units for movable cameras with control units for remote control
Color monitors for CCR, CH-LCC and guard houses
Software based video matrix switcher and control system
Network video recorder/ camera server with NAS
Video transmission system including cabling, launch, line equalizing, repeating
amplifiers, etc.
Special cameras for furnace flame and furnace bottom hopper viewing systems
including necessary auxiliaries such as mounting and cooling equipment.
Color monitor for furnace flame viewing system in CCR
Sensors for intrusion detection
Interfaces to other systems.
All required cables, junction boxes and auxiliaries
The CCTV (IP based) shall mainly consist of a mix of fixed and remotely controlled
cameras positioning devices located in the specific areas, optimized number of video
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
alarm and control monitors, control system for remote control, video recording
equipment, video switching matrices and transmission equipment.
IP-based colored Closed Circuit TV (CCTV) shall be provided for the observance of the
plant during erection, commissioning, re-commissioning, plant operation, etc. which
shall include, but not be limited to:
stack for stack smoke emission monitoring
boiler viewing: A number of CCTV cameras for the boiler for monitoring of burner
flames
(furnace flame viewing system) and furnace bottom hopper with adequate auxiliaries
(e.g.cooling system, etc.)
coal handling plant:
Adequate numbers of cameras to overview coal unloading, coal conveyors, coal
stockpile, stacking and reclaiming
unloading stations for fuel oil, etc.:
Adequate number of cameras for monitoring the unloading stations during unloading
activities
jetty
Adequate number of cameras for monitoring the unloading and loading activities at the
jetty
process areas:
Adequate number of cameras for monitoring of the process areas such as turbine hall,
raw coal feeders, ESP and FGD area, air heaters, boiler firing floor, ash handling areas,
cooling water pump house, demine plant area, air compressors, FGDWWTP,
condensate polishing areas, Plant water pump house etc.
electrical areas:
Adequate number of cameras for monitoring of the electrical areas such as GIS area,
cable galleries at different areas, switchgear rooms, transformer bays, CER
ash pond : Adequate number of cameras for monitoring of the ash pond area
unmanned areas: for monitoring and safety requirements
security system:
Adequate power station (incl. GIS) security facilities shall be provided for general
surveillance of the site particularly at vulnerable areas such as fences, gates and
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
revolving doors as well as building entrances. Exact locations for cameras shall be
decided during project implementation phase. A video/voice recording device, remote
control operation, multi-screen monitors shall be included in this system. Operation of
the facilities shall be from CCR, CH-LCC and gatehouse.In each case, the CCTV
system shall withstand to the site environment. The CCTV system shall have facilities of
remote control, pan, tilt, zoom, focus and other latest technology functions. For outdoor
cameras humidity conducts (i.e. wiper) shall be provided. All camera views of cameras
installed for fence monitoring shall overlap with adjacent cameras
along the entire perimeter. It shall have image tracking facility. The system must have
the features for identifying tail-gating, vehicle detection features and intrusion detection.
In the defined locations for monitor installation dedicated monitors for the CCTV system
shall be installed. The number shall be such that clear picture recognition is ensured.
In additional case, the CCTV system shall be interfaced with the large video screen
(LVS) monitors in CCR to enable viewing of CCTV picture on the LVS. The CCTV
system shall be ensured to be fully compatible with the large video screen monitor in
CCR. The Contractor shall clearly describe the CCTV system philosophy and
configuration in the bid.
System shall provide sufficient storage of all the camera recordings for a period of 30
days or more @ 25 FPS, at 4 CIF or better quality using necessary compression
techniques for all cameras.
The area under surveillance shall be monitored and controlled from CCR, CH-LCC and
guard house through workstations and/or joystick controllers.
The system shall operate normally under the maximum voltage and frequency
deviations of the power supply of the plant. It shall tolerate at least a 10% deviation in
the voltage and 2% deviation in the frequency. If necessary, conversion / correction
device for supply shall be supplied along with the equipment.
All the control equipment e.g. servers, NVR/ camera server, NAS, decoders etc. shall
be provided in standard racks.
All the cameras & control equipment shall be suitable for operation at site conditions as
specified elsewhere. This may be achieved with or without heater.
The aperture ratio (f-number) of the lenses shall be selected such that a good picture is
obtained at night with the power station and equipment lighting.
Housing of cameras meant for indoor use shall be of IP 42 rating whereas outdoor
camera housing shall be of IP 66 or better rating. These must be integrated by the
camera manufacturer. Where the environment requires, the camera and accessories
must be certified for the hazardous area i.e. explosion-proof certification as needed for
the installation location. The system shall be expandable i.e. the system shall have
facility for additional camera installation beyond the originally planned capacity.
System shall be triplex i.e. it shall provide facility of viewing, recording & replay
simultaneously.
The CCTV system shall have facility to export the desired portion of clipping (from a
desired date/time to another desired date/time) on CD or DVD. Viewing of this recording
shall be possible on standard PC using standard software like Windows media player
etc. The video surveillance application software shall support flexible 1/2/4 windows
split screen display mode or scroll mode on the PC monitor or on preview monitor as
per site requirement. The video surveillance application software shall be able to control
all cameras i.e. P/T/Z control, iris control, auto / manual focus, and color balance of
camera, selection of presets, video tour selection etc.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
The software for employers shall also be working on a browser based system for
remote users. This will allow any authorized user to display the video of any desired
camera on the monitor with full P/T/Z and associated controls.
LOCATION OF CAMERAS
When selecting the camera positions, care shall be taken to prevent the direct sunlight
or lamps from shining into the camera lens.
The viewing angle shall be shown on the layout drawings.
Contractor shall submit detailed system schematic drawings and calculations on lenses
selection for the Employer’/Engineer’s review before fabrication and installation.
MONITORS
Monitors shall be color LCD monitors and screen size shall be at least 24 inch with 1920
x 1200 minimal resolution. The monitors shall have facilities to loop the video signal
through to other monitors. The monitor shall remain dark if no camera is selected or if
there is no signal at the video input. The screen shall have a non-reflective surface. The
number of monitors must be chosen to suit the system.
1) MAIN CABINET
- WORKSTATION : Windows Based Digital Video Recorder for 32 channels with
3 Tera HDD, DVD R/W, and Motion Detection
- QUAD SWITCH : 16 PIECE
- CONTROL KEY BOARD : HALF DUPLEX TYPE
- VIDEO DISTRIBUTOR AMP (VDA) : 8CH
- AVR : 3KVA /220V
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
- FM MODULATOR - 2KM
- CCD COLOR CAMERA POLL - 6 M / SAFETY SUPPORT
- Including Bolt & Nut
- including Cable connection kit and test
: for optical/coaxial/signal/control/power cable’s connection & splicing
engineering.
The fire detection system shall be connected to an operator station at the CCR
and to the repeater stations at the security / gatehouse and the fire brigade house.
Surveillance with fire detectors shall be provided for all areas of the plant. A fire
alarm shall also trigger alarm sirens and sounders.
No restrictions on the proper functioning of fire alarm by reason of movement of
air, optical radiation, smoke, dust, vibration, high humidity, etc. are acceptable.
Moreover, fire alarms shall be located in the outgoing airflows of air-conditioning
and ventilation systems.
The alarm signal receiving units must be so designed that by use of a
standardized alarm unit socket, any of the types of detector may be used with
equal facility on any of the fire alarm circuits
Detectors installed in not readily accessible points such as cable ducts, false
floors, cable basements, etc. are to be connected in parallel to external optical
alarm indicators installed close by and in readily visible positions.
Detectors installed in false floors, suspended ceilings, cable ducts, air-
conditioning or ventilation systems are also to be combined to form separate
alarm sections.
Fire detection and alarm systems shall be arranged such that two circuits are
provided, with a minimum of two detectors on each circuit. The operation of any
one detector on either circuit shall initiate local "level l" audible and visual alarms
of fire repeated at the central control room. The operation of two detectors on
different circuits shall initiate "level 2" alarms of fire and the following actions:
Shut-down of ventilation systems and operation of fire dampers to seal
openings
Release of fire extinguisher within the enclosure.
The detectors shall be of the addressable type.
Gas detection is required for chlorination building and hydrogen building.
The term multisensory is defined among others in NFPA 72.
The system in the turbine hall shall be suitably arranged to cover all lubrication
and control oil areas – e.g. oil room, oil channels, main stop valves and turbine
bearings and shall be provided with automatic fire detection and alarm system
utilizing flame and heat detectors and automatic fixed fire extinguishing system
with alternative manual operation.
digital communicator. The alarm lines to the fire brigade shall be continuously
monitored.
The individual fire alarm lines and function lines of the fire-fighting equipment and
facilities, as well as important functional groups of the fire alarm central station (FACS)
shall be continuously monitored for faults and breakdowns e.g. for:
Wire breakage of each alarm line.
Short-circuit of each alarm line.
Earth fault of the fire alarm system.
Power supply system faulty.
Main fuses and MCB's failure.
Alarm modules disconnected from plug-in frame.
All fault signals shall be optically and audibly indicated.
For checking out the functioning of the complete fire alarm system including the fire
alarm lines and fire alarm devices, testing facilities shall be provided. When testing a
circuit, initiation of fire alarm warnings in external facilities shall be prevented. After
testing, the tested circuit shall automatically reset to normal operation.
Simulation (e.g. test pins) of all relevant fault signals as listed above as well as of all fire
alarms shall be possible in order to check-out the externally connected firefighting
facilities.
The fire alarm central station shall be provided with potential-free change-over contacts
wired to a central terminal board as follows:
Contacts to control the fire protection doors.
Contacts to control the air-conditioning and ventilation equipment.
Contacts for spare.
Activation of fire protection doors shall be signaled as a group annunciation to the fire
alarm central station and included in the alarm annunciation system.
For recording all fire alarm and fault annunciations, control instructions and operator
actions, a line printer shall be provided with the facilities for printing out the alarm line
number, date and time of day in hours and minutes.
For indicating fire alarm and fault annunciations from the fire alarm system, a layout
display board has to be provided in the panel in the central control room. This board
shall include a graphic display to show a simplified ground plan of the power plant and
of the individual buildings and shall feature signal lamps for the separate optical
indication of the alarm line, and shall include the annunciator with alarm test, reset and
acknowledge buttons. Preferably a separate monitor with appropriate graphics etc. shall
be installed. Additionally the gate house and fire brigade house shall be equipped with a
display board.
For information and guidance of fire brigade a simplified graphic display board shall be
installed in the power plant gate house and in the fire brigade house.
The fire detector system elements and the associated mountings are to be provided with
sturdy, corrosion-proof plastic housings.
The fire alarm detectors are to be provided with optical means for signaling their
activation(e.g. light-emitting diode), and are to be suitable for the connection of an
additional optical external alarm indication.
In the central control room the necessary automatic fire detectors are to be incorporated
in the luminous ceiling.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
Smoke detector
For early identification of visible smoke generation, shall consist of photoelectric unit,
alarm electronics, optical alarm indication and detector socket. Smoke detectors referred
to in this Specification shall be of multisensor type and shall be incorporated into a probe
sampling system.
Smoke detectors referred to in thus Specification shall be of optical beam type.
Flame detector
For early identification of fire outbreaks and open flames consisting of: optical unit, alarm
electronics, optical alarm indication, detector socket and variable response sensitivity.
Flame detectors referred to, in this Specification, shall be of the UV or black body
immune solar-blind IR types.
Manual call points shall be of the break-glass type and shall be established in the whole
power plant at emergency exits, accesses to staircases, doorways, exits on recognized
access or escape routes and at hose reel stations.
They shall be painted red, with an interlocking mechanism to be reset by key.
If the push button of a manual call point were to be pressed, an alarm shall be released
and indicated immediately on the panel of the fire brigade control center and on the fire
control stations in the control room of the plant and the gate house.
- Type : Addressable
- Break-glass type
- Box for Manual Call Point
- I/O Module to communicate
- Supervision of status
- Outdoor / Weather Proof type
- Outdoor type
- Accessories
The arrangement of the indoor sirens must meet the requirements at site for satisfactory
warning of the operating personnel, e.g. mounting in the turbine hall, pipe ducts etc. The
control of the sirens shall be performed automatically by the fire alarm system, but
manual operation from the central control room must also be possible.
- Type : Addressable
-. Multi-Tone
-. I/O Module to communicate
-. Supervision of status
-. Outdoor / Weather Proof type
- Accessories
9. EQUIPMENT
9.1 Transformer
1) TRANSFORMER
Type : OIL TYPE, Outdoor, Dyn11
Voltage : Primary 33kV , Secondary 11kV
Frequency : 50Hz
Wiring : 3ph, 3W
Tap : NLTC, ±2 x 2.5%
Capacity : 20MVA
Cooling : Oil Natural Air Forced
%Z : 10%
Protection : IP54
Note)
- Including Oil supply and filling to transformer by subcontractor
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection
2) TRANSFORMER
Type : OIL TYPE, Outdoor, Dyn11
Voltage : Primary 33kV , Secondary 0.415-0.24kV
Frequency : 50Hz
Wiring : 3ph, 3W(for Primary) / 4W(for Secondary)
Tap : NLTC, ±2 x 2.5%
Capacity : 0.5~3MVA
Cooling : Air Natural
%Z : 6~8%
Protection : IP54
Note)
- Including Oil supply and filling to transformer by subcontractor
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection
- Transformer Primary voltage can be changed from 33kV to 11kV if Contractor
requests at the engineering stage.
3) TRANSFORMER
Type : Mold TYPE, Outdoor, Dyn11
Voltage : Primary 11kV , Secondary 0.415-0.24kV
Frequency : 50Hz
Wiring : 3ph, 3W(for Primary) / 4W(for Secondary)
Tap : NLTC, ±2 x 2.5%
Capacity : 0.5~3MVA
Cooling : Air Natural
%Z : 6~8%
Protection : IP54
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection
1) 33kV Switchgear
Type : VCB, Outdoor, Drawout
Voltage : 38kV
Wiring : 3ph, 3W
Frequency : 50Hz
Capacity : 1250A, 25kA(for Rupturing)
Protection : IP54
Components : LA, LDS/DS, GPT/PT, CT, Power Fuse, LBS and Meter(kWatt-
Hour, Ampere, Voltage, Watt/Var, Power Factor), Digital
Protection Relay(including Over Current/Ground, Over Voltage,
Under Voltage, Directional Over Current/Ground, Ratio
Differential Current Relay, etc
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection
- LDS/DS and Power Fuse will be installed at the incoming Concrete Pole
which is outside of Panel.
2) 11kV Switchgear
Type : VCB, Outdoor, Drawout
Voltage : 12kV
Wiring : 3ph, 3W
Frequency : 50Hz
Capacity : 1250A, 31.5kA(for Rupturing)
Protection : IP54
Components : LA, LDS/DS, GPT/PT, CT, Power Fuse, LBS and Meter(kWatt-
Hour, Ampere, Voltage, Watt/Var, Power Factor), Digital
Protection Relay(including Over Current/Ground, Over Voltage,
Under Voltage, Directional Over Current/Ground, Ratio
Differential Current Relay, etc
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection
- LDS/DS and Power Fuse will be installed at the incoming Concrete Pole
which is outside of Panel.
3) 415V SWITCHGEAR
Type : ACB, Outdoor, Drawout
Voltage : 600V
Wiring : 3ph, 4W
Frequency : 50Hz
Capacity : 800~6300A, 65kA(for Rupturing)
Protection : IP54
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection
6) PFI Panel
Type : Outdoor
Voltage : 600V
Frequency : 50Hz
Power Factor fulfillment of improvement : more than 95%
Capacity : according to Transformer Capacity and load condition
Protection : IP54
Components : Capacitor Bank for Automatic Power Factor control
, Power Factor/Voltage/Ampere Meter, etc
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.
Wiring : 3ph, 4W
Frequency : 50Hz
Protection : IP54
Components : 400A(Main, MCCB), 225A x 3EA(3ph,ELB), 100A x
3EA(3ph,ELB), 40A x 4(1ph, ELB, Socket Outlet),
Ampere/Voltage meter, etc
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.
9) Repair Panel
Type : Outdoor
Voltage : 0.415-0.24kV
Wiring : 3ph, 4W
Frequency : 50Hz
Protection : IP54
Components : 400A(Main, MCCB), 225A x 3EA(3ph,ELB), 125A x
2EA(415V,3ph,ELB, Socket Outlet), 63A x 3(415V, 3ph, ELB,
Socket Outlet), 16A x 3(240V, 3ph, ELB, Socket Outlet),
Ampere/Voltage meter, etc
Note for Panel)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.
Note for Socket Outlet)
- 3P(Single-phase+E) or 5P(Three phase+Neutral+E), with male & female
connector, with spring-return flap cover
- including ELB Box(for load disconnector switch and residual current
protection device rated at 30 mA).
- The plug and socket shall be interlocked such that the unit cannot be
switched on until the matching plug is fully inserted, nor can the plug be
withdrawn with the switch closed.
- Facility for incoming supply cable looping, and Provision for padlocking the
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
10.1 Transformer
Note)
- Including Oil supply and filling to transformer by subcontractor
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.
- Cooling type can be changed to ONAF(Oil Natural Air Forced) if it is approved
by the Contractor.
- Including COS(Cut Out Switch)
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.
3) PFI Panel
Type : Outdoor
Voltage : 600V
Frequency : 50Hz
Automatic Power Factor Control : more than 95%
Protection : IP55
Components : Capacitor Bank and Power Factor control set
, Power Factor/Voltage/Ampere Meter, etc
Note)
- Bakelite Cover for cable entrance area, acrylic protection cover for exposed
area of electric connection.
Matarbari Ultra Super Critical Coal-Fired Power Project
RFQ-Technical Specification
10.6 Wire
1) ACSR 160mm2
- Including connection kits for each pole and panel of both ending points,
- Maker : BRB or equivalent
2) ACSR 60mm2
10.7 Cable
1) 33kV POWER CABLE
- Cable Spec : Fire Resistant, Water-Proof, CU/XLPE/UNARMOURED/PVC
Including Termination kit(Terminal lug, insulation tube, etc)
Note) Insulation and hi-pot test are included in bidder scope.
Trench Work. Ending area of Base Foundation's distance must to be more than
2m for the fence.
11.2 Drawings
: Detail Shop drawing for installation, Sing line Diagram, Three line Diagram,
Circuit Diagram, Layout Drawing, etc
11.4 Excavation
: Excavation on the earth for embedded piping, manhole, earthing wire work,
foundation works, etc including backfill & handling remained soil
But, Q’ty counting is applied only for excavation.
11.6 Manhole
: concrete manhole including rebar, steel cover
11.8 Painting
Including Power-tool, Epoxy primer, H B Epoxy Mastic Spray/Brush
1) FIREPROOF SEAL
2) SILICA BOARD : 300W X 610L X 30T or others
3) ROCK WOOL : 120 X 100 or others